This production schedule outlines filming over three days in May in London, Henley, and at a classroom location. It will involve filming Luke Burkey for lip-syncing and b-roll on the first day, group scenes with Luke Burkey and extras on the second day, and scenes of a character working hard on the third day. It also allocates time for editing from the 4th to 9th and incorporating feedback to improve the production from the 10th to 12th.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
53 views1 page
Production Schedule 5
This production schedule outlines filming over three days in May in London, Henley, and at a classroom location. It will involve filming Luke Burkey for lip-syncing and b-roll on the first day, group scenes with Luke Burkey and extras on the second day, and scenes of a character working hard on the third day. It also allocates time for editing from the 4th to 9th and incorporating feedback to improve the production from the 10th to 12th.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1
Production Schedule
Please include location, time of film, what you are filming and team members including actors
Date Plan of action Evaluation / behind
Week beginning the scenes 1st May 1st day of filming, which will be located in Weekly blogs, London, Upton Park, this will be done friend’s opinion with Luke Burkey. I will be filming both lip – syncing and also b-roll type footage which can be used during scenes. 2nd May 2nd day of filming with Luke Burkey and Weekly blogs, other background actors in Henley to friend’s opinion film group scenes to show a sense of intimidation. 3rd May Final day of filming in a classroom Weekly blogs, location, to try and show the way the friend’s opinion character working hard, doing exams trying to succeed. 4 – 9th May The editing process, I know this is a Weekly blogs longer process, and it’s something I want to take time to do and complete to a good standard. 10 – 12th May Reviewing my feedback and change Weekly blogs, what needs to be changed to my Teacher feedback. production to improve it and make it better.