(Board Resolution No. 201, Series of 2017) : PCAB Categorization - Classification Table

The document provides a classification table that categorizes contractors based on their financial capacity, experience of sustaining technical employees, and overall credit points, assigning them a classification from AAAA to D. It also outlines the minimum requirements in each category for qualifications, allowable ranges of contract costs, and single largest project completed. The third section adjusts the allowable ranges of contract costs and single largest project track record requirements based on the contractor's license category.

Uploaded by

Angelo Pura
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views

(Board Resolution No. 201, Series of 2017) : PCAB Categorization - Classification Table

The document provides a classification table that categorizes contractors based on their financial capacity, experience of sustaining technical employees, and overall credit points, assigning them a classification from AAAA to D. It also outlines the minimum requirements in each category for qualifications, allowable ranges of contract costs, and single largest project completed. The third section adjusts the allowable ranges of contract costs and single largest project track record requirements based on the contractor's license category.

Uploaded by

Angelo Pura
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

PCAB Categorization – Classification Table

(Board Resolution No. 201, series of 2017)


Minimum Qualification Requirements
(2)
(1) **Sustaining Technical
*Financial Capacity Employee (STE) (3)
Classification Category Construction Experience ***Overall
Aggre- Credit
Minimum Indivi- Minimum
Credit gate Points
Networth / dual Credit
Points (man-
Equity (P) (years) Points
years)
A. GENERAL ENGINEERING AAAA 1,000,000,000.00 10,000.00 10 60 300 10,300.00
GE-1 (Road, Highways, Pavement, AAA 180,000,000.00 1,800.00 10 60 300 2,850.00
Railways, Airport Horizontal
Structure, and Bridges) AA 90,000,000.00 900.00 10 50 250 1,365.15
GE-2 (Irrigation or Flood Control)
A 30,000,000.00 300.00 7 21 105 475.00
GE-3 (Dam, Reservoir or Tunneling)
GE-4 (Water Supply) B 10,000,000.00 100.00 5 10 50 177.50
GE-5 (Port, Harbor or Offshore
Engineering) C 6,000,000.00 60.00 3 3 15 105.50

D 2,000,000.00 20.00 3 3 15 35.00

B. GENERAL BUILDING AAAA 1,000,000,000.00 10,000.00 10 60 300 10,300.00


GB-1 (Building or Industrial Plant) AAA 180,000,000.00 1,800.00 10 60 300 2,810.00
GB-2 (Sewerage or Sewage System)
AA 90,000,000.00 900.00 10 50 250 1,345.00
GB-3 (Water Treatment Plant & System)
A 30,000,000.00 300.00 7 21 105 471.00
GB-4 (Park, Playground or Recreational
Work)
B 10,000,000.00 100.00 5 10 50 175.50

C 6,000,000.00 60.00 3 3 15 96.50

D 2,000,000.00 20.00 3 3 15 35.00

C. SPECIALTY
AAAA 1,000,000,000.00 10,000.00 10 60 300 10,300.00
SP-FW (Foundation Work)
SP-SS (Structural Steel Work)
SP-CC (Concrete Pre-casting, Pre-
Stressing or Post-tensioning) AAA 180,000,000.00 1,800.00 10 60 300 2,410.00

SP-PS (Plumbing & Sanitary Work)


SP-EE (Electrical Work)
SP-ME (Mechanical Work)
AA 90,000,000.00 900.00 10 50 250 1,145.00

SP-AC (Air-conditioning or Refrigeration)


SP-ES (Elevator or Escalator)
SP-FP (Fire Protection Work) A 30,000,000.00 300.00 7 21 105 421.00
SP-WP (Waterproofing Work)
SP-PN (Painting Work)
SP-WD (Well-Drilling Work) B 10,000,000.00 100.00 5 10 50 165.50
SP-CF (Communication Facilities)
SP-MS (Metal Roofing & Siding
Installation)
C 6,000,000.00 60.00 3 3 15 90.50
SP-SD (Structural Demolition)
SP-LS (Landscaping)
SP-EM (Electro Mechanical Work) D 2,000,000.00 20.00 3 3 15 35.00
SP-NF (Navigational Facilities)
D. SP-TRADE Trade/E 100,000.00 1.00 none none none 1.00
* Minimum Qualification Requirements for Principal Classification
** For Other Classification/s, Minimum of 3 Years Actual Construction Experience
*** Overall credit points inclusive of Equipment Capacity (1 point/P100Th); Experience of Firm (10 points/year of active existence); and
1 point/P100Th of 3 year Average Annual Volume of Work Accomplished; and COMTCP points if STEs are COMTCP certified
Third Stage of Adjustment on Allowable Ranges of Contract Costs (ARCC) and
Single Largest Project (SLP) Completed / Track Record Requirements
(Board Resolution No. 201, series of 2017)
License Allowable Ranges of
Size Range Single Largest Project (P)
Category Contract Costs (P)
Large B AAAA and AAA Above 225 Million < or above 450 Million
Large A AA Above 150 Million up to 225 Million Up to 450 Million
Medium B A Above 75 Million up to 150 Million Up to 300 Million
Medium A B Above 15 Million up to 75 Million Up to 150 Million
Small B C&D < 15 Million Up to 30 Million
Small A Trade/E Up to 1 Million Up to 1 Million
Note: Par. 3 of Sec. 23.11.2 of the IRR of RA 9184 allows Small A and Small B contractors without similar experience to bid only for contracts not
more than fifty percent (50%) of the allowable range of contract cost of their respective size range(s).