0% found this document useful (0 votes)
42 views

Main Engine Controls Change Over

This document provides instructions for changing control of a main engine (ME) from one control location to another. It outlines the steps to change control from the engine control room (ECR) to the bridge and vice versa. The steps include ensuring the ME is in a stopped condition, matching the telegraph positions between locations, and informing the other location before switching control.

Uploaded by

Srini Vasan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views

Main Engine Controls Change Over

This document provides instructions for changing control of a main engine (ME) from one control location to another. It outlines the steps to change control from the engine control room (ECR) to the bridge and vice versa. The steps include ensuring the ME is in a stopped condition, matching the telegraph positions between locations, and informing the other location before switching control.

Uploaded by

Srini Vasan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

CONTROL NO : ER 09/A

REV : 0 DTD : JAN,08

ME CHANGE OVER OF CONTROLS FROM ECR TO


BRIDGE
 ME IN STOP CONDITION

 ME STARTING AIR ISOLATING V/V IN AUTO POSITION,


 AUX BLOWERS IN AUTO POSITION,
 NO ALARMS FOR ME SYSTEM,
 AFTER INFORMING BRIDGE CHANGE OVER CONTROL SWITCH FROM ECR TO
BRIDGE,

 ME RUNNING FROM ECR CONTROL

 1 TO 3 CONDITIONS ABOVE TO BE SATISFIED,


 ASK BRIDGE TO MATCH TELEGRAPH HANDLE WITH ECR TELEGRAPH POSITION,
THIS WILL BE INDICATED ON THE ECR/BRIDGE CONTROL CONSOLE,

 CHANGE OVER CONTROL SWITCH FROM ECR TO BRIDGE.


ME CHANGE OVER OF CONTROLS FROM BRIDGE TO
ECR
 ME IN STOP CONDITION

 INFORM BRIDGE AND CHANGE OVER CONTROL SWITCH FROM BRIDGE TO ECR.

 ME RUNNING CONDITION

 INFORM BRIDGE AND MATCH THE ECR TELEGRAPH HANDLE WITH BRIDGE
TELEGRAPH POSITION, THIS WILL BE INDICATED ON THE ECR/BRIDGE CONTROL
CONSOLE,

 CHANGE OVER CONTROL SWITCH FROM ECR TO BRIDGE.

CHIEF ENGINEER
CONTROL NO : ER 09/A
REV : 0 DTD : JAN,08

M.T._____________

You might also like