Tenders based on Schedule of Quantities and Rates』

This document outlines the general conditions and definitions for a construction contract. It addresses various obligations of the contractor including following the architect's instructions, submitting a master program, using proper materials and workmanship, and complying with statutory requirements. It also defines what documents form the contract and addresses issues like setting out the works, inspections, defects, intellectual property rights, and other terms and conditions relevant to the agreement.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views2 pages

Tenders based on Schedule of Quantities and Rates』

This document outlines the general conditions and definitions for a construction contract. It addresses various obligations of the contractor including following the architect's instructions, submitting a master program, using proper materials and workmanship, and complying with statutory requirements. It also defines what documents form the contract and addresses issues like setting out the works, inspections, defects, intellectual property rights, and other terms and conditions relevant to the agreement.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Articles of Agreement

Attestation
The General Conditions
1 Interpretation and definitions
1.1 Governing law
1.2 Singular, plural, masculine and feminine
1.3 Method of reference to clauses and Articles
1.4 Articles of Agreement, Conditions and Appendix to be read as a whole
1.5 Clauses divided into sub-clauses to be read as a whole
1.6 Definitions

『1.7 Tenders based on Schedule of Quantities and Rates』

【1.7】『1.8』 The role of the Engineer

【1.8】『1.9』 Sectional completion of the Works

【1.9】『1.10』 Communications

【1.10】『1.11』 Notices of default or determination to be sent by special delivery

【1.11】『1.12』 Parties to act reasonably and expeditiously

2 Contractor's obligations
2.1 Contractor’s obligations
2.2 Contractor’s responsibility
2.3 Contractor’s skill and care
2.4 Contractor to inform Architect if he finds ambiguities in documents
3 Master programme
3.1 Master programme to be submitted
3.2 Programmes to be updated
3.3 Programme and other documents not to be documents forming the Contract
4 Architect's instructions
4.1 Architect may issue instructions up to the issue of the Final Certificate
4.2 Architect to issue instructions in writing
4.3 Compliance with Architect’s instructions
4.4 Contractor to carry out preventative work
5 Documents forming the Contract and other documents
5.1 The documents forming the Contract
5.2 Architect and Quantity Surveyor to keep documents available
5.3 Copies of documents for Contractor
5.4 Nominated Sub-Contract documents
5.5 Nominated Supply Contract documents
5.6 Further drawings, details, descriptive schedules and similar documents
5.7 Documents to be provided to Contractor on time
5.8 Electronic copies of drawings
5.9 Documents on Site
5.10 Return of drawings
5.11 Submission of manuals and assignment of warranties
5.12 Submission of as-built drawings
5.13 Limits to use of documents
5.14 Issue of Architect’s certificates
5.15 Copy of notice to be given to Employer
6 Statutory obligations
6.1 Statutory Requirements
6.2 Compliance with the Statutory Requirements
6.3 Fees or charges
6.4 Statutory undertakers and utility companies
7 Setting out the Works
Setting out and levels
8 Materials, goods, workmanship and work
8.1 Types, standards and quality
8.2 Inspection and tests
8.3 Materials, goods, workmanship or work not in accordance with Contract
8.4 Rectifying defects
8.5 Dismissal from the Works
9 Intellectual property rights