Schedule: Printed Version of Brief

The document outlines a 10-week schedule for a student filmmaking project (FMP). It includes the weekly activities, such as introducing the brief, developing a proposal, conducting primary research through surveys and interviews, filming, editing, and improving the final project. The necessary resources are also listed, including access to recording equipment, editing suites, and the deadline of May 16th for completion.

Uploaded by

Julio Alves
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views

Schedule: Printed Version of Brief

The document outlines a 10-week schedule for a student filmmaking project (FMP). It includes the weekly activities, such as introducing the brief, developing a proposal, conducting primary research through surveys and interviews, filming, editing, and improving the final project. The necessary resources are also listed, including access to recording equipment, editing suites, and the deadline of May 16th for completion.

Uploaded by

Julio Alves
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Schedule

Wee Date Week Activity / What you are intending Resources / What you will need
k Beginning to do - including independent to do it - including access to TV
study studio & edit suites

Printed version of brief


1 25/02/19 FMP Brief introduced
Studying of the brief
Developing ideas

Printed version of project


2 04/03/19 Project proposal template is proposal
introduced
Completing 500 word proposal

Google forms
3 11/03/19 Conduct a survey and send to 30
peers

Pod rooms
4 18/03/19 Conduct a focus group with peers
and an expert interview with a
teacher

Google forms
5 25/03/19 Analyse survey findings

Edit suites
6 01/04/19 Complete secondary research

iMac
08/04/19 Spring break
& Complete relevant pre-production
15/04/19

DSLR Camera
7 22/04/19 Filming of short film Tripod
Recorder

Edit suites
8 29/04/19 Edit film
Edit suites
9 06/05/19 Evaluation and improvements

10 13/05/19 DEADLINE Friday 16th May