0% found this document useful (0 votes)
34 views16 pages

8 Combined & Strap

The document discusses the design of a combined rectangular footing to support two columns. It provides design procedures and an example calculation. The procedures include determining footing dimensions, drawing shear and bending moment diagrams, calculating depth, and checking punching shear and reinforcement requirements. An example is given for a footing supporting columns with 1000 kN and 1500 kN loads at a 5m spacing. The footing is designed as a 1.7m wide by 7.4m long reinforced concrete slab with 0.8m depth.

Uploaded by

Pedro Lemba
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views16 pages

8 Combined & Strap

The document discusses the design of a combined rectangular footing to support two columns. It provides design procedures and an example calculation. The procedures include determining footing dimensions, drawing shear and bending moment diagrams, calculating depth, and checking punching shear and reinforcement requirements. An example is given for a footing supporting columns with 1000 kN and 1500 kN loads at a 5m spacing. The footing is designed as a 1.7m wide by 7.4m long reinforced concrete slab with 0.8m depth.

Uploaded by

Pedro Lemba
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

4/12/2015

By Dr . Hussein Mahmoud

DESIGN OF COMBINED
FOOTING

12-Apr-15 1

Using: Col. 1 Col. 2

plan

12-Apr-15 2

1
‫‪4/12/2015‬‬

‫‪Using:‬‬
‫الشكل مستطيل أو شبه منحرف‬
‫عمود‬
‫جار‬

‫‪P1 < P2‬‬ ‫‪P1 > P2‬‬


‫‪12-Apr-15‬‬ ‫‪3‬‬

‫‪Using:‬‬ ‫ال يشترط أن يكون العمودان على محور واحد‬

‫قاعدة إقتصادية‬

‫فكرة الحل‪:‬‬
‫نجعل مركز المحصلة فى منتصف‬ ‫قاعدة غير إقتصادية‬
‫القاعدة المجمعة حتى تكون اإلجھادات‬
‫أسفل القاعدة منتظمة‬
‫‪12-Apr-15‬‬ ‫‪4‬‬

‫‪2‬‬
4/12/2015

a) RECTANGULAR FOOTING:

Property
Line

P1 < P2

12-Apr-15 5

Data: S

Column Load (left side) P1 (kN) C1

Column Load (right side) P2 (kN) plan

Columns dimensions a1, b1, a2, b2 (m)

Spacing bet. Columns S (m) (C.L to C.L)

Max. clearance C1 or C2 (m)

Soil B.C. qna (kN /m2)

RC allowable stress fcu, fy (N/mm2)

12-Apr-15 6

3
4/12/2015

Design Procedures:  
1) RC footing dim.

R = P1 + P2
take moment about P1 P2 * S
P2 * S = R * Y Y 
R
L/2 = Y + (a1/2) + C1 ….. get L

A RC  R / q na ARC = L * B ----- get B


actual stress on soil
R
fn  ≤ qna w = fn * B (t/m’)
L*B
get C2 = L - (C1 + a1/2 + S + a2/2)

12-Apr-15 7

2) Draw S.F.D & B.M.D for long direction


Q1 = w * C1
Q2 = w * (C1+a1) – P1 1 2 3 4

Q4 = - w * C2
Q3 = -w * (C2+a2) + P2
point of zero shear at distance
x  P1 / w
C12
M1  w *
2
((C  a 1 ) 2 a
M2  w * 1  P1 * 1
2 2
C 22 (C  a 2 ) 2 a
M4  w * M3  w * 2  P2 * 2
2 2 2
2
X a
get Mmax at zero shear M max  w *  P1 * ( X  C1  1 )
2 2
12-Apr-15 8

4
4/12/2015

12-Apr-15 9

3) Depth
Q sh * 1 . 5
d sh  ----- get dI
B * q cu
Qsh at distance d from col. face -----
Qsh = Qmax – w * d
Mu = 1.5 * Mmax
Mu
d m  C1 ----- get dII
fcu * B

from dI , dII ----- get d & t = d + 5cm

12-Apr-15 10

5
4/12/2015

Check Punching Shear


Pu1 - f nu * (a1  d) * (b1  d)
q up 
2(a1  b1  2d) * d
≤ qcup
P - f * (a 2  d) * (b2  d)
q up  u2 nu
2(a 2  b 2  2d) * d

‫فى حالة عمود جار‬

Pu1 - f nu * (a1  d/2) * (b1  d) ≤ qcup


q up 
(2a1  b1  2d) * d

Pu1 = 1.5P1 & Pu2 = 1.5P2


fnu = 1.5fn

12-Apr-15 11

4) Reinforcement
M utop
A S top 
j d fy
M
A S bottom  ubottom take √ Φ √ mm / B
j d fy

As min  0.0015* B * t
Check Dev. Length

f cu
f bu  0.30
c
φ α β η (f y / γ s )  X
Ld 
4 f bu

12-Apr-15 12

6
4/12/2015

5) Transverse Direction
For Col. 1

width = a1 + 2d or
B1’ = a1 + d + C1
C3
wu1 = Pu1 / B M u1  w u1 * C 3 * * 0 . 85
2
M u1
A S1 
j d fy
…….. take
k √ Φ √ mm / B1’
As min  0.0015* B1' * t

Ld ≤ C3

12-Apr-15 13

For Col. 2

width = a2 + 2d or
B2’ = a2 + d + C2

wu2 = Pu2 / B C4
M u2  w u2 * C 4 * * 0 . 85
2
M u2
A S2 
j d fy ……. take √ Φ √ mm / B2’

As min  0.0015* B2' * t

Ld ≤ C4

12-Apr-15 14

7
4/12/2015

RFT Details

5Φ12 mm /m

5Φ12 mm /m
As1

As2
A

A
12-Apr-15 15

8
Foundation Engineering ( 5701332-3)

Example for Combined Rect. Footing:


 Data:
P1 = 1000 kN,
P2 = 1500 kN,
a1 = 40 cm,
b1 = 60 cm,
a2 = 60 cm,
b2 = 60cm,
S = 5.0 m,
C1 = 0.5 m,
qna= 200 kN/m2,
fcu = 25 N/mm2,
fy = 360 N/mm2,
qcu = 0.65 N/mm2,
qcup = 1.12 N/mm2,
qbu = 1.22 N/mm2,
C = 4,
j = 0.807

 Design Procedures:
1) RC footing dim.
R = 1000 + 1500 = 2500
1500 * 5 = 2500 * Y Y=3m
L/2 = 3 + (0.4/2) + 0.5 = 3.7 m …. L = 7.4 m
A RC  2500/200  12.5m 2
12.5 = 7.4 * B ---- Take B=1.7 m

By Dr. Hussein Mahmoud 1


Foundation Engineering ( 5701332-3)

2500
fn   199 kN/m 2
≤ qna= 200 kN/m2
7.4 * 1.7
w = 199 * 1.7 = 338 kN/m’
2) Draw S.F.D & B.M.D for long dir.
C2 = 7.4 – (0.5+0.2+5+0.3) = 1.4 m
Q1 = 338 * 0.5 = 169 kN
Q2 = 338 * (0.5+0.4) – 1000 = -696 kN
Q4 = -338 * 1.4 = -473 kN
Q3 = -338 * (1.4+0.6) + 1500 = 824 kN
point of zero shear at distance x  1000 / 338  2.96 m
(0.5) 2
M1  338 *  42 m.kN
2
( 0 .9 ) 2
M 2  338 *  1000 * 0.2  63 m.kN
2
(1.4) 2
M 4  338 *  331 m.kN
2
(1.4  0.6) 2
M 3  338 *  1500 * 0.3  226 m.kN
2
(2.96) 2
M max  338 *  1000 * (2.96  0.5  0.2)  780 m.kN
2
3) Depth
Qsh = 824 – 338 * d
1.5(824 - 338 * d)
d ----- d = 0.77 m Take d= 0.8m
1.7 * 0.65 *1000
1000-199*(0.4 0.8) * (0.6 0.8)
fp   160 kN/m2 = 0.16 N/mm2 < qcup (ok)
2(0.4 0.6  2*0.8) *0.8
1500-199*(0.6 0.8) *(0.6 0.8)
fp   248 kN/m2 = 0.25 N/mm2 < qcup (ok)
2(0.6 0.6  2*0.8) *0.8
780 * 10 6
dm  4 = 542 mm = 0.55 m
25 * 1700
Take d = 0.80 m & t = 0.85 m
4) Reinforcement
780 * 10 6
A s top  = 3356 mm2 take 12 Φ 19mm/1.7 m
0.807 * 360 * 8 00

By Dr. Hussein Mahmoud 2


Foundation Engineering ( 5701332-3)

331 * 10 6
A s bottom  = 1424 mm2
0.807 * 360 * 8 00 take 11 Φ 16mm/1.7 m
2
Asmin = 0.0015 * 1700 * 850 = 2167 mm
φ α β η (f y / γ s ) 19 *1* 0.75 *1 (360 / 1.15 )
Ld    914mm
4 f bu 4 *1.22
< x  2960 mm

5) Transverse Direction
For Col. 1 For Col. 2

width B1’ = 0.4 + 2*0.8 = 2m width B2’= 0.6 + 2*0.8 = 2.2m or


B1’ = 0.4 + .8 + 1.0 = 2.2 m B2’= 0.6 + 0.8 + 1.4 = 2.8m
Take B1’ = 2m Take B2’ = 2.2m
w1 = 1000 / 1.7 = 588 kN/m’ w2 = 1500 / 1.7 = 882 kN /m’
C3 = (1.7 - 0.6)/2 = 0.55 m C4 = (1.7 - 0.6)/2 = 0.55 m
M1 = 588 *(0.55)2*0.85/2 M1 = 882 *(0.55)2*0.85/2
= 76 m. kN = 113 m.kN
76 *106 113 *106
A s1  = 327 mm2 As 2  = 486 mm2
0.807 * 360 * 800 0.807 * 360 * 800
Asmin = 0.0015*2000* 850 = 2550
Asmin = 0.0015*2200* 850 = 2805 mm2
mm2
take 13 Φ 16 mm / 2.0m take 14 Φ 16 mm / 2.2m

16 * 0.75 * 0.75 *1 (360 / 1.15 )


Ld 
4 *1.22 Ld = 577 mm < (550+800) mm
= 577 mm < (550+800) mm

By Dr. Hussein Mahmoud 3


24/06/1436

By Dr . Hussein Mahmoud

DESIGN OF STRAP FOOTING

Property
Line

1
24/06/1436

Data:

Column load (left side) P1 (kN)

Column load (right side) P2 (kN)

Columns dimensions         a1 , b1 , a2 , b2 (m)

Spacing bet. Columns (C.L to C.L)     S (m)

Soil B.C qna ((kN //m2)

RC allowable stress  fcu, fy (N/mm2)

Design Procedures:
1) RC footings dim.

P * 1.2 L1  A 1 .…... get L1


A1 
q na

e = (L1/2) – (a1/2) S' = S - e


take moment about P2
P1 * S = R1 * S'
R1 = P1 * S / S'

Y = 0 R2 = P1 + P2 - R1

Check R1 > P1 & R2 < P2

2
24/06/1436

R1
A1  B1 = A1 / L1 …... get B1
q na

R2
A2  B2  L 2  A 2 .….. get L2 , B2
q na

w1 = R1 / L1 (kN/m’) w2 = R2 / L2 (kN/m’)
P1 P2
Statical
System

2) Draw S.F.D & B.M.D


Qa = w1 * a1 – P1 Qb = R1 – P1
Qe = – w2 * C Qd = P2 – w2 * (C+a2) C = (L2– a2)/2
Qc = P2 – R2 = Qb (as a check)
point of zero shear at distance X  P1 / w1 (inside the footing)

get Ma ---- Me &


Mmax at zero shear
h

3
24/06/1436

3) Design of Strap beam
Mu
dC Choose bstrap = bcol + 10cm
fcu * bstrap
where Mu = 1.5 1 5 Mmax
get dstrap & t = d + 5cm
Mu
A s top 
j * fy * d
take √ Φ √ mm
Md or Me *1.5
As bottom 
j * fy *d
Check shear
1.5Qsh
fsh   qcu where Qsh = max. of Q
bstrap * d
In case fsh > qcu … use stirrups & bent bars
7

Strap RFT Details

4
24/06/1436

4) Design of Footings
For Col. 1

C1 = (B1 – bstrap) / 2

fn1 = R1/(L1xB1) (kN/m2)


2
C
Mmax1  fn1 * 1 * L1
2
1.5M max1 1.5fn1 * (C1 - d)
d m1  C d sh1 
fcu * L1 q cu
get d1 bigger of dm1 & dsh1
1.5M max1
A s1 
j * fy * d 1
A s min  0.0015 * L1 * t
9

For Col. 2
C2 = (L2– a2)/2 or = (B1–bstrap)/2

fn2 = R2/(L2xB2) (kN/m2)


get Mmax2 from B.M.D …... bigger
of Me & Md
1.5M max 2
d m2  C
fcu * L 2
1 5f 2 * (C2 - d)
1.5fn
dsh2  get d2 bigger of dm2 & dsh2
qcu
1.5M max2 A s min  0 .0015 * L 2 * t
A s2 
j * fy * d 2
10