Risk Assessment Matrix PDF
Risk Assessment Matrix PDF
Purpose
To establish a consistent process for assessing Risks to people, assets, environment and reputation
(including social performance).
Requirements
Managers are Accountable for implementing requirements 1 to 2:
1. Use the Risk Assessment Matrix (RAM), see Figure 1 below, for performing HSE Risk Assessments.
a. In reporting to Lenders, use the RAM specified in the Methodology for Classifying and Remediating
Incidents And Breaches that additionally includes a Social consequences column.
2. Assure the competence of people applying the RAM to HSE management processes.
Assets
1
PTD is a Permanent Total Disability.
Definitions
Harm to People (P) Asset Damage (A)
Slight injury or health effect – not affecting work Slight damage – no disruption to operation, costs less
performance or Daily Life Activities. than $10,000.
Minor injury or health effect – affecting work performance Minor damage – brief disruption to operation, costs less
(restricted work case, or up to 5 days lost time), or reversible than $100,000.
health effects (e.g. skin irritation, food poisoning). Local damage – partial shutdown, can be restarted but
Major injury or health effect – lost time more than 5 days, costs up to $1,000,000.
or irreversible health damage (e.g. hearing). Major damage – partial shutdown up to 2 weeks, costs
Permanent Total Disability or one to three fatalities – up to $10,000,000.
resulting from injury/ occupational illness. Extensive damage – Substantial or total loss of
More than three fatalities – resulting from injury or operation, costs greater than $10,000,000.
occupational illness.
Environmental (E) Effect Impact on Reputation (R)
Slight effect – slight E damage, contained within the Slight impact – Limited public awareness on local level
premises. but no discernible concern, no media coverage.
Minor effect – minor E damage, no lasting effect, e.g. small Minor impact – Local public concern and media
spill offsite, onsite groundwater contamination, single coverage.
exceedance of limit. Moderate impact – High local public concern, extending
Moderate effect – limited E damage that will persist or to the level of the Sakhalin Region, media coverage on
require cleaning up, e.g. spill that requires removal and regional level.
disposal of a large quantity of soil/sand, or observed fish kill Major impact – Likely to escalate and affect reputation
or damaged vegetation, frequent exceedance of limit with of Company, Shareholders and/or Lenders; National
potential long term effect. attention, extensive media coverage on national level,
Major effect – severe E damage that will require extensive some international.
measures to restore beneficial uses, e.g. spill on beach, Massive impact – Severe impact on reputation of
extensive offsite groundwater contamination. Company, Shareholders and/or Lenders, international
Massive effect – persistent severe E damage that will lead public /media attention, NGO action, high level of
to loss of commercial, recreational use or loss of natural concern amongst governments.
resources over a wide area.
The four colors in the application of the RAM mean the following:
Managing Risk Incidents Audit Maintenance prioritization
Severity Zero: Review requirement
to progress work
Manage for continuous
improvement, although Businesses (A1) 7 Routine Priority, Latest
Low Allowed Finish Date LAFD <=12m
may set lower priority for further Risk
reduction. Low Risk (A2/B1) 6 Routine Priority,
Incident LAFD<=6 months
(A3/B2/C1) 5 Routine Priority,
Manage for continuous improvement LAFD<=8 weeks
through the effective implementation Medium
of the HSSE Management System. (A4/B3/C2/D1) 4 Routine Priority,
LAFD<=4 weeks
Identify and implement Controls and (A5/B4/C3/D2/E1) 3 Routine
Recovery Measures to reduce Risk Medium Risk Priority, LAFD<=2 weeks
High
to As Low As Reasonably Incident (B5/C4/D3/E2) 2 Schedule Breaker
Practicable (ALARP). Priority, LAFD<=1 week
Identify and implement Controls and
Recovery Measures to reduce the
Risk to ALARP and provide a High Risk 1 Emergency Priority.
Serious LAFD: ASAP + Overtime.
Documented Demonstration Of Incident
ALARP by a Bow-Tie or equivalent
methodology.
Actual
Significant
Severity
Incident
4 or 5