0% found this document useful (0 votes)
125 views2 pages

Monthly Fire Extinguisher Maintenance Log: Green Environmental Management System (Gems)

This document is a monthly fire extinguisher maintenance log for GREEN ENVIRONMENTAL MANAGEMENT SYSTEM (GEMS) that tracks inspection and maintenance of a specific unit. It includes the unit and company details, inspection dates, notes on passing or failing condition, and signatures for approval and completion of inspections each month to ensure proper maintenance and safety.

Uploaded by

Nikka Lopez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
125 views2 pages

Monthly Fire Extinguisher Maintenance Log: Green Environmental Management System (Gems)

This document is a monthly fire extinguisher maintenance log for GREEN ENVIRONMENTAL MANAGEMENT SYSTEM (GEMS) that tracks inspection and maintenance of a specific unit. It includes the unit and company details, inspection dates, notes on passing or failing condition, and signatures for approval and completion of inspections each month to ensure proper maintenance and safety.

Uploaded by

Nikka Lopez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

For Year: _________

MONTHLY FIRE EXTINGUISHER MAINTENANCE LOG

Company Name: GREEN ENVIRONMENTAL MANAGEMENT SYSTEM (GEMS)


Company Address: Bankal Road, Lapu-lapu City, 6015 Cebu, Philippines

Company Telephone Number: 260 4331

Unit Number: ______________ Manufactured Date: _______________

Serial Number: ________________________ Location: _______________________________

TYPE: (check one) ABC Dry Chemical C02


BC Dry Chemical Pressurized Water
K Extinguisher

Recharging Date: ____________________ Hydro Test Due Date: ____________________

Next Annual Inspection Date: ___________________


Next 6-Year Inspection Date: _____________________

*
CONDITION
MONTH DATE REMEDIAL ACTION COMMENTS INITIALS
Pass Fail

January
February
March
April
May
June
July
August
September
October
November
December

VISUAL INSPECTION : Must inspect at approx 30 day interval from the previous month. Document on either this sheet
OR tag on extinguisher
Inspect Points: 1. Located in Designated Place, 2. No Obstruction to Access, 3. Label Faces Outward, Visible & Legible,
4. Safety Pin In Place, 5. Tamper Tag in Place, 6. Gauge in Safe Zone (Green Zone), 7. Lift unit & confirm if it "Feels" Full,
8. Physical Damage;

*
Please see the MONTHLY FIRE EXTINGUISHER SAFETY CHECKLIST

Annual Test Date: _______________________

Approved By: ________________________ Done By: ____________________________

You might also like