Given Data:
a b c
1.4 2.85 0
4.25
39.5351
23.7851
SFD
e
1.21975
-31.78985
38.53944
33.4807941176 0
BMD
Calculation of depth:
T
G
R
D
B
G
B = 0.29682
where:
11.25 kn/m2 G = Tread
R = Rise
Dead load per m of
2
d
0 Horizontal span = (WB +RT*0.5)*(25/G)
Calculation of reaction:
RA 31.7899 KN
RB 39.5351 KN
Chart no 2 BS 8110-2-1997
1340.41
0.5
1.28002 Table 3.8 BS 8110-1-1997
1.28002
kn
kn up
kn up
kn down
kn down
kn
kn
knm
knm
knm
knm
knm
knm
N/mm2
N/mm2
mm
mm
Project
Given Data:
a b c
1.2 3.1 0
4.3
24.3526
15.3526
SFD
e
1.31782
-20.76238
24.89958
19.5148604651 0
BMD
Calculation of depth:
T
G
R
D
B
G
B = 0.29682
where:
7.5 kn/m2 G = Tread
R = Rise
Dead load per m of
2
d
0 Horizontal span = (WB +RT*0.5)*(25/G)
Calculation of reaction:
RA 20.7624 KN
RB 24.3526 KN
Chart no 2 BS 8110-2-1997
1340.41
0.5
1.28002 Table 3.8 BS 8110-1-1997
1.28002
kn
kn up
kn up
kn down
kn down
kn
kn
knm
knm
knm
knm
knm
knm
N/mm2
N/mm2
mm
mm
Project
Given Data:
a b c
1.1 3 1.1
5.2
20.2
14.2875
SFD
e
1.5
-14.2875
29.68375
18.968125 18.9681
BMD
Calculation of depth:
T
G
R
D
B
G
B = 0.29682
where:
5.375 kn/m2 G = Tread
R = Rise
Dead load per m of
2
d
1.1 Horizontal span = (WB +RT*0.5)*(25/G)
Calculation of reaction:
RA 20.2 KN
RB 20.2 KN
Chart no 2 BS 8110-2-1997
1340.41
0.5
1.29099 Table 3.8 BS 8110-1-1997
1.29099
kn
kn up
kn up
kn down
kn down
kn
kn
knm
knm
knm
knm
knm
knm
N/mm2
N/mm2
mm
mm
Project
Given Data:
2 kn/m2 2 kn/m2
a b c
1 3 1
3
SFD
e
1.5
-3
6.25
4 4
BMD
Calculation of depth:
Shear force = 5 kn
T
G
R
D
B
G
B = 0.29682
where:
2 kn/m2 G = Tread
R = Rise
Dead load per m of
2
d
1 Horizontal span = (WB +RT*0.5)*(25/G)
Calculation of reaction:
RA 5 KN
RB 5 KN
Chart no 2 BS 8110-2-1997
1340.41
0.5
1.29099 Table 3.8 BS 8110-1-1997
1.29099
kn
kn up
kn up
kn down
kn down
kn
kn
knm
knm
knm
knm
knm
knm
N/mm2
N/mm2
mm
mm