Critical Path
Critical Path
1.00 Functionality and Facilities Review 01-Oct-15 31-Dec-15 92 -1251 In Progress DOP
Facilities Review - Kokotel Star 24-Aug-15 03-Sep-15 11 Completed DOP
Open Stock Lists 01-Oct-15 02-Oct-15 2 Completed DOP
Pre-Opening Budget 01-Oct-15 07-Dec-15 68 -1275 FC
Pre-Opening Budget (1st Draft) 01-Nov-15 15-Nov-15 15 -1297 FC
Pre-Opening Budget (Revision) 16-Nov-15 30-Nov-15 15 -1282 FC
Pre-Opening Budget (Final) 01-Dec-15 07-Dec-15 7 -1275 FC
Budget - Executive Hiring 1 -43620 FC
Budget - Staff Recruiting & Training 1 -43620 FC
Budget - Temporary Office space & equipment 1 -43620 FC
Budget - Sales 1 -43620 FC
Budget - Marketing 1 -43620 FC
Budget - Opertion Inventory 1 -43620 FC
Property Budget 1 -43620 FC
1st Draft 1 -43620 FC
Revision Draft 1 -43620 FC
Final Budget 1 -43620 FC
Leadership Team 01-Oct-15 31-Dec-15 92 -1251 In Progress DOP
Monitoring Pre-Opening Activities 01-Oct-15 31-Dec-15 92 -1251 All
Creation of Checklists - Each Department 31-Aug-15 11-Sep-15 12 Completed DOP
1.01 Admin & General 31-Aug-15 11-Sep-15 12 -1362 Completed DOP
1.02 IT & System 31-Aug-15 11-Sep-15 12 -1362 Completed DOP
1.03 Financial Plan 31-Aug-15 11-Sep-15 12 -1362 Completed DOP
1.04 Legal Compliance 31-Aug-15 11-Sep-15 12 -1362 Completed DOP
1.05 Risk Management 31-Aug-15 11-Sep-15 12 -1362 Completed DOP
1.06 Risk Check Lists 31-Aug-15 11-Sep-15 12 -1362 Completed DOP
1.07 Engineer 31-Aug-15 11-Sep-15 12 -1362 Completed DOP
1.08 Sales & Marketing Plan 31-Aug-15 11-Sep-15 12 -1362 Completed DOP
1.09 Quality Plan - Front Office 31-Aug-15 11-Sep-15 12 -1362 Completed DOP
1.10 Quality Plan - F&B 31-Aug-15 11-Sep-15 12 -1362 Completed DOP
1.11 Quality Plan - Housekeeping 31-Aug-15 11-Sep-15 12 -1362 Completed DOP
1.12 Staffing 31-Aug-15 11-Sep-15 12 -1362 Completed DOP
1.13 Orientation 31-Aug-15 11-Sep-15 12 -1362 Completed DOP
Breakdown & Develop Check Lists 31-Aug-15 31-Oct-15 62 -1312 All
1.01 Admin & General 1 -43620 FC/ DOP
1.02 IT & System 21-Sep-15 14-Jan-16 116 -1237 In Progress IT
Functionability & Scaleable 21-Sep-15 31-Oct-15 41 -1312 In Progress IT
Comparison - Software,system,program 21-Sep-15 31-Oct-15 41 -1312 In Progress IT
Quatation - PR & PO 01-Nov-15 30-Nov-15 30 -1282 In Progress IT
Installations & Configuration 01-Dec-15 31-Dec-15 31 -1251 IT
Training 01-Jan-16 14-Jan-16 14 -1237 IT
Test Run 15-Jan-16 31-Jan-16 17 -1220
1.03 Financial Plan 1 -43620 FC
1.04 Legal Compliance 1 -43620 AC/ENG
1.05 Risk Management 1 -43620 AC/ENG
1.06 Risk Check Lists 1 -43620 AC/ENG
1.07 Engineer 1 -43620 ENG
1.08 Sales & Marketing Plan 1 -43620 S&M
1.09 Operation Plan 01-Oct-15 30-Nov-15 61 -1282 In Progress DOP
1.10 Food & Beverage 01-Oct-15 31-Oct-15 31 -1312 In Progress F&B
1.11 Reservation & Revenue Distribution 1 -43620 RSVN&Rev
1.12 Staffing & Human Resources 1 -43620 HR/DOP
1.13 Orientation 1 -43620 HR
1 -43620
Hand over upon leasing contract signed 01-Oct-15 31-Oct-15 31 -1312 CEO
FF&E Specification 15-Oct-15 31-Oct-15 17 -1312 Owner
FF&E Inventory 15-Oct-15 31-Oct-15 17 -1312 Owner
Surface Specification 15-Oct-15 31-Oct-15 17 -1312 Owner
Vendor Lists for FF&E & Surface 15-Oct-15 31-Oct-15 17 -1312 Owner
2.00 Branding & Service Concept 01-Oct-15 31-Oct-15 31 -1312 In Progress All
Corporate Brand Attention 01-Aug-15 31-Oct-15 92 -1312 In Progress CEO
Sales Strategy 1 -43620 S&M
Marketing Strategy 1 -43620 S&M
Financial Concept 1 -43620 FC
Operation Concept 01-Oct-15 31-Oct-15 31 -1312 In Progress DOP
Café Concept 01-Oct-15 31-Oct-15 31 -1312 F&B
Guest Experiences Flow 01-Oct-15 06-Oct-15 6 -1337 Completed DOP
Hotel 01-Oct-15 06-Oct-15 6 -1337 Completed DOP
RSVN 07-Oct-15 16-Oct-15 10 -1327 In Progress DOP
Front Office 07-Oct-15 16-Oct-15 10 -1327 In Progress DOP
F&B 07-Oct-15 16-Oct-15 10 -1327 In Progress DOP
Design & Construction 01-Oct-15 31-Dec-15 92 -1251 In Progress Design/SiteDev
Design 21-Sep-15 31-Oct-15 41 -1312 In Progress SiteDev
Uniform 01-Sep-15 30-Sep-15 30 -1343 Completed CEO
Room Amenities 28-Sep-15 09-Oct-15 12 -1334 Completed SiteDev
Bag 21-Sep-15 25-Sep-15 5 -1348 Completed SiteDev
Bath Towel 21-Sep-15 25-Sep-15 5 -1348 Completed SiteDev
Bath Matt 21-Sep-15 25-Sep-15 5 -1348 Completed SiteDev
Drinking Water 21-Sep-15 25-Sep-15 5 -1348 Completed SiteDev
Coaster 21-Sep-15 25-Sep-15 5 -1348 Completed SiteDev
Lolipop 21-Sep-15 25-Sep-15 5 -1348 Completed SiteDev
Pen 28-Sep-15 09-Oct-15 12 -1334 Completed SiteDev
Straw 28-Sep-15 09-Oct-15 12 -1334 Completed SiteDev
Sugar - brown & white 28-Sep-15 09-Oct-15 12 -1334 Completed SiteDev
Umbrella 28-Sep-15 09-Oct-15 12 -1334 Completed SiteDev
3.00 Hotel Operation Forms & Tailored Amenities Lists 21-Sep-15 31-Oct-15 41 -1312 In Progress DOP
Goods Specifications & Vendor Lists 22-Sep-15 31-Oct-15 40 -1312 In Progress DOP
Room Amenities 23-Sep-15 31-Oct-15 39 -1312 In Progress DOP
Printing 24-Sep-15 31-Oct-15 38 -1312 In Progress DOP
Bedding Linen & Towel 24-Sep-15 31-Oct-15 38 -1312 In Progress DOP
Inventory 25-Sep-15 31-Oct-15 37 -1312 In Progress DOP
Quatation 26-Sep-15 31-Oct-15 36 -1312 In Progress DOP
PR & PO 01-Nov-15 30-Nov-15 30 -1282 DOP
Manufacturing (30-45 days) 01-Nov-15 30-Nov-15 30 -1282 DOP
Delivery Due 01-Dec-15 31-Dec-15 31 -1251 DOP
Store and Inventory 01-Dec-15 31-Dec-15 31 -1251 DOP
Cleaning / Put in Place / Set Up 01-Jan-16 31-Jan-16 31 -1220 DOP
Completion of Mock Up room 01-Dec-15 31-Dec-15 31 -1251 Design&Eng
4.00 Organization Chart and Staff Positioning 01-Sep-15 31-Oct-15 61 -1312 In Progress DOP
Benefit and Package - Comparison 17-Aug-15 21-Aug-15 5 Completed DOP
Benefit and Package - Finalize 21-Aug-15 16-Oct-15 57 -1327 In Progress CEO
Group Insurance - OPD / IPD / Accident 21-Aug-15 16-Oct-15 57 -1327 In Progress CEO
Provident Fund 21-Aug-15 16-Oct-15 57 -1327 In Progress CEO
Organization Chart 21-Sep-15 31-Oct-15 41 -1312 In Progress DOP
HQ Hiring Plan 21-Sep-15 29-Sep-15 9 -1344 Completed DOP
HQ Hiring Member 01-Feb-15 30-Nov-15 303 -1282 In Progress CEO/DOP
Director of Operation 01-Feb-15 30-Apr-15 89 -1496 Completed CEO
Design & ENG 01-May-15 30-May-15 30 -1466 Completed DOP
Associate of Site Dev 01-May-15 30-May-15 30 -1466 Completed DOP
Admin & Accounting Assistant 01-May-15 30-May-15 30 -1466 Completed DOP
Financial Controller - 4 months before opening 01-Oct-15 31-Oct-15 31 -1312 In Progress CEO
Sales Manager - 6 months before opening 01-Oct-15 31-Oct-15 31 -1312 In Progress CEO
Marketing Manager 01-Oct-15 31-Oct-15 31 -1312 In Progress DOP
Reservation and Revenue Distribution 01-Oct-15 31-Oct-15 31 -1312 In Progress DOP
Resident Master x 2 - 4 months before opening 01-Oct-15 31-Oct-15 31 -1312 In Progress DOP
Vacancy Conclusion with 30 days notice 01-Oct-15 30-Nov-15 61 -1282 CEO/DOP
HQ Member On Board 01-Dec-15 31-Dec-15 31 -1251 CEO
Orientation 01-Dec-15 31-Dec-15 31 -1251 CEO
Brand Introduction 01-Dec-15 31-Dec-15 31 -1251 CEO
Team Building 01-Dec-15 31-Dec-15 31 -1251 CEO
Property Hiring Plan 21-Sep-15 29-Sep-15 9 -1344 In Progress DOP
Assistant Master 01-Nov-15 30-Nov-15 30 -1282 DOP
Full Timer 01-Nov-15 30-Nov-15 30 -1282 DOP
Part Timer 01-Nov-15 30-Nov-15 30 -1282 DOP
vacancy Conclusion with 30 days notice 01-Dec-15 31-Dec-15 31 -1251 DOP
Property Staff On Board 01-Jan-16 08-Jan-16 8 -1243 DOP
Orientation 01-Jan-16 08-Jan-16 8 -1243 DOP
Team Building 11-Jan-16 31-Jan-16 21 -1220 DOP
Training - System 11-Jan-16 31-Jan-16 21 -1220 DOP
Training - SOP 11-Jan-16 31-Jan-16 21 -1220 DOP
5.00 Tailored Standard Operating Procedures 01-Oct-15 30-Nov-15 61 -1282 In Progress DOP
Guest Experience 01-Oct-15 31-Oct-15 31 -1312 In Progress DOP
Implement VIP Set Up 01-Oct-15 31-Oct-15 31 -1312 In Progress DOP
Implement SOP 01-Oct-15 30-Nov-15 61 -1282 In Progress DOP
Operational Task Force - Resident Master 01-Dec-15 31-Jan-16 62 -1220 DOP
Develop further Local SOP 01-Dec-15 31-Jan-16 62 -1220 DOP
Create Property Vision & Mission 01-Dec-15 31-Jan-16 62 -1220 DOP
Staffing & Training 01-Dec-15 31-Jan-16 62 -1220 DOP
Uniform 01-Dec-15 31-Jan-16 62 -1220 CEO/ DOP
6.00 Pre-Opening Period 01-Feb-16 01-Feb-16 1 -1219 All
Try Run System 18-Jan-16 31-Jan-16 14 -1220 All
Big Cleaning Day 11-Jan-16 17-Jan-16 7 -1234 All
7.00 Operation Supervision 1 -43620
1
1
1
1
1
November December
2-6 7 8 9-13 14 15 16-20 21 22 23-27 28 29 30-4 5 6 7-11 12 13 14-18 119 20 21-25 26 27 28-1 2 3 4-8
January Feburary
4-8 9 10 11-15 16 17 18-22 23 24 25-29 30 31 1-5 6 7 8'12 13 14 15-19 20 21 22-26 27 28 29
Hotel Live Date 01/02/2016
ADMINISTRATION & GENERAL PrioritizationStatus Duration Start
( Days )
Prioritization
1 Preparation
Equipment & Vendor Lists
Standard & Manual Set up
Procurement, Delivery & Receiving
2 HR, Staffing & Training
3 Inventory & Cleaning
4 Mock up, Trial, Testing
1-Feb-16 -1219
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
Hotel Live Date 01/02/2016
Duration
IT & SYSTEMS Prioritization Status ( Days ) Start
Customer / User (Staffs) / User (Head Quarter)
No. Property Management System (PMS)
1 PMS Comparison 1 Prepare In Progress 123 1-Oct-15
2 Quatation Received 1 Prepare 0
3 Order placed 2 Set Up 0
4 Service Level Agreement finalised 2 Set Up 0
5 Installation dates confirmed 2 Set Up 0
6 Data configuration set-up 3 Action 0
7 Data input and configuration 3 Action 0
8 Set restrictions in PMS 3 Action 0
9 Implement Rate Codes In PMS 3 Action 0
10 Enter Packages Into PMS 3 Action 0
11 Report Template 2 Set Up 0
12 System Installed & Tested 3 Action 0
13 Training dates confirmed 3 Action 0
14 Backup Systems & Protocol 4 Test 0
15 F&B Outlet Point Of Sales Systems (POS)
16 POS Comparison (software&desktop PC) 1 Prepare 0
17 Quatation Received 2 Set Up 0
18 Order placed 2 Set Up 0
19 Service Level Agreement finalised 2 Set Up 0
20 Installation dates confirmed 2 Set Up 0
21 Data configuration set-up 3 Action 0
22 Data input and configuration 3 Action 0
23 Set restrictions in POS 3 Action 0
24 Display Design for Touchscreens 2 Set Up 0
25 Enter Menu and Price in POS 3 Action 0
26 Barcode Scanner 2 Set Up 0
27 Receipt Printer & Receipt Design 2 Set Up 0
28 Payment Terminal 3 Action 0
29 Cash Drawer 3 Action 0
30 Enter Food Cost and Recipe per Menu 2 Set Up 0
31 Report Template 1 Prepare 0
32 System Installed & Tested 3 Action 0
33 Training dates confirmed 3 Action 0
34 Backup Systems & Protocol 4 Test 0
35 Channal Management System (CMS)
36 Comparison 1 Prepare 0
37 Quatation Received 2 Set Up 0
38 Order placed 2 Set Up 0
39 Service Level Agreement finalised 2 Set Up 0
40 Installation dates confirmed 2 Set Up 0
41 Data configuration set-up 3 Action 0
42 Data input and configuration 3 Action 0
43 Set restrictions in CMS 3 Action 0
44 Implement Rate Codes In CMS 3 Action 0
45 Enter Packages Into CMS 3 Action 0
46 Report Template 2 Set Up 0
47 System Installed & Tested 3 Action 0
48 Training dates confirmed 3 Action 0
49 Backup Systems & Protocol 4 Test 0
50 Revenue Management System
51 Comparison 1 Prepare 0
52 Quatation Received 2 Set Up 0
53 Order placed 2 Set Up 0
54 Service Level Agreement finalised 2 Set Up 0
55 Installation dates confirmed 3 Action 0
56 Data configuration set-up 3 Action 0
57 Data input and configuration 3 Action 0
58 Set restrictions in RMS 3 Action 0
59 Implement Rate Codes In RMS 3 Action 0
60 Enter Packages Into RMS 3 Action 0
61 Report Template 2 Set Up 0
62 System Installed & Tested 3 Action 0
63 Training dates confirmed 3 Action 0
64 Backup Systems & Protocol 4 Test 0
65 Booking Engine System
66 Comparison 1 Prepare 0
67 Quatation Received 2 Set Up 0
68 Order placed 2 Set Up 0
69 Service Level Agreement finalised 2 Set Up 0
70 Installation dates confirmed 2 Set Up 0
71 Data configuration set-up 3 Action 0
72 Data input and configuration 3 Action 0
73 Set restrictions in Booking Engine System 3 Action 0
74 Implement Rate Codes In Booking Engine Syste 3 Action 0
75 Enter Packages Into Booking Engine System 3 Action 0
76 Report Template 2 Set Up 0
77 System Installed & Tested 3 Action 0
78 Training dates confirmed 3 Action 0
79 Backup Systems & Protocol 4 Test 0
80 Financial Management System (FMS)
81 Comparison 1 Prepare 0
82 Quatation Received 2 Set Up 0
83 Order placed 2 Set Up 0
84 Service Level Agreement finalised 2 Set Up 0
85 Installation dates confirmed 2 Set Up 0
86 Data configuration set-up 3 Action 0
87 Data input and configuration 3 Action 0
88 Set restrictions in FMS 3 Action 0
89 Implement Rate Codes In FMS 3 Action 0
90 Enter Packages Into FMS 3 Action 0
91 Report Template 2 Set Up 0
92 System Installed & Tested 3 Action 0
93 Training dates confirmed 3 Action 0
94 Backup Systems & Protocol 4 Test 0
95 Server & LAN Network
96 System specifications agreed 2 Set Up 0
97 Service Level Agreement finalised 2 Set Up 0
98 Equipment Orders placed 3 Action 0
99 Installation dates confirmed 2 Set Up 0
100 System Installed & Tested 3 Action 0
101 Backup Systems & Protocol 4 Test 0
102 Workstations
103 Requirements determined 2 Set Up 0
104 System specifications agreed 2 Set Up 0
105 Service Level Agreement finalised 2 Set Up 0
106 Equipment Orders placed 2 Set Up 0
107 Installation dates confirmed 3 Action 0
108 System Installed & Tested 3 Action 0
109 Training dates confirmed 3 Action 0
110 Computer/Printers/Scanner/ Fax
111 Requirements determined 3 Action 0
112 System specifications agreed 2 Set Up 0
113 Service Level Agreement finalised 2 Set Up 0
114 Equipment Orders placed 3 Action 0
115 Installation dates confirmed 3 Action 0
116 System Installed & Tested 3 Action 0
117 Training dates confirmed 3 Action 0
118 Software Requirements
119 Requirements determined 2 Set Up 0
120 Orders placed 3 Action 0
121 Licencing
122 Software Licences obtained 2 Set Up 0
123 TV Licence application 2 Set Up 0
124 Internet Service Provider
125 Determine ISP 1 Prepare 0
126 Service Level Agreement finalised 2 Set Up 0
127 Domain registered 2 Set Up 0
128 e-mail accounts set-up 2 Set Up 0
129 Internet connectivity 3 Action 0
130 Telephone System
131 Confirm Switchboard Specifications 1 Prepare 0
132 Training dates confirmed 2 Set Up 0
133 Arrange Telkom Application 2 Set Up 0
134 Finalise Hotel Phone Number 3 Action 0
135 Finalise Hotel Fax Number 3 Action 0
136 Arrange Fax to Mail Facility 3 Action 0
137 Complete On-Hold Message Recording 4 Test 0
138 In-Room Entertainment
139 Specify requirements 1 Prepare 0
140 Order Decoders 2 Set Up 0
141 Installation & Testing 3 Action 0
142 Obtain licencing 2 Set Up 0
143 Source Public Area Music 2 Set Up 0
144 In-Room Television Welcoming Screen 2 Set Up 0
145 Music
146 Specify requirements 2 Set Up 0
147 Determine Budget 2 Set Up 0
148 Determine Workstations: Amount and Location 2 Set Up 0
149 Installation & Testing 3 Action 0
150 Timekeeping System
151 Requirements determined 1 Prepare 0
152 Determine Budget 2 Set Up 0
153 System specifications agreed 2 Set Up 0
154 Equipment Orders placed 2 Set Up 0
155 Installation dates confirmed 2 Set Up 0
156 System Installed & Tested 3 Action 0
157 Payroll System
158 Requirements determined 1 Prepare 0
159 System specifications agreed 1 Prepare 0
160 Equipment Orders placed 2 Set Up 0
161 Installation dates confirmed 2 Set Up 0
162 System Installed & Tested 3 Action 0
163 Back Office System
164 Requirements determined 1 Prepare 0
165 System specifications agreed 1 Prepare 0
166 Equipment Orders placed 2 Set Up 0
167 Determine Workstation: Amount and Location 2 Set Up 0
168 Installation dates confirmed 2 Set Up 0
169 System Installed & Tested 3 Action 0
170 Key Lock System
171 Requirements determined 1 Prepare 0
172 System specifications agreed 1 Prepare 0
173 Determine Workstation: Amount and Location 2 Set Up 0
174 Equipment Orders placed 2 Set Up 0
175 Installation dates confirmed 2 Set Up 0
176 System Installed & Tested 3 Action 0
177 Develop Comment Card/ Guest Feedback Program
178 Determine surve survey sources/ review sample1 Prepare 0
179 Develop comment forms 1 Prepare 0
180 Devlop survey procedures/system 2 Set Up 0
181 Print comment cards/forms 3 Action 0
Task
Count Assigned/
Due / Finish Down Owned By Remarks
1-Feb-16 -1219
-43620
-43620
-43620
-43620
-43620 FC/ Sales/ DOP
-43620
-43620 FC/ Sales/ DOP
-43620 Sales/ RSVN
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
Hotel Live Date 01/02/2016
FINANCIAL PLAN Prioritization Status Duratio Start
n
( Days )
Customer / User (Staffs) / User (Head Quarter)
No. Accounting Procedures
1 Obtain copy of Financial Plan Manual 1 Prepare Pending 123 1-Oct-15
2 Order Accounting Package (ACCPAC) software 1 Prepare 0
3 Establish Hotel credit policy and procedures 2 Set Up 0
4 Set-up Accounts Procedures 2 Set Up 0
5 Obtain reporting formats 2 Set Up 0
6 Obtain Accounting Procedures Manuals 2 Set Up 0
7 Set-up Dictionary of Accounts 1 Prepare 0
8 Schedule training on ACCPAC 3 Action 0
9 Set-up Accounts STAFFING 2 Set Up 0
10 Recruit Key Accounts STAFF 2 Set Up 0
11 Establish company entertainment level 2 Set Up 0
12 Develop Internal Forms 1 Prepare 0
13 Payroll
14 Establish Payroll Procedures 1 Prepare 0
15 Set-up salaries bank account 1 Prepare 0
16 Register to Bank Account 1 Prepare 0
17 Order Payroll software 2 Set Up 0
18 Order Payroll Stationery 2 Set Up 0
19 General Manager Checklist Completed post-opening3 Action 0
20 Cashier Procedures
21 Set-up cashier system for F&B 2 Set Up 0
22 Set-up house fund for Front Office 2 Set Up 0
23 Set-up Cash Advance Policy 1 Prepare 0
24 Set-up Cash Deposit Procedures 2 Set Up 0
25 Set-up Money exchange policy 2 Set Up 0
26 Set-up Paid out Policy 2 Set Up 0
27 Set-up Credit Card / Cash policy 1 Prepare 0
28 Set-up working shift closure procedures 2 Set Up 0
29 Pre-opening Budget
30 Draft pre-opening budget 1 Prepare 0
31 Pre-opening budget approval 2 Set Up 0
32 Operating Forecasts completed 2 Set Up 0
33 Hotel Budgets
34 Draft 12 mth Operating Budget 2 Set Up 0
35 Draft Capex Budget 2 Set Up 0
36 Design Profit & Loss (P&L) Review 2 Set Up 0
37 Banking
38 Set-up Bank Accounts incl. Salary Account 2 Set Up 0
39 Arrange Overdraft Facilities 2 Set Up 0
40 Set-up credit card agreements 2 Set Up 0
41 Arrange Security Cash collection 1 Prepare 0
42 Determine Operating Cash requirements 1 Prepare 0
43 Financial Reporting
44 Daily Revenue Report 2 Set Up 0
45 Daily Labor Report 2 Set Up 0
46 Period Financial Statements 1 Prepare 0
47 Period Ending Management Report 1 Prepare 0
48 Proforma Planning 1 Prepare 0
49 Annual Strategic Plan 1 Prepare 0
50 Develop Forecasting Program 2 Set Up 0
51 3 Days Forecast (Rooms) 2 Set Up 0
52 10 Days Forecast (Room & F&B) 2 Set Up 0
53 Weekly Forecast (Total Property) 2 Set Up 0
54 Asset Management
55 Open Fixed Asset Register 1 Prepare 0
56 Complete pre-opening asset stock takes 2 Set Up 0
57 See Admin & General 0
58 See Risk Management 0
59 See Legal Compliance 0
Due / Finish Count Task Assigned/ Remarks
Down Owned By
1-Feb-16 -1219
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
Hotel Live Date 01/02/2016
LEGAL COMPLIANCE Prioritization Status Duration Start
( Days )
30-Nov-15 -1282
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
Hotel Live Date 01/02/2016
RISK MANAGEMENT Status Duration
Prioritization ( Days )
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
Comprehensive Risk Management Check
Hotel Information
Name of Hotel:
Address:
Date of Construction:
Type of Construction:
Number of Floors:
Number of Basements:
Number of guest rooms/suites:
Date of Most recent renovations
Management & Leadership
Does the hotel/resort have a policy statement reflecting hotel management’s commitment to safety and
health/risk control?
Is it included in manuals, employee handbook, bulletin boards, etc.
Is one or more persons designated with the responsibility for risk control?
Reviewed with what frequency (check last revision date)?
Is senior management involved in risk control activities? (Including, but not limited to attending safety
committee meetings)
Are Guest & Life Safety and health/risk control responsibilities clearly defined in every manager’s job
description?
Have specific, measurable goals and objectives been established for all department heads relating to risk
control?
Does the hotel have an incentive program for reducing frequency/severity of accidents?
Is there a system in place for guests to provide adequate comments for the effective improvement of
systems?
Review guest survey forms
Review the personnel and processes involved in the processing, recording and actioning of information
provided from guest feedback
Does Executive management periodically review:
Incident data and detail?
Guest survey summaries?
Property damage reports?
Alarm activation reports
Employee & third party loss statistics?
Insurance premiums?
Risk/Hazard reports?
Does Executive management set annual targets for Department Managers/Department Heads risk
management performance objectives?
Are such performance objectives and expectations documented?
Does Executive Management routinely measure actual performance against such objectives (either via HR
appraisal or as an individual exercise)?
DOCUMENTED SAFETY PROCEDURES & PROTOCOLS
Is there a Documented Life and Guest Safety plan?
Who is responsible for maintaining and updating the manual?
Are their Documented Management and Safety Procedures in place for the following:
Incident Reporting and Investigation (Guest & Employee)
Bloodborne Pathogens - Food Service Operations & Housekeeping
Confined Space Entry - For Engineers & Contractors
Electrical Safety - including Energy Conservation Programs
Emergency Action Plan - Fire, Threat, Action Response
Ergonomics - Housekeeping, Service and Engineering & Maintenance
Hazard Communication/Material Safety/Secure Storage
Lockout/Tag Out & Power or Equipment Isolation
Plant & Machine Safety
Personal Protective Equipment
Workplace Safety
Lift Maintenance
Fire Safety & Fire Prevention
HVAC Systems
Boiler Operations
Power Generation & Distribution systems
Cooling Tower Maintenance
Waste Management & Handling
Business Continuity Planning
Property & Asset Maintenance
TRAINING – LIFE & GENERAL SAFETY
List the training regimens in place by Hotel Departments
Engineering
Front-of-House Personnel
Engineering & Maintenance
Security
Housekeeping
Laundry Personnel
Executive Management
Contractors
Is safety training developed and conducted for employees (permanent and casual) as well as for all
contractors?
Describe what training is done e.g. Hazard Communication/Material Safety, Blood-borne Pathogens, Safe
Lifting, Personal Protective Equipment, security, key control, job specific etc. Review all available Training
manuals and records.
Is all front-of-house staff adequately trained in guest-response protocols as relate to potential liability
scenarios (e.g. loss of property, personal injury, etc)?
Is such training attendance appropriately documented?
Are there adequate and appropriately trained first aid trained personnel amongst all front-of-house and
back- of-house employees?
Is all safety training documented and are adequate personnel records maintained? (Review documentation)
Does the maintenance schedule include the dates that the building systems maintenance was performed
and the names of the persons or companies performing the work?
Are maintenance schedules retained for at least three years?
Is all ductwork routinely inspected?
Frequency?
By whom?
Are internal linkages of all Dampers tested for free movement?
Is flushing, pre-treatment and condensate sampling undertaken for all chilled water/Processed water/hot
water/steam piping?
Is HVAC motor efficiency routinely tested?
Are there clear labels on all piping, ductwork, AHUs, and VFDs?
Are T-stats in place and regularly calibrated?
Are humidistats in place and routinely calibrated?
Are all AHU’s routinely inspected?
Are all Exhaust Fans routinely tested and inspected?
Are all Supply Fans routinely tested and inspected?
Are all Air Filter cages routinely tested and inspected?
Are all pre-filters and final filters routinely tested and inspected?
Are all HHW Pump and controls routinely tested and inspected?
Are all CHW Pump and controls routinely tested and inspected?
Are all Potable Water Pumps routinely tested and inspected?
Is all Insulation, Ductwork and Piping routinely tested and inspected?
Are all Valves, Valve tags, Valve Charts routinely tested and inspected?
Are all chilled water strainers & drain connections routinely tested and inspected?
Are all AHU supply & return pressure gauges routinely tested and inspected?
Are all AHU supplies & return thermometers routinely tested and inspected?
Are all AHU coil plugs routinely tested and inspected?
Are all Air filter gauges routinely tested and inspected?
Are all Condensate lines routinely tested and inspected?
Are all Floor drains routinely inspected?
Are all Diffusers routinely tested and inspected?
Is Electric motor drive actual load vs. Name plate load tested? Frequency?
Is Processed water pressure and temperature regularly tested?
CHILLERS & REFRIGERATION SYSTEMS
Size, Model type and Age of Chillers:
Plant Location:
Principal Servicing Contractors:
Chiller Plant Capacity:
Obtain Inventory of all Hotel Chiller Equipment and Refrigerants
What Refrigerants are utilised?
Does the hotel have in place a Refrigerant Leak Management Plan?
Is there a Refrigerant Record Keeping System?
Check & verify Maintenance Records for Existing Equipment and Refrigerant Supplies
Do the hotel maintain the following with regard to Refrigerants:
Refrigerant purchase, sales and disposal records?
Procedures for the Safe transport of refrigerants
Refrigerant tracking and record keeping
Contaminated refrigerant guidelines?
Chiller Leak testing, leak prevention and leak repairs?
Chiller Equipment and refrigerant inventory?
Refrigerant storage?
Chiller Certification for technicians?
Penalties for non-compliance?
Compliance audits and surveys?
Refrigerant recovery, recycling, and reclaiming?
Chiller Servicing practices?
Refrigerant cylinder handling & storage procedures?
Refrigerant Venting and losses?
Size and location of Commercial Refrigerators and Chillers
Maintenance Frequency? (verify through review of records)
POWER SUPPLY & DISTRIBUTION and ENERGY MANAGEMENT
Size, Model type and Age of Generators:
Plant Location:
Principal Servicing Contractors:
Generator Plant Capacity:
Details of Electrical Sub Stations on site
Size and location of SwitchBoards:
Is a system in place to monitor hotel-wide energy usage and report monthly?
Is a system in place to develop energy saving policies and procedures for the hotel?
Is energy consumption considered in all aspects of building refurbishment, plant replacement and
equipment procurement?
Does the total Building Management system that is utilised facilitate some energy usage reduction?
Are electrical maintenance procedures in place to:
Undertake Safety testing/Repairs of Electrical Equipment
Undertake assessment of Light Fittings/Power Points for function and damage
Check fixed appliances & Equipment
Replace defective Fluorescent tubes/clean Diffusers & Reflectors
Check operation Nurses Call system - rectify faults
Operation/safety checks of Power Points fixed electrical devices etc.
Operation of all Examination Lamps
Check replace circuit identification caps/labels
Operation of all Wall Clocks
Are electrical maintenance procedures in place to address:
• Motors and starters diagnostics
– Inspection
– belt drives
– lubrication
– vibration analysis
• Panels and switchgear– thermal scanning– power factor– grounding– transformers– electrical tighten-up
• Lighting
– re-lamping programs
– cleaning
– ballast changes
– controls
• Emergency power
– UPS systems
– generators
– closed/open transition switches
– lighting
• Security (building and perimeter)
– alarm systems
– cameras
– fire and smoke detection systems
– fire pumps IT&M
Check & verify the estimated heating and cooling loads based on floor areas.
Detail all hotel energy conservation measures utilized as well as the life cycle cost analyses undertaken
Are energy services shut down when and where parts of the building are unoccupied?
Have temperature settings, timers, lighting levels etc., been adjusted to ensured minimum energy use for
given comfort levels?
Is hotel energy use regularly monitored?
Is consumption of energy going down year on year?
Have targets for reducing energy consumption been set?
Has energy use been compared with energy benchmarks?
Have check been undertaken to confirm that the cheapest fuel-tariff is being used for each purpose?
Is the hotel’s energy plant-equipment less than 10 years old?
Have low-energy lights been fitted where cost-effective?
Has an energy audit been undertaken in the three years?
Are occupancy sensors or timers used to control lighting in intermittent-use areas (e.g. meeting rooms,
storage areas, public bathrooms, staff bathrooms)?
Do meeting and guest rooms have dimmer switches for lights?
Are programmable thermostats with motion detectors used to control HVAC in guestrooms?
Is glazing applied to windows throughout the hotel to prevent heat from building up?
Do guest room windows open for fresh air?
Is florescent lighting used throughout the property? What is the percentage used?
Have energy-efficient lighting fixtures been installed in each room?
Are programmable thermostats with motion detectors used to control HVAC in guest rooms?
Are housekeeping staff encouraged to close drapes and turn off lights and air conditioning when rooms are
unoccupied?
Do guest rooms have Energy Star- labeled TVs and other energy efficient appliances?
ELECTRICAL SAFETY
SWITCHBOARDS
Are all switchboards:
Locked (& lockable)?
Securely fixed to wall structures?
Have operable isolating switches?
FITTINGS and OUTLETS
Do all electrical fittings comply with AS3000 (or equivalent if international) wiring rules?
Are all electrical fittings fitted with an earth leakage device or a residual current device?
Does the portable generator comply with AS2790?
If supply is from a permanent outlet, is an earth leakage device fitted?
Are all power outlets controlled by a double pole switch?
Do portable outlets:
Have a flexible cord rated at 10 amperes minimum?
Have overload and earth leakage (ELCB) protection?
EXTENSION CORDS & FITTINGS
Are all fittings wired identically so that identical phases will be selected by the pin?
Are all cords:
Supported above work areas, wet areas and passages?
Protected from mechanical damage and moisture?
Heavy duty, conforming to AS3199?
POWERED MACHINES & PORTABLE TOOLS
Are the following in good condition and good working order:
Guards?
Blades?
Outer casings?
Power cords?
On/off switches?
Does all electrical equipment carry up-to-date inspection tags?
INSPECTION AND TESTING
Does the hotel have in place detailed inspection, testing and maintenance procedures in place to ensure
that all electrical apparatus (front and back of house and “in-room”) is safe to use?
Check random equipment, tools and appliances (front and back of house and “in-room”).
Is there any evidence of damage to the ‘permanent’ wiring, cables or electrical enclosures?
Is there any evidence of damage to any electrical apparatus or equipment in the workplace?
Are there any damaged or loose power points or switches?
Is outer protective insulation or the sheaths of any cable damaged or ‘pulled back’ exposing the inner wires?
Are exposed live wires or conductors accessible without the use of a tool or key?
Are there any accessible ‘bare’ wires inside the switchboard?
RESIDUAL CURRENT DEVICES (RCDS)
Is RCD protection provided for all electrical equipment that is:
Hand held?
Moved while in operation?
Moved from place to place?
Operated in a demanding environment?
If the workplace is a new installation (built after 1996), is fixed (non-portable) RCD protection provided for all
socket outlets?
Are the RCDs being tested as required by Standards?
WORK PRACTICES
Are qualified electricians employed by the hotel or otherwise engaged to undertake electrical work as
required?
Do electricians (Hotel Employees or Contractors) issue Certificates of Compliance on the completion of all
electrical works?
Are extension cords appropriately stored and routinely inspected & tagged?
WASTE & ENVIRONMENTAL MANAGEMENT - SYSTEMS & FACILITIES
Inspect & assess waste collection areas
Is hotel waste separated and collected as Biodegradable (Wet) and Non biodegradable (Dry) waste?
Are clearly marked (or colour coded) waste receptacles utilsed?
Frequency of waste collection?
Waste collection undertaken by whom?
Are compactors utilised? If yes type and size.
Are recyclable paper, cardboard and metals materials separated?
Does the hotel operate a biomethane plant?
Is Composting/ Vermicomposting undertaken for kitchen (food) waste?
Does the property have an effective recycling program for items that can be recycled locally?
Is waste collected and kept in tight-fitting containers and in an enclosed area?
Are items reused on property when possible, given to staff or donated to charities instead of being thrown
away?
Does the property minimize its use of individually bottled Guest room amenities and plastic bags?
Does the property compost garden and kitchen waste?
Does the property minimize its use of disposable items (e.g. Plastic bags, plastic tableware, disposable cups,
cook caps and Aprons, paper napkins) and single serving food packages (e.g. Butter, sugar, cream, jams,
condiments, milk, juices and cereals)?
Does the property have an effective program to collect and/or recycle used cooking oil?
Does the property clean the grease trap frequently and without harsh chemicals?
Does the property purchase chemicals such as cleaning agents, laundry chemicals, and dishwashing
chemicals in bulk containers?
Does the property ask chemical suppliers to take back empty Chemical containers?
Are housekeeping, laundry, and kitchen cleaning agents and Chemicals dispensed using automatic chemical
dispensing Systems?
Does the property use environmentally friendly chemicals and minimize its use of hazardous chemicals in its
maintenance operations (e.g., drain cleaners, de-scaling acid, solvents)?
Does the hotel effectively dispose of the following reusable materials:
Grey water?
Beverage bottles?
Office paper?
Containers from suppliers?
Soap bars from guest rooms?
Old linens (and pillows/pillow stuffing)?
Damaged furniture?
Ink cartridges for printers?
Organic waste (kitchen and yard scraps)?
Paper and cardboard?
Glass bottles and jars?
Aluminum cans and foil?
Steel cans and steel scrap?
Used cooking oil?
Motor oil?
Has the hotel reduced or eliminated the use of single-use items such as paper napkins and disposable
plates, cups, cutlery, place mats, aprons and cook hats?
Has the hotel communicated formally with their suppliers to communicate the hotel’s Environmental policy
and identify preferences for packaging?
Does the hotel have sewage and waste effluent treatment plants? Describe:
Is sewage from the hotel treated before being discharged to fresh water?
Have necessary discharge licenses been obtained?
Have options for reducing CFC use been researched and implemented?
Has the hotel been free of complaints about noise, odours and pollution in the last year? If not, describe:
Does the hotel effectively communicate environmental efforts to guests, vendors, shareholders and the
public?
Does the hotel have recycling receptacles in all guest rooms?
INCIDENT RESPONSE, MANAGEMENT, RECORDING & INVESTIGATIONS
Is standard first aid provided at the hotel?
If yes, by whom?
Who in-house is trained in standard first aid and CPR?
What type of training is done & with what frequency?
For injuries requiring outside medical attention, where are the employees sent?
What is the ambulance response time to the hotel (in peak traffic conditions)?
Does a random review of 5-10 accident reports reveal:
a. All sections of the report are completed?
b. Primary and underlying causes/contributing factors are identified?
c. Corrective actions have been taken to minimize repeat incidents?
d. Witness(es) are identified, interviewed and all pertinent comments documented?
Is an incident/accident log maintained?
Are loss trends, identifying frequency and severity, forwarded to management staff on a monthly basis?
Are photographs of the accident/incident scene taken?
Are claims reported in a timely manner (within 24 hours)?
Is evidence documented and preserved in workers’ claims?
Has someone been designated to manage workers’ claims in-house?
If so, name and title
Has someone been designated to manage general liability claims in-house?
If so, name and title
Is there immediate contact by the person managing the claims to the injured employee?
Is there immediate contact by the person managing general liability claims to the guest?
Are letters sent to a guest reporting a loss or injury/illness?
If yes, examine randomly 5-10 letters.
Is there a written Return to Work policy and procedure?
Have numerous transitional tasks (modified duty) been identified to aid in reducing time loss?
If a treating physician of an injured employee authorizes time-loss, is the physician called to discuss
transitional duty options?
Are claim files maintained?
Are documents date-stamped?
Is a diary system in place to monitor activities of a claim?
Is there evidence in the files that the hotel is actively involved in the claim?
Is accurate wage information provided to the insurer or claims adjuster?
Where is that information obtained? (note: this should be from HR or Payroll records)
Is regular contact maintained between the hotel and the insurer or claims adjuster?
How often?
Is the relationship with the insurer one that allows for a rapid and frank exchange of facts of pertinence?
Are claims reserve costs reviewed with the claims adjuster or insurer on a regular basis to ensure
appropriateness?
INSURANCES
Obtain Insurance particulars (Insurers, Limits, Deducables) for:
Public Liability
Property (Fire)
Professional Indemnity
Directors & Officers Liabilities
Fidelity
Inn-Keepers (Room Losses/Baggage) Limits
Dry Cleaning Limits
RISK MANAGEMENT IN PURCHASING & RECEIVING
Are Risk assessments undertaken for all Purchasing operations?
Are all furniture and fittings that are purchased fire-retarded before release?
Are hotel suppliers required to be quality accredited (eg for food supplies - HACCP accreditation)?
Are hotel suppliers audited by hotel purchasing staff?
Are hotel supplies quarantined for quality checks prior to their release?
Do F&B Management routinely audit received supplies?
Does the hotel operate an "approved supplier" protocol?
SECURITY OPERATIONS & SYSTEMS
Size of Security Department (No. of Employees)
Are outside Contractors also utilised?
Is there a written security manual?
Are manuals revised at least annually?
If so, who is responsible?
Does the hotel/resort have a policy regarding the use of physical force and weapons?
Is there a gun safe on site?
Is there a procedure for contacting Corporate Risk Management and Corporate Legal when a significant
incident occurs? (Verify where the reports are sent).
Are security incident reports and other security documents (e.g. activity reports or logs) maintained in
accordance with the Corporate retention schedule?
Is the hotel aware of a retention schedule?
Is there a guideline of who receives copies of security incident reports?
Describe procedure.
Is there a formal training program for security officers?
Describe such training in detail
Is periodic retraining conducted?
Describe training
Does the hotel/resort utilize a contract security service?
If so, provide the name of the contract service.
Is a contract signed by both parties with hold harmless/indemnity language?
Are all employees required to carry hotel/resort identification?
Is there a written policy regarding key control.
Is disciplinary action included in the policy?
Who is responsible for key control?
How often is a key inventory conducted?
Are guest rooms equipped with in-room safes?
Is verification of guest identification required prior to emergency opening of a guest room safe?
Who is authorized to open a safe on an emergency basis?
Is there a written procedure?
Where is the control key maintained?
Is verification of guest identification required prior to issuing or re-issuing a room key for an occupied room?
Are Front Office staff and cashiers trained on procedures to follow in the event of a robbery?
If so, describe the training and frequency.
Do Manager’s on Duty (MOD)’s receive periodic training on security and emergency response procedures?
Are spas fitted with maximum temperature control? What is the maximum temperature set?
Operating hours of spas?
Any age or time restrictions of use?
Is there a visual contrast between the spa floor and steps?
Is the flow of the spa textured in order to prevent slips?
What backflow prevention devices are installed in spas & how are they maintained?
How frequently are spa filters on pumps maintained?
What disinfection chemicals are used for the spas?
What safety rules are in place for spas? Are their restrictions by age? For persons with heart conditions?
Persons affected by alcohol? Etc.
Are rules posted for use of saunas/steam rooms?
Is a maximum time limit for use established and posted?
Is there a waterfront recreational area? If yes:
a. Have rules been posted?
b. Is there an emergency phone or directions to an emergency phone?
c. Is life saving equipment available?
Is there a warning system to notify guests using outdoor recreational areas of impending dangers (storms,
etc.)?
Are power boats (including jet-skis), non-powered watercraft (eg sea kayaks, sailing boats, wind-surfers - or
other water related equipment loaned, rented or leased to guests? If yes:
a. Are guidelines established for use?
b. Are minimum age requirements, based on equipment type established?
c. Is evidence of appropriate certifications or licensing, as required by local code or regulation required for
use?
d. Are there clearly documented “rules and conditions of use” in place and have these been reviewed by
local legal counsel?
e. Is there appropriate sign off and waiver of participants undertaken?
f. How often are the boats/equipment inspected/serviced and is this documented?
SPORTING FACILITIES & SERVICES
Tennis & Squash Courts
Is there clear & appropriate signage posted regarding rules of use and the safe use of tennis and squash
courts?
Access to emergency telephones?
Facilities available for the secure storage of items of value?
Restriction of use of courts (weather or time controlled)?
Sign in/sign out procedure?
Supervision?
Golf Courses
Is the golf course equipped with lightning protection systems?
Are golf carts inspected and serviced?
a. How often?
b. Are records maintained?
c. Are guidelines established for rental/use of the golf carts?
d. Are minimum age requirements established?
e. Are instructions clearly posted in/on the golf cart?
Are golf cart paths inspected?
a. By whom?
b. Frequency of inspections?
c. Are records maintained of these inspections?
Is there a warning system to notify guests using outdoor recreational areas of impending dangers (storms,
etc.)?
GARDENS, TERRACES & GROUNDS
Are tree branches checked and routinely trimmed?
Are all Pesticides, fertilizers and herbicides used and stored in a responsible manner? No spraying
undertaken within proximity of guests?
Are Paths and walkways routinely cleaned and kept clear of tripping hazards
Is all pooled water cleared after rains on all walkways and outdoor paths
Are all pathways appropriately lighted & checked for lux levels?
Are pathways of slip-proof construction?
Is all outdoor furniture routinely inspected and maintained? Is there a register for such furniture and related
inspection schedules?
Are all garden chemicals stored securely?
Are there MSDS for all garden chemicals?
Is all potting mix and mulch stored adequately and covered?
Are all outside areas & paths routinely checked for slip, trip & fall hazards?
GUEST ROOMS & FLOOR SAFETY
Bathrooms
Are floor and bath surfaces of bathrooms fitted with “slip strips” or an alternate slip-proof surface?
Are hand rails fitted on baths in the bathrooms?
Is hot water at outlets set for a maximum of 55 degrees and are guests able to modify output temperatures?
Are low allergen shampoos and soaps provided by the hotel for bathrooms?
Does the hotel supply razors in bathroom supplies and if so, do the suppliers of the same provide a
guarantee of quality in formal supply agreements?
Do such agreements include opportunities for direct recourse in the event of defective or spoiled products
(particularly for consumable lines such as toothpaste, mouthwash, etc)?
Hairdryers
Are hairdryer units supplied in bathrooms?
If so, are the units hardwired or free-moving?
If hardwired, are the hairdryers located in such a position as to not allow for direct drop into vanity basins or
baths?
Are hairdryers subject to annual electrical inspections?
Are hairdryers “tagged” following electrical inspections?
Cooking facilities
Are any rooms equipped with cooking equipment or facilities (i.e. toasters, microwave oven, bench top gas
or electric rings, conventional ovens)?
If gas fired appliances are supplied – are rooms equipped with gas leakage detection devices?
Are cooking equipment and devices routinely subject to periodic inspections?
Is all electrical cooking equipment “tagged” following electrical inspections?
Internet & modems
Are surge protectors provided for computer outlets?
Steam Irons
Are irons routinely inspected for electrical safety & appropriately tagged?
Are irons fitted with thermostatically regulated cut-out switches?
Power points and outlets
Are child proof plugs available on request?
Are double adaptors, power adaptors and/or extension cords available for guest use?
Is issuance recorded and are the same adequately inspected and maintained?
Cots, high-chairs and strollers
Does the hotel provide any of the above for guests with children?
Are they adequately maintained and inspected?
Do all children’s furniture and accessories comply with recognised safety standards?
Umbrellas
Does the hotel provide guests with umbrellas?
How is issuance and return of umbrellas recorded?
Balconies
Are balustrades correct height with no climb points and structurally sound?
Is balcony furniture in good condition and kept away from balustrade?
Are warning signs posted regarding the hazards of leaving young children unattended on balconies?
Are other warnings posted ie maximum capacity?
Are verandah railings routinely checked & maintained?
Are room windows 'openable' by guests?
Is drying of clothing and towels on verandah discouraged?
Check List
YES NO COMMENTS & NOTES
By whom?
Describe!
Describe!
เขขาพพขนทททออบอากาศ
Hotel Live Date 01/02/2016
ENGINEERING - Prioritization Status Duratio Start
n
Preventive, Repairs & Maintenance (Days)
Customer / User (Staffs) / User (Head Quarter)
No. Preventive & Maintenance Program
1 Develop preventive maintenance program - Room 2 Set Up Pending 90 1-Sep-15
2 Develop preventive maintenance program - Public a2 Set Up 0
3 Develop preventive maintenance program - Equipm 2 Set Up 0
4 Determine water treatment for central plant 2 Set Up 0
5 Develop Chiller, KWH, Gass, Watertemp/pressure
Logs 2 Set Up
and Meter logs 0
6 Evaluate preventive and maintenance program 1 Prepare 0
7 Schedule preventive and maintenance program 2 Set Up 0
8 Maintenance Inventory
9 Finalize items & Quantities 2 Set Up 0
10 Review samples/ pricing 2 Set Up 0
11 Order final selection 2 Set Up 0
12 Receive final selection 3 Action 0
13 Stock 3 Action 0
14 Maintenance Tools
15 Finalize items & Quantities 2 Set Up 0
16 Review samples/ pricing 2 Set Up 0
17 Order final selection 2 Set Up 0
18 Receive final selection 3 Action 0
19 Stock 2 Set Up 0
20 Two-way Radios 2 Set Up 0
21 Maintenance Equipment
22 Finalize items & Quantities 2 Set Up 0
23 Review samples/ pricing 2 Set Up 0
24 Order final selection 2 Set Up 0
25 Receive final selection 3 Action 0
26 Stock 2 Set Up 0
27 Printing Materials
28 Maintenance Performed Courtesy Note 1 Prepare 0
29 Safety
30 Ensure Fire Extinguishers are in place 3 Action 0
31 Develop Safety Committee 2 Set Up 0
32 Model Rooms
33 Coordinate move of Model rooms 2 Set Up 0
34 Repair Response System
35 Develop work order system 2 Set Up 0
36 Research and procure work order software 1 Prepare 0
37 Training
38 Guest Key Card System Training 2 Set Up 0
39 Television/ Moview Training 2 Set Up 0
40 Mechanical/HVAC training 2 Set Up 0
41 Guestroom PM program training 2 Set Up 0
42 Public space PM program training 2 Set Up 0
43 Building management system training 2 Set Up 0
44 Signage
45 Select and Procure Interior signage 2 Set Up 0
46 Select and Procure Exterior signage 2 Set Up 0
47 Pre-Opening Office
48 Locate and Prepare Pre-opening offices 2 Set Up 0
49 Relocate Pre-Opening offices to hotel 3 Action 0
50 Develop MOD Manual
51 Develop Risk Management Manual/evacuation Plan 1 Prepare 0
52 Obtain Fire department approval of Fire/Evacuation 2 Set Up 0
53 Contract maintenance and service agreements 2 Set Up 0
54 Construction/Building Preparation
55 Kitchen / Restaurant / Café 0
56 Substantial Completion 2 Set Up 0
57 Submit punch list to Chef, F&B for comments 2 Set Up 0
58 Punch list itmes corrected 3 Action 0
59 Area cleaned 3 Action 0
60 Retail / Lobby / Guestroom / Common Area / Kid zone 0
61 Substantial Completion 2 Set Up 0
62 Submit punch list to Master, Assistant Master for c 2 Set Up 0
63 Punch list itmes corrected 3 Action 0
64 Area cleaned 3 Action 0
65 Building Exterior / Landscaping /BackOfHouse /Office 0
66 Substantial Completion 2 Set Up 0
67 Submit punch list to Master, Assistant Master for c 2 Set Up 0
68 Punch list itmes corrected 3 Action 0
69 Area cleaned 3 Action 0
70 Uniform Room / Administrative/ Front Office 0
71 Substantial Completion 2 Set Up 0
72 Submit punch list to Master, Assistant Master for c 2 Set Up 0
73 Punch list itmes corrected 3 Action 0
74 Area cleaned 3 Action 0
75 Secure Background Music
76 Design Received 2 Set Up 0
77 Design Approved 3 Action 0
78 Service installed and tested 3 Action 0
Due / Finish Count Task Assigned/ Remarks
Down Owned By
30-Nov-15 -1282
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
Hotel Live Date 01/02/2016
SALES & MARKETING PLAN Prioritization Status Duratio Start
n
( Days )
Customer / User (Staffs) / User (Head Quarter)
No. Hotel Positioning
1 Develop Hotel Unique Selling Propositions per Mark 1 Prepare Pending 90 1-Sep-15
2 Complete Competitor Analysis 2 Set Up 0
3 Complete SWOT Analysis 2 Set Up 0
4 Story for Design, Care, Authenticity, Pricing Analysis1 Prepare 0
5 Hotel Sales Collateral
6 Develop facilities guide/presentation folder/fact she 1 Prepare 0
7 Develop Pre-Opening Brochure 1 Prepare 0
8 Develop Permanent Brochure 2 Set Up 0
9 Develop ancillary sales collateral/stationery 1 Prepare 0
10 Develop Press Kit 1 Prepare 0
11 Develop Property Maps 2 Set Up 0
12 Photography/Video 3 Action 0
13 Coordinate photo shoot for permanent brochure 3 Action 0
14 Photography available 3 Action 0
15 Image/ Brand
16 Conduct image/brand exercise 1 Prepare 0
17 Develop positioning statement 1 Prepare 0
18 Develop Tag Lines 1 Prepare 0
19 Develop Logo(s) 1 Prepare 0
20 Develop Graphics Standards Manual 1 Prepare 0
21 Marketing Plan
22 Purpose 1 Prepare 0
23 Appoint Marketing Plan Co-Ordinator 3 Action 0
24 Appoint Sales Executive 3 Action 0
25 Acquisition Plan to be formulated 2 Set Up 0
26 Acquisition Plan to be approved 3 Action 0
27 Develop Gift Certificates 3 Action 0
28 Indentify direct mail/email databases for leisure mar2 Set Up 0
29 Initiate direct mail/email campaign 2 Set Up 0
30 Develop Media Visit Schedule 2 Set Up 0
31 Establish listing/contact with local organizations 2 Set Up 0
32 Advertising
33 Develop advertising/media plan by market segment1 Prepare 0
34 Create advertising 1 Prepare 0
35 Media Buys 2 Set Up 0
36 Establish Tracking Mechanism for advertising campa2 Set Up 0
37 Launch Advertising Campaign 3 Action 0
38 Establish Listings in Directories (Hotel guide, Official1 Prepare 0
39 Develop in-room TV Promotion video 2 Set Up 0
40 Establish local yellow pages line listing 1 Prepare 0
41 Rates Structure
42 Complete and Submit Rate Builder 1 Prepare 0
43 Rate Grid to be approved 1 Prepare 0
44 Establish Room Types/Categories 1 Prepare 0
45 Establish Room Number 1 Prepare 0
46 Package program and detailed 1 Prepare 0
47 Contract Agreement/ Sales Proposal
48 Draft of Agent Contract agreement per market 1 Prepare 0
49 Contract Validity 1 Prepare 0
50 Seasonal Rate Table 1 Prepare 0
51 Package policy (Breakfast,Lunch,Dinner,Transfer) 1 Prepare 0
52 Stimulated Promotion (early bird, bonus night,disco 1 Prepare 0
53 Cancellation & No Show policy 1 Prepare 0
54 Children policy 1 Prepare 0
55 Exta Bed policy 1 Prepare 0
56 Baby Cot Policy 1 Prepare 0
57 Terms and Agreement 1 Prepare 0
58 Termination of Contract 1 Prepare 0
59 Soft Opening Programme
60 Determine Target Groups 2 Set Up 0
61 Determine pre-opening programmes 2 Set Up 0
62 Establish Pre-opening Date 2 Set Up 0
63 Select client/VIP & gifts 2 Set Up 0
64 Determine list of attendees 2 Set Up 0
65 Develop invitation and its lists 2 Set Up 0
66 Mail invitations 3 Action 0
67 Develop Program 3 Action 0
68 Budeget 3 Action 0
69 Staffing needs 3 Action 0
70 Parking & Transportation 3 Action 0
71 Floral and Decorations 3 Action 0
72 Entertainment 3 Action 0
73 Photography 3 Action 0
74 Develop F&B Menus 3 Action 0
75 Procure Food & Beverage 3 Action 0
76 Develop Amenities 3 Action 0
77 Hotel Opening Programme
78 Determine official opening date 2 Set Up 0
79 Determine Target Groups 2 Set Up 0
80 Determine Programme 2 Set Up 0
81 Develop invitation and its lists 2 Set Up 0
82 Mail invitations 2 Set Up 0
83 Develop Program 2 Set Up 0
84 Budget 3 Action 0
85 Staffing needs 3 Action 0
86 Parking & Transportation 3 Action 0
87 Floral and Decorations 3 Action 0
88 Entertainment 3 Action 0
89 Develop Acitivities for Guests 3 Action 0
90 Photography 3 Action 0
91 Develop Menus 3 Action 0
92 Procure Food & Beverage 3 Action 0
93 Develop Amenities 3 Action 0
94 Trial Visits
95 Management/Staff Overnights for Testing 4 Test 0
96 Friends & Family Overnights and Feedback 4 Test 0
97 VIP Overnights and Feedback 4 Test 0
98 Hotel Branding
99 Minimum Branding Requirements ascertained 1 Prepare 0
100 Minimum Branding Requirements ordered 1 Prepare 0
101 Hotel Brochure finalised 2 Set Up 0
102 Hotel Signage finalised 2 Set Up 0
103 Corporate Flags ordered 2 Set Up 0
104 Brochure Rack and Brochures ordered 2 Set Up 0
105 Hotel Stationery finalised and ordered 2 Set Up 0
106 Key Cards designed 1 Prepare 0
107 Internal Signage agreed 1 Prepare 0
108 Marketing Material ordered 2 Set Up 0
109 Branding Checklist Completed 3 Action 0
110 Revenue Management
111 Implement group pace report 1 Prepare 0
112 Implement group evaluator model 1 Prepare 0
113 Establish stretch goals 1 Prepare 0
114 Establish group room contribution goals for Sales 1 Prepare 0
115 Develop daily transient demand by season 2 Set Up 0
116 Develop merchandising meeting agenda 1 Prepare 0
117 Develop daily/weekly/monthly reporting 2 Set Up 0
118 Develop forecasting system (daily, weekly, monthly,2 Set Up 0
119 Develop Selling Strategy Calendar 1 Prepare 0
120 Set Initial Selling Strategies 1 Prepare 0
121 Reservations
122 Complete Basic Confirmation Lettter 1 Prepare 0
123 Create Insert with Cancellation/change policy 1 Prepare 0
124 Conduct Area/Suite Naming Exercise 2 Set Up 0
125 Reservations Sales Agents Training 2 Set Up 0
Load revenue management information
1 Prepare
126 (set selling strategies and restrictions) 0
127 Develop PMS Configuration documentation 2 Set Up 0
128 Hotel Web Page
129 Research web hosting 1 Prepare 0
130 Select web host 1 Prepare 0
131 Design Web pages 1 Prepare 0
132 Hotel.com Web Entry 1 Prepare 0
133 Hotel Fact Sheet submitted 1 Prepare 0
134 Pictures submitted 1 Prepare 0
135 Develop On-line Reservation web page 2 Set Up 0
136 Test & Feedback 3 Action 0
137 Load for public use 2 Set Up 0
138 Hotel Social Medias/ E-Commerce
139 Facebook, Line, Instragram, Twitter Entry ect. 1 Prepare 0
140 Hotel Fact Sheet submitted 1 Prepare 0
141 Pictures submitted 1 Prepare 0
142 Spreading The Word 0
143 Publicity 2 Set Up 0
144 Promotions 2 Set Up 0
145 Sales Goals and Action Plans 1 Prepare 0
146 Hotel Budgets
147 Draft 12 mth Operating Budget 2 Set Up 0
148 Draft Pre-Opening & Grand Opening Budet 2 Set Up 0
149 Draft Capex Budget 2 Set Up 0
150 Design Profit & Loss (P&L) Review 2 Set Up 0
0
Due / Finish Count Task Assigned/ Remarks
Down Owned By
30-Nov-15 -1282
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
Hotel Live Date 01/02/2016
QUALITY PLAN - Front Office Prioritization Status Duration
( Days )
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
Hotel Live Date ###
QUALITY PLAN - F&B Prioritization Status Duration
( Days )
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
Hotel Live Date 01/02/2016
QUALITY PLAN - Housekeeping Prioritization Status Duration
( Days )
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
Hotel Live Date 01/02/2016
STAFFING Prioritization Status Duration Start
( Days )
30-Nov-15 -1282
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
depend on size of property
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
-43620
Hotel Opening Check List
1. Visit of General Manager to Head Office
1.1. Introduction
1.2 Coordination
1.3 Orientation
1.4 Meeting with Department Head
2. Human Resources - Pre-Opening Check List
2.1 Human resource Survey
2.2 Staffing plan
2.3 Staffing plan revisions
2.4 Hotel Human Resource Manager