Differential Relay: National Electric Power Company (NEPCO)

The document is a maintenance report for a differential relay at a substation. It details inspection of the relay's mechanical components and testing of its operating characteristics, including [1] measuring differential current levels at various bias settings and comparing them to calculated values, and [2] testing operation of alarm contacts, trip contacts, and timing at specific current levels. The report concludes with signatures and dates from the foreman and engineer overseeing the maintenance and testing.

Uploaded by

black_eng
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
146 views

Differential Relay: National Electric Power Company (NEPCO)

The document is a maintenance report for a differential relay at a substation. It details inspection of the relay's mechanical components and testing of its operating characteristics, including [1] measuring differential current levels at various bias settings and comparing them to calculated values, and [2] testing operation of alarm contacts, trip contacts, and timing at specific current levels. The report concludes with signatures and dates from the foreman and engineer overseeing the maintenance and testing.

Uploaded by

black_eng
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

National Electric Power Company (NEPCO)

Substation Division
Protection and Metering Department
Maintenance Section
Differential Relay
1. General
Site: Circuit: Phase(s):
Type / Model No. Serial No.:
Rating Current: (A) Rating Voltage: (V) Rating Freq.: (HZ)
2. Mechanical Inspection & Tap Continuity Check:……………………………..

3.1 Electro-mechanical & Electronic relays (GEC, REYROLLE, AND BBC)


Setting: (GEC- DTH b%=………. ), (BBC g=….….. ,V=….…. ),(GEC-MBCH ,IS=…….. ).
Calculated Operating Measured Operating Current (A)
Bias Current (A)
Current (A) * ** *** R Y B
0.0

*GEC and ReyRolle Relays, (at bias 2.0 A, Id=2× b/ 1-0.5× b)


**B.B.C Relay (at bias 0 A: Id= g × IN × 100%), (at bias 2.0 A: Id = IN × g + (IB-0.5 × IN) ×V )
***GEC MBCH (at bias = 1.6A: Id = (1.15 × IB) – 0.9 +( 1.13 × IS) )

3.2 Numerical Relays (SPAD 3A1J6, SPAD 346C, KBCH):


(Basic setting IP= :………… %.) note: Vector group Setting to be Y-Y during test
Calculated Operating Measured Operating Current (A)
Bias Current (A)
Current (A) R Y B
Curve 1 Ib= 0.0
Curve 2 Ib=
Curve 3 Ib=
4. Timing Test
Measured Operating Time (ms)
Test Values (A) (All Types of Relays)
R Y B
I bias = 0 A I diff= 1.0 A
5. Operation Test
Alarm contact : Flag (LED) :
Trip Contact : Trip Lever :
Shorting Bridge :
********** For numerical relays: Tests results stored in Test set are attached
6. Remarks:
Foreman Name Eng. Name
Foreman Sign. Eng. Sign.
Date Date

Form #: QP17/01/F02 Page 1 of 1 Issue/Rev.: 1/b