The document summarizes India's existing and planned natural gas pipeline networks as of April 1, 2018. It details the major existing pipelines operated by GAIL and other companies, with their lengths, design capacities, pipeline sizes, average flows in 2017-18, and capacity utilization percentages. It then outlines several new pipelines that are currently under execution or construction by GAIL and other authorized companies, providing their planned lengths, design capacities and pipeline sizes. In total, the existing pipeline network extends over 16,770 kms while new pipelines under development add another 11,377 kms to India's future gas transmission infrastructure.

Uploaded by

deepdixit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
119 views

NG Existing

The document summarizes India's existing and planned natural gas pipeline networks as of April 1, 2018. It details the major existing pipelines operated by GAIL and other companies, with their lengths, design capacities, pipeline sizes, average flows in 2017-18, and capacity utilization percentages. It then outlines several new pipelines that are currently under execution or construction by GAIL and other authorized companies, providing their planned lengths, design capacities and pipeline sizes. In total, the existing pipeline network extends over 16,770 kms while new pipelines under development add another 11,377 kms to India's future gas transmission infrastructure.

Uploaded by

deepdixit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Petroleum Planning & Analysis Cell

Gas Pipeline Network as on 01.04.2018


Design Average flow % Capacity
Length
Network/Region Entity Capacity Pipeline Size 2017-18 (P) utilisation 2017-
(Kms)
(mmscmd) (mmscmd) 18 (P)

Hazira-Vijaipur-Jagdishpur Pipeline/Gas
rehabilitation and expansion project GAIL 4554 53.0 36" 29.52 56%
pipeline/Dahej-Vijaipur Pipeline & spur/ Vijaipur-
Dadri Pipeline
DVPL-GREP upgradation (DVPL-II & VDPL) GAIL 1385 54.0 48" 35.92 67%
*Chhainsa-Jhajjar-Hissar Pipeline (CJPL) (Including
spur lines) commisioned up to Sultanpur, Jhajjar- GAIL 310 5.0 36" /16" 1.01 20%
Hissar under hold (111 Km)
Dahej-Uran-Panvel Pipeline (DUPL/ DPPL) GAIL 928 19.9 30"/18" 13.94 70%
including spur lines
*Dadri- Bawana-Nangal Pipeline (DBPL), Dadri-
Bawana: 106 Km, Bawana-Nangal: 501 KM, spur GAIL 852 31.0 36"/30"/24"/18" 5.49 18%
line of BNPL: 196 Km
Dabhol-Bengaluru Pipeline (Including spur) Phase GAIL 1116 16.0 36"/4" 1.27 8%
-1- 997 km, Phase 2 - 114.6 km
GAIL 48 6.0 16"/4" 2.29 38%
Kochi-Koottanad-Bengaluru-Mangalore (Phase-1)
Tripura (Agartala) GAIL 60 2.3 12" 1.30 57%
Gujarat# GAIL 685 8.3 24"/16"/12" 4.37 53%
Rajasthan (Focus Energy) GAIL 151 2.4 12" 1.35 57%
Mumbai (Uran-Thal-Usar & Trombay-RCF) GAIL 131 7.0 26" 6.43 91%
KG Basin (including RLNG+RIL) GAIL 884 16.0 18" 5.40 34%
Cauvery Basin GAIL 306 8.7 18" 3.25 38%
East- West Pipeline (RGTIL) Reliance 1480 80.0 48" 17.00 21%
Shahdol-Phulpur Pipeline (RGPL) Reliance 304 3.5 16" 0.53 15%
GSPL network including spur lines GSPL 2618 43.0 Assorted 25.33 59%
Assam Regional Network AGCL, DNPL 817 3.2 16" and others 2.25 69%
Dadri-Panipat IOCL 140 9.5 30"/10" 4.34 46%
Total 16770 369
Source: Pipeline operating companies
Note:
*CJPL and DBPL pipelines are the extension of DVPL-II / VDPL.
#GAIL's Ahmedabad, Bharuch, Vadodara (Undera) pipelines have been clubbed under Gujarat network
GAIL's Assam (Lakwa) pipeline network is in the process of being transferred to AGCL
ONGCL Uran-Trombay pipeline is for internal use
Petroleum Planning & Analysis Cell

Gas Pipeline under Execution / Construction as on 01.04.2018


Design Status of
Length
NETWORK/REGION Entity Capacity Pipeline Size Pipeline laid
in Kms
(mmscmd) (Km)
Kochi - Kottanad - Bengaluru - Mangalore GAIL(India) Ltd. 1056 16.0 24"/18"/12" 240

Dabhol -Bengaluru (DBPL) Spur Lines,


Phase-2
GAIL(India) Ltd. 302 16.0 36"/30"/24"/18" Only LMC pipelines
are being
constructed

Authorization of
Surat - Paradip GAIL(India) Ltd. 2112 74.8 36"/24"/18" this pipeline has
been cancelled
Jagdishpur- Haldia-Bokaro-Dhamra
(JHBDPL) (Phase-I, 755 Km, 7.44 MMSCMD GAIL(India) Ltd. 2539 16.0 30”/24"/18"/12”/8”/4” 577
Capacity)

Mallavaram - Bhilwada* GSPC India Transco Ltd. 2042 78.3 42”/36"/30"/24"/18"/12” 0


Mehsana - Bathinda * GSPC India Gasnet Ltd. 2052 77.1 36”/24”/18”/12” 170
Bathinda -Jammu-Srinagar* GSPC India Gasnet Ltd. 725 42.4 24”/18”/16”/12”/8”/6” 71
Kakinada - Vizag-Srikakulam * AP Gas Distribution Corporation. 391 90.0 24”/18 0

Ennore- Nellore* Gas Transmission India Pvt. Ltd. 250 36.0 24”/18” 0
Ennore-Thiruvallur-Bengaluru-Puducherry-
Indian Oil Corporation Ltd. 1385 84.7 28"/24”/16”/12"/10" 0
Nagapattinam-Madurai-Tuticorin*
Jaigarh-Mangalore* H-Energy Pvt. Ltd. 635 17.0 24" 0
Total 11377
Source : PNGRB, GAIL(India) Ltd., Pipeline authorised companies
*Competitive Bidding