Types of opinion:
Unqualified - signifies that a clear opinion is rendered
which means that the financial statements present
fairly, in all material aspects, the results of the
operations and the financial condition of the local
government unit (LGU) for the period and date
indicated, based on existing government standards,
and in compliance with government laws, rules and
regulations.
Qualified - Indicates that certain material
transactions and/or accounts have been found to
be improper, are questionable or are requiring more
solid justifications and therefore have not been
passed in audit. The transactions and/or accounts
under questions, however, are not so significant
relative to the total operations of the subject entity,
as to fully negate other aspects of operations which
were found to be in order
Adverse - Reveals that the financial statements of
the government entity do not fairly present its results
of operations and financial condition, and are not in
compliance with prescribed laws and applicable
guidelines. An adverse opinion puts to question the
entire financial operation of the subject entity and
demonstrates past and/or present management’s
inability to resolve previously disallowed transactions
1
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
Indicator Relevance/ Description Data Source SGLG Minimum Requirement
2. Compliance with Adherence of LGUs in FDP which requires 3 Conspicuous places: Actual Provinces, cities and municipalities: Full
the Full Disclosure them to fully disclose particular financial posting within LGU premises, and compliance with FDP (CY 2018 all
Policy of Local Budget transactions to show how funds are photos that show actual quarters and CY 2019 1st quarter),
and Finances, Bids and managed, disbursed and used. Posting presence of posted documents posting in:
Public Offerings (CY requirements pursuant to Section 84 of for the FDP (Certified Form 2E
2018 all quarters, CY Republic Act No. 10352 (GAA) FY 2013 and (Photo documentation) 1. Three conspicuous places
2019 1st quarter), DILG MC 2013-140. Actual posting in FDPP, and list of 2. FDP Portal
posting in: fully-compliant LGUs on FDPP -AND-
a. Three conspicuous e-SRE posting is also to be checked to verify from BLGS-PCMD
places compliance of LGUs with the requirements of List of compliant LGU on the Posting of 2017 LGU e-SRE in BLGF portal
b. FDP Portal posting online their Statement of Receipts submission of e-SRE for 2017 from
c. e-SRE and Expenditures. BLGF
2
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
Indicator Relevance/ Description Data Source SGLG Minimum Requirement
Financial Performance
3. Average local Indicates the LGU’s capacity to generate Certified Form 2K Provinces, cities and municipalities: At
revenue growth from own financial source as shown in the annual Data from SREs prepared by least 5% increase in average local
CYs 2015 to 2017 change (increase or decrease) in local Local Treasurer for CYs 2015 to revenue growth for three (3) consecutive
revenue collection over the past 3 years. 2017 years (2015-2017)
Data on average local revenue
Computation: Locally-sourced revenue = RPT growth from CYs 2015 to 2017
(basic) + Tax on Business + Other taxes + from DOF-BLGF
Regulatory fees + Service/user charge +
Receipts from economic enterprise In case of inconsistency between LGU
data and BLGF, RAT must fill-out
Change Request Form for further
verification.
(b) Meetings (Sec 110) -- LDC should have met If currently under review,
at least once in a semester consideration for PDPFP as indicated
in Disaster Preparedness area will be
(c) Created an executive committee to applied.
represent and act on behalf of the council
when it is not in session (Sec 111). This
committee is composed of the LCE as the
chairman, and the following as members:
4
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
Indicator Relevance/ Description Data Source SGLG Minimum Requirement
5
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
Indicator Relevance/ Description Data Source SGLG Minimum Requirement
4b. Functional LDC: Sec. 107 of the Code provides for the inclusion Executive Order or Resolution Provinces, cities and municipalities: CSO
Satisfactory of NGO/CSO representatives, whom are to creating the LDC (with names of participation as demonstrated in:
participation of its CSO constitute note less than ¼, of the council*. This member-CSOs and official
members aims to ensure and maximize cooperation of representatives) 1. Attendance to meetings held at least
more sectors in local development planning. List of organized and accredited once in a semester for CY 2018; AND
CSOs 2. Inputs from the CSO or actual
[*Exemption of ¼ composition: if LGU does not have LDC Minutes of the Meetings participation of CSO representative
sufficient number of organized and accredited CSO Plan of Action, if any as captured in the Minutes of
CSOs.] Documentation of workshops on Meeting or any LGU official
project prioritization conducted document, OR at least 1 CSO’s Plan
in CY 2018, if any of Action submitted in CY 2018
Post-activity report, if any
Project monitoring report, if any
5. Utilization rate of the Indicates effective management of available Certified Form 2K Provinces, cities and municipalities:
20% component of the financial resources to help LGUs implement Data from SREs prepared by
annual Internal priority development initiatives contained in Local Treasurer for CY 2017 1. Should have appropriated no less
Revenue Allotment or its local development plans and Annual Data on utilization of 20% IRA than 20% component of IRA CY 2017
Development Fund CY Investment Program through its Development component/Development Fund for development projects; AND
2017 Fund. CY 2017 from DOF-BLGF 2. By laws and related policies, 100 %
utilization of the 20% DF.
Section 287 of RA 7160 requires LGUs to Notes:
appropriate at least 20% of its annual IRA for a. In case of inconsistency between Consideration is given to an LGU that
development projects. DILG-DBM JMC 2017-1 LGU data and BLGF, RAT must fill- met the median for:
dated February 22, 2017 provides the updated out Change Request Form for Provinces = 59%,
guidelines in the use of the said fund. further verification. City = 55%, and
b. Cut-off date as of Dec. 31, 2018 Municipality = 66%
Fund utilized refers to fund disbursed.
6
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
Indicator Relevance/ Description Data Source SGLG Minimum Requirement
Fund utilized refers to fund disbursed. Notes: have 100% fund utilization reported to
a. In case of data inconsistency, BLGD as of March 26, 2019)
Computation: RAT must reconcile data, if
(Total Utilized Fund / Total Fund Allocation) x necessary, with the DILG
100% Region’s PDMU
b. Cut-off date is one-year since
In case there is excess from the total amount release of Notice to Implement
but the project is already completed, said
balance shall be returned to the national
treasury following existing guidelines on the
transfer of funds.
7
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
Indicator Relevance/ Description Data Source SGLG Minimum Requirement
8. Approved CY 2019 Timely preparation of the budget is Ordinance enacting CY 2019 Provinces, cities and municipalities: CY
annual budget fundamental to efficiently finance budget 2019 budget should have been
development at the local level. Sec 319 of approved by December 31, 2018
the Code provides that LGU’s annual budget
for the ensuing fiscal year must be enacted Consideration is given to an LGU with CY
on or before the end of the current fiscal 2019 budget approved beyond
year. December 31, 2018, but not later than
March 31, 2019 (Sec. 323).
8
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
DISASTER PREPAREDNESS
Prepare for challenges posed by disasters
1. 2018 1st Place Recognition received by the LGU due to the List of 2018 1st Place National Provinces, cities and municipalities: 2018
National Gawad proven effectiveness and efficiency of its Gawad KALASAG awardees for 1st Place National Gawad KALASAG
KALASAG (KAlamidad LDRRMC, as well as, its capacity to Best LDRRMCs from DND-OCD Awardee for Best Local DRRM Council, or
at sakuna LAbanan implement DRRM-related projects and List of 2015-2018 Gawad Hall of Fame Awardee for Best LDRRMCs
SAriling Galing ang activities to build the LGU’s resilience to KALASAG Hall of Fame category (2015 onwards)
Kalaigtasan) Awardee disasters. awardees for Best LDRRMCs from
for Best Local Disaster DND-OCD Upon official release, awardees of the
Risk Reduction and NDRRMC Memorandum Circular No. 3 s. Certified Form 2E (Photo aforementioned category for CY 2019
Management Councils 2018 stipulates the guidelines for the National Documentation) will also be considered.
(LDRRMCs), Gawad KALASAG for Best LDRRMCs and also
or Hall of Fame states the conferment of the Hall of Fame
Awardee for Best Award to LGUs which have received a
LDRRMCs, OR National Gawad KALASAG award, for three
(3) consecutive years in the same category.
9
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
Indicator Relevance/ Description Data Source SGLG Minimum Requirement
3a. Functionality of Compliance with minimum requirements of Appointment of LDRRM Officer – Provinces and cities except Manila and
LDRRMO: Plantilla establishing an LDRRM Office responsible for Head of Office with CSC Quezon City: plantilla LDRRMO IV (SG 22)
LDRRM Officer (Head of the development and implementation of attestation at least
Office) programs or strategies relative to disaster risk CSC Resolution granting the LGU
reduction pursuant to Sec. 12 of RA 10121 authority to take final action on Special cities (Manila & Quezon City):
and NDRRMC-DILG-DBM-CCC JMC 2014-1: its appointment, in case LGU is plantilla LDRRMO V (SG 24) at least
Implementing Guidelines for the accredited
Establishment of LDRRM Offices or Barangay Letter for CSC Field Office 1st to 3rd class municipalities: plantilla
DRRM Committee in LGUs. transmitting copy, and LDRRMO III (SG 18) at least
requesting attestation, of
NDRRMC-DILG-DBM-CCC JMC 2014-1 appointment, in case LGU is not 4th to 6th class municipalities: plantilla
provides for the creation of a permanent accredited LDRRMO II (SG 15) at least
(plantilla) position for a Local DRRM Officer
serving as head of the LDDRM Office. It also Consideration is given to an LGU with an
specifies the corresponding salary grade per appointed LDRRMO (Head of Office)
LGU type and the minimum qualification with temporary status; provided that said
standards for the position. temporary appointment:
1. Has not exceeded one (1) year
period;
2. Has the prescribed salary grade;
and
3. Is CSC-attested.
10
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
Indicator Relevance/ Description Data Source SGLG Minimum Requirement
4. PDPFP or CLUP PDPFP guides future land use and physical PDPFP: Provinces: Approved PDPFP
developments and the location of programs, List of Provinces with approved
projects and activities in the province. PDPFP from NEDA Consideration is given to a province
List of Provinces with PDPFP whose PDPFP is still under review;
The PDPFP is a six-year medium-term under review from NEDA provided that results of risk assessment
development plan, guided by a long-term Approved PDPFP should have already been incorporated
vision, with the first three years aligned with RLUC resolution approving PDPFP in the final draft of PDPFP, as certified by
the priorities of the Governor. The PDPFP is If PDPFP is yet to be approved: RLUC or NEDA-RO
updated on the third year to take into Certification from RLUC or
Regional NEDA stating that the
11
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
Indicator Relevance/ Description Data Source SGLG Minimum Requirement
account recent development thrusts of the final draft is currently under Cities and municipalities: Approved CLUP
new/re-elected governor. review and results of risk with zoning ordinance
assessment is already
CLUP determines the specific uses of land incorporated therein Consideration is given to a city or
and other physical and natural resources, municipality whose CLUP is still under
both private and public, within their CLUP: review; provided that results of risk
territorial jurisdiction including areas co- List of Cities and Municipalities assessment should have already been
managed with the national government with approved CLUP from HLURB incorporated in the final draft of CLUP, as
and, as appropriate, management plans for Approved CLUP certified by PLUC/Regional HLURB.
ancestral domains, critical watersheds, Zoning ordinance implementing
river basins, and protected areas. the Plan
If CLUP is yet to be approved:
The Zoning Ordinance serves as the statutory Certification from PLUC or
tool to implement the CLUP. Regional HLURB stating that the
final draft is currently under
Updated PDPFP/CLUP are those approved review and results of risk
from year 2009 to 2019. assessment is already
incorporated therein
12
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
Indicator Relevance/ Description Data Source SGLG Minimum Requirement
6. Local climate change Sec. 11 (b) of RA 10121 states that among Adopted LCCAP; AND Provinces, cities and municipalities:
action plan the duties of LDRRMCs is to “Ensure the Sanggunian resolution adopting Approved LCCAP (if stand alone) OR
integration of disaster risk reduction and LCCAP Approved PDPFP/CLUP/CDP (if
climate change adaptation into local Approved PDPFP, CLUP, or CDP mainstreamed), as verified by the DRR-
development plans, programs and budgets if LCCAP is integrated in any of CCA Focal Person of the concerned
as a strategy in sustainable development the 3 plans DILG-RO, must contain:
and poverty reduction.” In addition, the
National Disaster Preparedness Plan: Disaster 1. Results of risk assessment; and
Preparedness Minimum Standards Vol. 2 2. Climate change adaptation and
states that LCCAPs are required for mitigation actions.
provinces, cities and municipalities.
13
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
Indicator Relevance/ Description Data Source SGLG Minimum Requirement
8. Utilization rate of Section 21 of RA 10121 indicates that the Certified Form 2A Provinces, cities and municipalities:
LDRRMF’s 70% allocation LDRRM Fund must be at least 5% of the Report on LDRRMF utilization
for disaster prevention estimated revenue from regular sources to signed by the Local Accountant 1. Should have appropriated no less
and mitigation, support activities related to disaster risk and LDRRMO than 5% of the estimated revenue
preparedness, response, management which includes training, Report of LDRRMF utilization from regular sources in 2017 as
rehabilitation and purchase of disaster response and rescue posted in the FDP Portal LDRRMF for 2018; AND
recovery, CY 2018 equipment, supplies and medicines, for post-
(Current Fund) disaster activities, and payment of premiums Notes: 2. At least 50% utilization of the 70%
on calamity insurance. a. Signed report on LDRRMF component (Preparedness Fund) of
utilization must be consistent with LDRRMF for 2018 Current Fund
NDRRMC, DBM &DILG JMC No. 2013-1 the LDRRMF utilization report
provides guidance to LGUs on the allocation posted in the FDP Portal.
& utilization of the LDRRMF. 30% of the fund b. Cut-off date as of Dec. 31, 2018
goes to Quick Response Fund (QRF) while
the remaining 70% is allocated for disaster
prevention and mitigation, preparedness,
response, rehabilitation and recovery. The
assessment looks into utilization of the 70%
component only.
14
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
Indicator Relevance/ Description Data Source SGLG Minimum Requirement
15
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
Indicator Relevance/ Description Data Source SGLG Minimum Requirement
collaborate and cooperate with other using them as temporary 1. Met minimum required facilities,
stakeholders to facilitate the provision of evacuation centers, including 2. System for registration of
essential services to victims of disasters. but not limited to: (i) evacuees, and
gymnasiums, learning & activity 3. Localized information guide with
Evacuation center refers to a safe site, centers, and auditoriums be facilities or map.
building or center hosting internally utilized first; (ii) classrooms be
displaced persons, which includes covered only used when no other facility
courts, barangay/community halls, camping or space inside the school is
areas, collective centers, multi-purpose available for use as temporary
centers, established “tent cities”, or schools. evacuation center; and (iii)
designation of non- school and
Permanent evacuation centers are those childhood development
built or constructed for the specific purpose personnel as camp managers in
of evacuation during disasters. compliance with Sec 2(b) of the
IRR of RA 10821.
Semi-permanent centers may refer to Actual evacuation center and its
buildings that are LGU-owned but are at facilities
times used for purpose other than Accomplished registration
evacuation pre-disaster e.g., multi-purpose document for evacuees OR
halls. system of registration stated in
the Standard Operating
Temporary evacuation centers are schools Procedures or similar document
or child-development centers which the LGU Copy of evacuation center
sought partnership with, to use as temporary information guide
shelters during actual evacuation. MOA is
required in this type of arrangement (Sec
2(a) of the IRR of RA 10821).
11b. Evacuation The National Disaster Preparedness Plan: Certified Form 2F For cities and municipalities: At least 75%
management -- Disaster Preparedness Minimum Standards Sample evacuation guide of barangays with evacuation guides
Evacuation information Vol. 2 states that evacuation guides are
guides required for barangays.
16
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
Indicator Relevance/ Description Data Source SGLG Minimum Requirement
11c. Evacuation Presence of systems that facilitate the Inventory of stockpiled food Provinces, cities and municipalities: All of
management -- deployment and management of pre- packs and hygiene kits the following mechanisms for:
Prepositioned goods determined goods and resources even List of LGU-hired medical
and resources before the occurrence of disasters. professionals 1. Mobilization and management of
List of LGU-hired professionals volunteer groups
Indicates level of LGU readiness with the trained for psycho-social support 2. Goods for relief operations, either: (a)
ability to provide for immediate essential services and their training stockpiling that must include
needs such as relief goods, medical support certificates at least 500 food packs and 500
and medicines. Memorandum of Agreement or hygiene kits, or (b) in partnership with
equivalent documents (covering suppliers
MOA can be forged with suppliers (or in CYs 2018 and 2019) indicating 3. Medical services, provided by either
some cases, Purchase Order) such as arrangements with: volunteer in-house professionals or in
supermarkets for the prepositioning of relief groups, supermarkets (Purchase partnership with other entities
goods and other supplies, and pharmacies Order is also accepted), 4. Psycho-social support, provided by
for medical supplies based on Rule 4 Section either in-house professionals or in
pharmacies (Purchase Order is
4 (14) of the IRR of RA 10121. partnership with other entities
also accepted), medical groups,
5. Security services.
NDRRMC Disaster Preparedness Minimum psycho-social professionals and
Standards Vol. 2 prescribes that minimum for security system.
stockpiling is 500 food packs and 500 Security services indicated in the
hygiene kits. Standard Operating Procedures
or in the Security Plan of the PNP
12. Standards Operating Presence of DRRM-related mechanisms, Standard Operating Procedures Provinces, cities and municipalities must
Procedure process and structures adopted by the LGU (whether a separate document have SOP
to ensure effective coordination and or integrated in LDRRM Plan or
monitoring of actions in the event of Contingency Plan)
disasters.
12a. SOP -- LDRRM The establishment of LDRRM Operations EO or similar issuance on the Provinces and HUCs: Permanent LDRRM
Operations Center Center is pursuant to Rule 6 Section 4 (24) of establishment of LDRRM OpCen OpCen (functioning 24/7)
the IRR of RA 10121. Based on the National in case it is temporary or
Disaster Preparedness Plan: Disaster functions 24/7 Component cities and 1st to 3rd Class
Preparedness Minimum Standards Vol. 2, the OpCen Employee logbook municipalities: LDRRM OpCen
OpCen must (1) be able to function 24/7 (3 (temporary, at least functioning 24/7
shifts); (2) have a dedicated officer; and (3) during disasters)
develop and implement Standard Operating
Procedures and Contingency Plan. 4th to 6th Class municipalities: LDRRM
OpCen (temporary, at least functioning
24/7 during disasters) [Note: This forms part
17
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
Indicator Relevance/ Description Data Source SGLG Minimum Requirement
19
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
SOCIAL PROTECTION
Broaden access to social services especially the marginalized and most vulnerable in the community
1. Seal of Child-friendly Award given to LGUs in recognition of their vital role Certificate provided by CWC for Cities and municipalities: Awardee of
Local Governance, in promoting children’s rights to survival, 2018 Seal of Child-friendly Local Seal of CFLG for CY 2018 per CWC list
CY 2018 (for cities and development, protection and participation as well Governance (SCFLG)
municipalities only) as in ensuring child-friendly governance. List of SCFLG awardees for CY Consideration is given to an LGU that
2018 from CWC passed per DILG-RO level rating.
Award is given based on the results of the 2018
Child-friendly Local Governance Audit (CFLGA). In case of inconsistency between local
data and NGA data, RAT must fill-out
Change Request Form for further
verification.
2. Completion rate of, Attainment of the plans and programs targeted in Certified Form 2D Provinces, cities and municipalities:
or fund utilization for, the LSB plan for 2018. CY 2018 Accomplishment Report At least 85% completion rate on
2018 Local School of LSB Plan either PPAs or utilization rate of fund
Board (LSB) Plan As reiterated in DBM-DEPED-DILG JMC 01-2017, the CY 2018 Financial Report of LSB allocation for 2018 LSB Plan
following may be funded out of Special Education Plan
Fund (SEF): (i) Operation and maintenance of public
schools (e.g. payment of compensation/allowances of teachers); (ii) Note: Cut-off date is as of Dec. 31,
Construction and repair of school buildings; (iii) Facilities 2018.
and equipment (e.g. internet connection, maintenance, etc.); (iv)
Educational research other than the research subject
areas funded in the DepEd budget; (v)Purchase of books
and periodicals; and (vi) Expenses for school sports
activities
3a. Mechanisms for Refers to institutional mechanisms for gender On GAD: Provinces, cities and municipalities:
GAD mainstreaming required by MCW IRR Section 37. E.O or similar issuance on the All five GAD mechanisms present:
Specifically, the mechanisms are: creation, strengthening and
institutionalization of LGU GAD 1. Focal point system
(a) Focal Point System Focal Point System 2. Database
(b) Database Ordinance approving the GAD 3. 2018 Accomplishment report
(c) Accomplishment report Code 4. Updated GAD Code*
(d) Updated Code – updating may be in the form Ordinance amending/revising 5. CY 2019 Plan and Budget
of: adopting a new Code, amending or revising existing GAD Code reviewed by DILG Field Office;
particular section(s) of existing Code consideration is given to plan
(e) CY 2019 Plan and Budget
20
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
Indicator Relevance/ Description Data Source SGLG Minimum Requirement
Updating of Code entails setting aside existing If city or municipality localized the and budget that is at least
ordinances and resolutions on gender and Provincial GAD Code, resolution submitted for review
development because these: have already been referring to said localization
repealed or amended; duplicate(s) other Printed / electronic /online GAD * There is a new Code adopted not
ordinances; contrary to national laws and policies; database or information earlier than CY 2014 or an existing
and generally, requires modification to remain management system that can Code has been amended or revised
responsive to demands of current realities. generate gender statistics, and by a new ordinance enacted not
sex-disaggregated data earlier than CY 2014.
CY 2018 GAD Accomplishment
Report *Consideration may be given to an
Certificate of Review and LGU with: (a) existing Code that is
Endorsement of LGU’s GPB CY adopted not earlier than CY 2009,
2019 from DILG Field Office (b) old Code that has been
Certified Form 2E amended or revised by a new
ordinance enacted not earlier than
CY 2009; or (c) for component cities
and municipalities, localized
Provincial GAD Code; provided it
was enacted not earlier than 2009 by
the originating Sanggunian.
3b. Mechanisms for Establishment of LGU facility where cases filed in List of barangays with VAW Cities and municipalities: The
VAWC (for cities and barangays relative to violence against women and Desks/Monitoring Report of the following VAWC mechanisms:
municipalities only) children, such as physical, sexual and psychological Submission of Barangay Quarterly
abuse, can be reported and referred to pursuant to VAWC Reports 1. 100% of barangays with VAWC
RA 9262 and RA 9710. Certified Form 2J desks, AND
2. At least 80% of barangays with
LGU mechanism must be able demonstrate the submitted reports for all quarters
step-by-step process of handling cases from filing to of CY 2018
referral to resolution.
21
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
Indicator Relevance/ Description Data Source SGLG Minimum Requirement
development, protection and participation. Ordinance amending/revising existing Code has been amended or
existing Children Code revised by a new ordinance enacted
The Local Code for Children is one of the expected In case the city or municipality not earlier than CY 2014.
outputs of the Local Council for the Protection of localized the Provincial Code of
Children pursuant to RA 9344. Children: Resolution referring to Consideration may be given to an
said localization LGU with: (a) existing Code that is
Updating of Code entails setting aside existing In case the Code for Children is adopted not earlier than CY 2009,
ordinances and resolutions on this sector because integrated in another code (e.g (b) old Code that has been
these: have already been repealed or amended; Code of General Ordinances), amended or revised by a new
duplicate(s) other ordinances; contrary to national copy of said Code or ordinance ordinance enacted not earlier than
laws and policies; and generally, requires will be the MOV CY 2009; or (c) for component cities
modification to remain responsive to demands of and municipalities, localized
current realities. Provincial GAD Code; provided it
was enacted not earlier than 2009 by
the originating Sanggunian.
5. Philhealth- Presence of LGU hospitals or heath facilities Copy(ies) of 2018 and 2019 Provinces: At least 50% of LGU-run
accreditation of LGU- accredited by Philhealth to be capable of Philhealth-accreditation hospitals are 2019 or 2018 Philhealth-
run hospitals and main delivering particular health services. certificates of LGU-run hospital(s) accredited
health facilities, CY and/or facilities
2018 or 2019 Main health facilities referred herein are LGU- List of 2018 and 2019 accredited HUCs: At least 50% of LGU-run
managed hospitals and main health centers LGU-managed health facilities hospitals, if any, and/or main health
(excluding Barangay Health Stations (BHS)). Based from Philhealth centers are 2019 or 2018 Philhealth-
on CLUP Guidebook Volume 2 (adopted thru HLURB List of LGU-managed health accredited for MCP, PCB and TB-
Board Resolution No. 918 s. 2014), main health facilities(as of 1st quarter of 2019) DOTS
center engages in broad range of activities from DOH
covering mostly referrals from BHS and the In case of inconsistency between local ICCs/CCs: At least one LGU-
preventive, promotive and curative aspects of data and NGA data, RAT must fill-out managed main hospital or health
health care. Change Request Form for further facility is 2019 or 2018 Philhealth-
verification.
accredited, for all 3 – MCP, PCB and
TB-DOTS (not necessarily a 3-in-1
accreditation)
22
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
Indicator Relevance/ Description Data Source SGLG Minimum Requirement
23
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
Indicator Relevance/ Description Data Source SGLG Minimum Requirement
24
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
Indicator Relevance/ Description Data Source SGLG Minimum Requirement
of RA 9433, and the Juvenile Justice & welfare PRC license of LSWDO
Council Resolution No. 2, s. 2004 state that each LGU In case the exemption applies: Exemption: In the case where LSWDO
must appoint a duly licensed social worker as LSWDO PRC license of RSW LSWDO staff was hired prior to the enactment of
who shall be tasked to assist CAR (children-at-risk) RA 9433 or the Magna Carta for Social
and CICL (children-in-conflict-with-the-law).” Workers in 2007, there must be at least
a registered social worker serving as
License must still be valid. technical staff in the office.
26
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
Indicator Relevance/ Description Data Source SGLG Minimum Requirement
NCIP) In case of inconsistency in LGU data and Consideration may be given to an LGU
provided data, RAT must fill-out Change with extenuating circumstances, subject
Request Form for further verification. to the National Quality Committee
deliberation.
10. Absence of illegal Local Government Code of 1991 (Republic Act No. Certified Form 2H Cities: No illegal dwelling units OR
dwelling units OR LGU 7160) and the Urban Development and Housing Act Resolution adopting the City at least 50% accomplishment of CY
efforts for resettlement of 1992 (Republic Act No. 7279) stipulates the Shelter Plan 2018 targets in the approved City
of informal settlers mandate of LGUs to provide for the housing needs Status or accomplishment report Shelter Plan or resettlement PPAs
(for cities only) of “homeless constituents”. on housing projects for CY 2018 contained in the AIP
target, as indicated in the Plan,
or resettlement PPAs contained in Consideration is given to a city with
2018 AIP an office, task force or similar entity;
Ordinance, EO or similar issuance and has an approved Local Shelter
creating a Housing Office or task Plan.
force for the control, prevention
or removal of illegal dwelling units
as well as, lead in
implementation of housing/
human settlements projects
11. Implementation of Access to water supply forms part of the basic Certified Forms 2A For beneficiary cities and
Provision of Potable services and facilities that is instrumental in Status of financial municipalities:
Water Supply-Sagana promoting general welfare. accomplishment of SALINTUBIG 1. 100% utilization of funds received
at Ligtas na Tubig sa projects for funds received in CY in CYs 2012 to 2016, AND
Lahat (SALINTUBIG) SALINTUBIG program provides grant financing and 2012-2017 in the LGU 2. At least 50% utilization for funds
projects capacity development to increase access to water List of SALINTUBIG LGU- received in CY 2017.
and sanitation services and improve capacities of beneficiaries from DILG -OPDS
LGUs and Water Service Providers. Status of SALINTUBIG Projects from
DILG-OPDS reported as of CY
2019 1st Quarter
Notes:
a. In case of data inconsistency,
RAT must reconcile data, if
necessary, with the Region’s
PDMU
b. Cut-off date as of Dec. 31,
2018
27
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
1. Peace and Order An audit that looks into POCs nationwide List of LGUs that passed CY 2018 Provinces, cities and municipalities:
(POC) Performance specifically on the following performance rating from BLGS-PCMD CY 2018 POC Performance audit passer;
Audit rating, CY 2018 pillars: organization; meetings; policies, plans OR met items 2 and 3
and budget; reports and innovations. In case of inconsistency between local
data and NGA data, RAT must fill-out
Change Request Form for further
verification.
2. POC convened Frequency of POC meetings to ensure Certified Form 2I Provinces, cities and municipalities: POC
coordinated efforts among the LGU, civil Minutes of the Meetings for CY convened, at least once every quarter
society, private sector, academe and the 2018 for all quarters of CY 2018
citizenry in the suppression of criminality and
maintenance of peace and order in the
locality.
3. Peace and Order, Support of the LGU to priority action and Certified Forms 2A Provinces, cities and municipalities:
and Public Safety program thrusts that facilitates maintenance LPOC Secretariat Report for CY Adopted plan, and at least 75%
(POPS) Plan of peace and order and public safety within 2018 completion of, or utilization of fund
implementation the locality, POPSPLAN is a 3-year term based Data on utilization of funds allocated for, POPS Plan programs
plan formulated by the local POC. allocated for POPS Plan program/ and/or activities within CY 2018
activities targeted in CY 2018
The assessment focuses on the programs CY 2018 POPS Plan
and/or activities started in, and with target Accomplishment Report
completion within, CY 2018. Data on Physical and Financial
Accomplishments for CY 2018
submitted to the NPOC Secretariat
(BLGS-PCMD) thru DILG Intranet
reporting system as reference
28
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
Indicator Relevance/ Description Data Source SGLG Minimum Requirement
30
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
1a. Finalist of the PCCI's Recognition of the LGU’s exceptional and substantial Recognition received from Provinces, cities and municipalities:
Most Business-Friendly efforts and practices in promoting and enticing business, PCCI 2018 Finalist of the PCCI’s Most
LGUs Award investment and employment through its services, List of LGU Finalists of Most Business-Friendly LGUs Award; OR met
facilities or infrastructures and innovations as assessed by Business-Friendly LGUs item 1b; OR met items #2 to #7
the Philippine Chamber of Commerce Award from PCCI
1b. Ranked among the Recognition of the LGU’s exceptional and substantial Recognition received from Cities and municipalities: Belongs to
Top 50 (Top 50 Cities efforts and practices in promoting and enticing business, NCC the Top 50 cities and Top 50
and Top 50 investment and employment through its services, List of Top 50 Cities and Top municipalities of the 2018
Municipalities) of the facilities or infrastructures and innovations as assessed by 50 Municipalities in the 2018 Competitiveness Index; OR met item
2018 Competitiveness the National Competitiveness Council. Competitiveness Index from 1a; OR met items #2 to #7
Index DTI
NCC has identified 50 cities (25 HUCs and 25 ICCs and
component cities) and 50 municipalities (25 1st to 2nd
class municipalities and 25 3rd to 6th class
municipalities).
2. Presence of local Demonstrates that the LGU values promotion of efforts Ordinance creating LEIP Provinces and cities: Established
economic and to ensure local economic growth and attract office LEIPO i.e., has structure, organization
investment promotion investments with the establishment of an office or Executive order or similar and staff (An equivalent office may not
office (LEIPO) designation of personnel intended for it pursuant to DILG issuance designating an necessarily carry the exact name, as long
MC No. 2010-113. officer for LEIP with listed as it performs all the functions a LEIPO is
functions, duties and created for)
Functions of LEIPO are: (i) Facilitate preparation, responsibilities
coordination, and execution of local economic and Municipalities: designated LEIP Officer
investment promotion policies, projects and activities; (ii)
Facilitate the establishment of an aggressive, systematic,
coordinated, sustained promotion and marketing of the LGUs
as investment promotion; (iii) Provide basic information about
business potentials of the LGU including LGU services to
prospective investors to attract more investments to flow in the
community; (iv) Establish a local economic database
containing relevant facts and figures; (v) Coordinate with
other offices in the promotion of economic activities; (vi)
Coordinate with the private sector in investment promotion
campaigns; and (vii) Conduct information dissemination on
31
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
32
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
5. Tracking system for LGU measure to systematize economic database for the Database or electronically- HUCs: Computerized or computer-
business / investment- optimal use and reference of the LGU in support of DILG generated report where aided tracking system and must be
related data MC No. 2010-113 and DILG MC No. 2016-104. business application forms able to provide all four economic
are tracked and data required
Required economic data: (a) no. of new businesses in summarized
2017 and 2018; (b) no. of business renewals in 2017 and ICCs/CCs and municipalities:
2018; (c) amount of capital investment derived from Computerized or computer-aided
registered new businesses in 2018; and (d) no. of tracking system and must be able to
employees derived from registered new businesses and provide at least three of the four
business renewals in 2018. economic data required
33
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
7. Utilization of Established road network is an important infrastructure Certified Form 2A For beneficiary-provinces: 100%
Conditional matching asset that facilitates connectivity and easy transport of Status of financial utilization for funds received in CY
Grant to Provinces for goods and services from the source to the market. accomplishment of CMGP 2016 and at least 60% for CY 2017
Road Repair, projects for CY 2016 and
Rehabilitation and CMGP is a support fund provided to all eligible 2017 in the province
Improvement (CMGP; provinces to help improve quality of provincial roads Status of CMGP projects
formerly KALSADA across the country, as well as, to improve competency from DILG-OPDS (as of 1st
program), if applicable of provincial governments in local road management. quarter of 2019)
34
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
ENVIRONMENTAL MANAGEMENT
Uphold the integrity of the environment
ICCs/CCs/Municipalities: Organized
SWM Board, no operating open
and/or controlled dumpsite, AND at
least two of the following: (a)
approved SWM Plan, (b) MRF, and
(c) sanitary landfill
1. Convened local Section 11 of RA 9003 provides for the establishment of a Executive Order or similar Provinces, cities and municipalities:
solid waste Local Solid Waste Management Board and its issuance creating the SWM
management (SWM) composition. Board 1. SWM Board composition should
board Minutes of the Meeting in show CSO and private sector
Composition: CY 2018 membership and the names of
a. Provincial Solid Waste Management Board representatives
- Chair: Governor or, in the case of Palawan, Chairman 2. SWM Board convened at least
of the Palawan Council for Sustainable Development once in CY 2018
- Members: (a) All the mayors of its component cities
and municipalities; (b) One (1) representative from the
Sangguniang Panlalawigan to be represented by the
chairperson of either the Committees on Environment
or Health or their equivalent committees, to be
nominated by the presiding officer; (c) The provincial
health and/or general services officers, whichever may
be recommended by the governor; (d) The provincial
environment and natural resources officer; (e) The
provincial engineer; (f) Congressional representative/s
from each congressional district within the province;
(g) A representative from the NGO sector whose
principal purpose is to promote recycling and the
35
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
36
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
37
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
5. Access to sanitary Upon final sorting, segregation, composting, and Certified Form 2M Cities and municipalities: LGU-
landfill (SLF) recycling in the MRF, resulting residual wastes should be List of LGUs with sanitary managed SLF or access to SLF thru
transferred to long-term disposal facility or sanitary landfill from NSWMC MOA with an entity managing same
landfill. Actual sanitary landfill facility
If in partnership with another
Sec. 17(h) and 37 of RA 9003 prohibits operation of open LGU’s or private entity’s Consideration is given to an LGU with:
and controlled dumpsites as final disposal. Sec. 37 cites landfill: Memorandum of 1. Temporary Residual Containment
sanitary landfill as final disposal site of residual wastes Agreement Area, plus ongoing construction
collected from a city/ municipality, or cluster of cities and Actual temporary Residual of LGU’s own sanitary landfill
municipalities. Containment Area 2. Technology that is officially
In case of ongoing recognized by DENR-NSWMC as
Sanitary landfill refers to a waste disposal site designed, construction of sanitary an alternative to sanitary landfill
constructed, operated and maintained in a manner that landfill: actual construction
exerts engineering control over significant potential site of SLF; and project
environment impacts arising from the development and progress report(s)
operation of the facility. In case of other means of
residual waste final disposal:
Note that per NSWMC Resolution No. 79, s. 2014, “an Eco- Proof that said technology
SWM Park is not an option for waste disposal, does not officially recognized by
replace a sanitary landfill and cannot be used to extend DENR-NSWMC as an
the operation of open and controlled dumps". alternative to sanitary
landfill
38
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
39
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
2. Tourist information According to Sec. 43 of the Tourism Act, an LGU -- where Certified Form 2E For provinces, cities and
and assistance center tourism is a significant industry, shall establish a tourist Actual tourist information municipalities where tourism is a
or desk information and assistance center which shall serve as and assistance center or significant industry: Actual existence
one-stop information center or desk for tourists and desk, which may be located of a local tourism and assistance
tourism enterprises in the center or desks with promotional
provincial/city/municipal hall materials and references for the
Ordinance or similar issuance tourist sights found in the LGU
creating the tourist
information and assistance For LGUs where tourism is not
center or desk considered as a significant industry,
this criterion is not applicable
3. Tracking system of Recording of tourism data helps an LGU come up with Certified Form 2E For provinces, cities and
tourism data more informed decisions to develop the industry in the Database or record book municipalities where tourism is a
locality, as well as, ascertain the economic and social where tourism data are significant industry: Local tourism
impact of tourism in support of RA 9593. tracked and summarized database either manual or
computer-aided
At the minimum, tourism data refers to information on
the number of tourist arrivals, and registered tourism For LGUs where tourism is not
enterprises. considered as a significant industry,
this criterion is not applicable
enriching our cultural heritage and identity to be led by duties and responsibilities
an established council for the promotion of culture and compliant to DILG MC No.
the arts. 2017-133
41
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
6. Cultural property Documentation of cultural property is a cornerstone of Cultural property inventory Provinces, cities and municipalities:
inventory/registry effective cultural heritage preservation and promotion. Acknowledgement letter Cultural inventory that is:
LGUs are to maintain a record of the cultural properties from NCCA 1. Updated not earlier than 2017
under its jurisdiction. These local inventories will List of LGUs with inventory 2. Adopted by the LGU
eventually form part of the Philippine Registry of Cultural submission from NCCA 3. Submitted to NCCA for review
Property (PRECUP) that is to be managed by the
National Commission for Culture and the Arts (NCCA)
(Sec. 16 of RA 10066 and DILG-NCCA JMC No. 2018-01) Consideration is given to LGUs with
cultural inventory that is updated not
Cultural property refers to all products of human earlier than 2017, and is yet to be
creativity by which a people and a nation reveal their adopted and transmitted to NCCA
identity including places of worship, schools and natural for review.
history specimens and sites.
42
Department of the Interior and Local Government Technical Notes
Assessment for the Seal of Good Local Governance
CY 2019
7. Published narrative Availability of proper documentation of local narratives Certified Form 2E (Photo Provinces, cities, and municipalities:
of history and culture aimed to preserve and popularize historical and cultural documentation) Actual published narrative available
heritage and resources. Copy of published narrative for public consumption or reference
of history and culture on the historical and cultural
(website printscreen, book, background of the LGU
newsletter, magazine)
Proof of LGU
acknowledging narrative
published (traditional or
digital) by a third party
List of LGUs compliant with
this criterion based on 2018
SGLG assessment
###
43