Rfi No Date Chainage Layer Description of Work From TO Length (MTRS)

The document contains details of 107 work items carried out between January 5th, 2018 and February 27th, 2018. The work items include laying concrete for pipe cradles and bottoms, retaining walls, gabion walls, and slab construction at different chainages along a project. The majority of work involved laying concrete for downsteam/upsteam pipe cradles and bottoms at various chainages.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views

Rfi No Date Chainage Layer Description of Work From TO Length (MTRS)

The document contains details of 107 work items carried out between January 5th, 2018 and February 27th, 2018. The work items include laying concrete for pipe cradles and bottoms, retaining walls, gabion walls, and slab construction at different chainages along a project. The majority of work involved laying concrete for downsteam/upsteam pipe cradles and bottoms at various chainages.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

CHAINAGE LENGTH(

RFI NO DESCRIPTION OF WORK


DATE FROM TO LAYER mtrs)
1 05.01.18 4+975 P/C DS HW&PIPE BOTTOM PCC
2 05.01.18 4+771 P/C DS HW&PIPE BOTTOM PCC
3 05.01.18 4+608 P/C DS HW&PIPE BOTTOM PCC
4 05.01.18 4+387 P/C DS HW&PIPE BOTTOM PCC
5 05.01.18 4+245 P/C DS HW&PIPE BOTTOM PCC
6 05.01.18 4+075 P/C DS HW&PIPE BOTTOM PCC
7 05.01.18 3+945 P/C DS HW&PIPE BOTTOM PCC
8 09.01.18 4+975 P/C DS CRADLE CONCRETE
9 09.01.18 4+771 P/C DS CRADLE CONCRETE
10 09.01.18 4+608 P/C DS CRADLE CONCRETE
11 09.01.18 4+387 P/C DS CRADLE CONCRETE
12 09.01.18 4+245 P/C DS CRADLE CONCRETE
13 09.01.18 4+075 P/C DS CRADLE CONCRETE
14 09.01.18 3+945 P/C DS CRADLE CONCRETE
15 09.01.18 3+810 P/C DS,US HW&PIPE BOTTOM PCC
16 09.01.18 3+335 P/C DS,US HW&PIPE BOTTOM PCC
17 09.01.18 3+115 P/C DS,US HW&PIPE BOTTOM PCC
18 10.01.18 4+975 P/C US HW&PIPE BOTTOM PCC
19 10.01.18 4+771 P/C US HW&PIPE BOTTOM PCC
20 10.01.18 4+608 P/C US HW&PIPE BOTTOM PCC
21 10.01.18 4+387 P/C US HW&PIPE BOTTOM PCC
22 10.01.18 4+245 P/C US HW&PIPE BOTTOM PCC
23 10.01.18 4+075 P/C US HW&PIPE BOTTOM PCC
24 10.01.18 3+945 P/C US HW&PIPE BOTTOM PCC
25 12.01.18 3+810 P/C BHS CRADLE CONCRETE
26 12.01.18 3+335 P/C BHS CRADLE CONCRETE
27 12.01.18 3+115 P/C BHS CRADLE CONCRETE
28 15.01.18 4+975 P/C US CRADLE CONCRETE
29 15.01.18 4+771 P/C US CRADLE CONCRETE
30 15.01.18 4+608 P/C US CRADLE CONCRETE
31 15.01.18 4+387 P/C US CRADLE CONCRETE
32 15.01.18 4+245 P/C US CRADLE CONCRETE
33 15.01.18 4+075 P/C US CRADLE CONCRETE
34 15.01.18 3+945 P/C US CRADLE CONCRETE
35 15.01.18 4.46 4.486 RW 26 RETAINING WALL CONS.
36 16.01.18 4.708 4.865 GW 157 GABION WALL CONS.
37 16.01.18 3.560 3.595 RW 35 RETAINING WALL CONS.
38 16.01.18 2+690 P/C DS HW&PIPE BOTTOM PCC
39 16.01.18 2+640 P/C DS HW&PIPE BOTTOM PCC
40 16.01.18 2+520 P/C DS HW&PIPE BOTTOM PCC
41 16.01.18 2+392 P/C DS HW&PIPE BOTTOM PCC
42 16.01.18 2+252 P/C DS HW&PIPE BOTTOM PCC
43 20.01.18 2+690 P/C DS CRADLE CONCRETE
44 20.01.18 2+640 P/C DS CRADLE CONCRETE
45 20.01.18 2+520 P/C DS CRADLE CONCRETE
46 20.01.18 2+392 P/C DS CRADLE CONCRETE
47 20.01.18 2+252 P/C DS CRADLE CONCRETE
48 22.01.2018 2+690 P/C US HW&PIPE BOTTOM PCC
49 22.01.2018 2+640 P/C US HW&PIPE BOTTOM PCC
50 22.01.2018 2+520 P/C US HW&PIPE BOTTOM PCC
51 22.01.2018 2+392 P/C US HW&PIPE BOTTOM PCC
52 22.01.2018 2+252 P/C US HW&PIPE BOTTOM PCC
53 24.01.18 4.700 5.135 SGTOP 435 FDT
54 24.01.18 4.250 4.700 SGTOP 450 FDT
55 24.1.18 1+870 P/C DS HW&PIPE BOTTOM PCC
56 24.1.18 1+734 P/C DS,US HW&PIPE BOTTOM PCC
57 24.1.18 1+660 P/C DS,US HW&PIPE BOTTOM PCC
58 24.1.18 1+445 P/C DS HW&PIPE BOTTOM PCC
59 24.1.18 1+350 P/C DS HW&PIPE BOTTOM PCC
60 24.1.18 1+055 P/C DS HW&PIPE BOTTOM PCC
61 25.01.18 3.760 4.250 SGTOP 490 FDT
62 25.01.18 3.200 3.760 SGTOP 560 FDT
63 26.01.18 2+690 P/C US CRADLE CONCRETE
64 26.01.18 2+640 P/C US CRADLE CONCRETE
65 26.01.18 2+520 P/C US CRADLE CONCRETE
66 26.01.18 2+392 P/C US CRADLE CONCRETE
67 26.01.18 2+252 P/C US CRADLE CONCRETE
68 29.01.18 4.600 5.105 GSB TOP 505 FDT
69 29.01.18 4.095 4.600 GSB TOP 505 FDT
70 31.01.18 1+870 P/C DS CRADLE CONCRETE
71 31.01.18 1+445 P/C DS CRADLE CONCRETE
72 31.01.18 1+350 P/C DS CRADLE CONCRETE
73 31.01.18 1+055 P/C DS CRADLE CONCRETE
74 31.01.18 1+734 P/C BHS CRADLE CONCRETE
75 31.01.18 1+660 P/C BHS CRADLE CONCRETE
76 02.02.18 1+870 P/C US HW&PIPE BOTTOM PCC
77 02.02.18 1+445 P/C US HW&PIPE BOTTOM PCC
78 02.02.18 1+350 P/C US HW&PIPE BOTTOM PCC
79 02.02.18 1+055 P/C US HW&PIPE BOTTOM PCC
80 03.02.18 0+982 P/C DS HW&PIPE BOTTOM PCC
81 03.02.18 0+765 P/C DS HW&PIPE BOTTOM PCC
82 03.02.18 0+600 P/C DS HW&PIPE BOTTOM PCC
83 03.02.18 0+115 P/C DS HW&PIPE BOTTOM PCC
84 05.02.18 2.640 3.110 SGTOP 470 FDT
85 06.02.18 1+870 P/C US CRADLE CONCRETE
86 06.02.18 1+445 P/C US CRADLE CONCRETE
87 06.02.18 1+350 P/C US CRADLE CONCRETE
88 06.02.18 1+055 P/C US CRADLE CONCRETE
89 8.02.18 0+982 P/C DS CRADLE CONCRETE
90 8.02.18 0+765 P/C DS CRADLE CONCRETE
91 8.02.18 0+600 P/C DS CRADLE CONCRETE
92 8.02.18 0+115 P/C DS CRADLE CONCRETE
93 10.02.18 0+982 P/C US HW&PIPE BOTTOM PCC
94 10.02.18 0+765 P/C US HW&PIPE BOTTOM PCC
95 10.02.18 0+600 P/C US HW&PIPE BOTTOM PCC
96 10.02.18 0+115 P/C US HW&PIPE BOTTOM PCC
97 14.02.18 0+982 P/C US CRADLE CONCRETE
98 14.02.18 0+765 P/C US CRADLE CONCRETE
99 14.02.18 0+600 P/C US CRADLE CONCRETE
100 14.02.18 0+115 P/C US CRADLE CONCRETE
101 15.02.18 1.650 1.870 SGTOP 220 FDT
102 20.02.18 1.075 1.450 SGTOP 375 FDT
103 24.02.18 0.420 0.433 RW 13 RETAINING WALL CONS.
104 27.02.18 0.000 0.100 SGTOP 100 FDT
105 27.02.2018 0.700 1.075 SGTOP 375 FDT
106 27.02.2018 0.300 0.700 SGTOP 400 FDT
WORK

M PCC

M PCC
M PCC
M PCC

M PCC
M PCC
M PCC
ETE

ETE
ETE
ETE

ETE
ETE
ETE

OM PCC
OM PCC
OM PCC

M PCC
M PCC
M PCC
M PCC

M PCC
M PCC
M PCC

RETE
RETE
RETE

ETE
ETE
ETE

ETE
ETE
ETE
ETE

ONS.
NS.
ONS.

M PCC
M PCC
M PCC

M PCC
M PCC
ETE
ETE
ETE
ETE
ETE

M PCC
M PCC
M PCC

M PCC
M PCC

M PCC
OM PCC
OM PCC

M PCC
M PCC
M PCC

ETE

ETE
ETE
ETE
ETE

ETE

ETE
ETE
ETE

RETE
RETE
M PCC

M PCC
M PCC
M PCC
M PCC

M PCC
M PCC
M PCC

ETE
ETE

ETE
ETE
ETE
ETE
ETE
ETE
M PCC

M PCC
M PCC
M PCC

ETE
ETE
ETE
ETE

ONS.