Pilot Proposal Guidelines
Pilot Proposal Guidelines
The attached template sets out the requirements for staff who wish to make
suggestions and proposals for IT projects.
The pilot study will confirm viability and scalability and enable proposed processes
and procedures to be tested. It will confirm the appropriateness of
software/hardware proposed and also confirms that any working practices can be
facilitated within College.
There is a small amount of budget available for staff who wish to propose projects
for a feasibility study to help confirm that the underlying idea is sound.
1. The initial idea should be discussed with your line manager and have support
in principle from an SMT member. This is to ensure that proposals are in line
with the College Strategy and operational plans.
2. The attached Pilot Proposal form needs to be completed and sent to Anne
Peden.
3. The Pilot Proposal form will be reviewed and approved/rejected by the IT &
Infrastructure Advisory Group.
4. At the end of the pilot the proposer will complete a viability report and
recommendation for next steps for the IT & Infrastructure Advisory Group to
consider.
The Pilot Proposal form is a template designed to assist staff in setting out the
reasons why a pilot should be funded. The sections are intended to set out – what
is the pilot, who is involved, what will it achieve and what are the next steps.
The requestor information is basic details of the requestor but should also include
the sponsor of the project. This is the SMT member who has agreed the pilot in
principle.
Pilot Description:
This will include a brief description of the objectives of the pilot and its
scope. That is what is and what is not included.
Benefits Description:
A pilot is used to assess feasibility before significant resources are
committed to a larger project. This section needs to summarise the
anticipated operational/ financial and non-financial benefits of the project
if the pilot is successful.
Cost Analysis:
Give a breakdown of the anticipated costs and resources for the pilot. It
would also be useful to set out the costs if the pilot is successful and is
rolled out across College.
The pilot may have demonstrated that the proposal should not be taken forward to
a full project. Alternatively the pilot may have proved successful and a
recommendation made to make a business case for a full project and cross College
roll out.
The IT & Infrastructure Advisory Group must receive a viability report and
recommendation for consideration. This report needs to include a summary of
lessons learned, issues and potential risks as well as a route map for
implementation if necessary.