Sump Design Report
Sump Design Report
This report present design calculation carried out for proposed Kegalle Arpico Water sump, Pump room and Cooling tower. All of these designs were done complying with BS 8110-1:1997.
Loads
Base level - SD = 2 kN/m2 Live = 15 kN/m2 Up trust = 15 kN/m2 (Assume water level at Ground Level)
RC Concrete = 24 SD kN/m3
Water = 10 kN/m3
The temperature loading is calculated in accordance with BS8007 : Design of Concrete Structures for Retaining Aqueous Liquids;
Fall in temperature between the hydration peak and the ambient (T1) : 13 C (wall) 17 C ( Base Slab)
Material Properties
Cu = 12.5 kN/m2
The wall is Idealise as a prop cantilever considering the restrain for movement and rotation provided by Cover Slab
Since the walls are designed as a prop cantilever, the moment induce at the edges are neglected. However Detailing of reinforcement is carried out to make sure that the moments induced at the corners are effectively dealt
with.
The design for the temperature loads are based on Crack Width limitation method.
The detail design carried out as per 8007: Design of Concrete Structures for Retaining Aqueous Liquids and BS8110 : Structural use of Concrete
The serviceability Crack Width Limitation is taken as 0.2 mm for severe exposure condition as per 8007: Design of Concrete Structures for Retaining Aqueous Liquids
Date : 22nd September 2017 Document Title : Design Report of Sump Revision : 00
Project : Guard Room Building Page :1
Load Combinations
Date : 22nd September 2017 Document Title : Design Report of Sump Revision : 00
Project : Guard Room Building Page :2
Rc Wall calculation done base on following combinations
E.P . = Earth Pressure W.P. = Water Pressure
Case 1.1 = 1.0 Dead + 1.0 E.P + 1.0 W.P
Case 1.2 = 1.0 Dead + 1.4 E.P + 1.4 W.P
Case 2.1 = 1.0 Dead + 1.0 W.P
Case 2.2 = 1.0 Dead + 1.4 W.P.
Date : 22nd September 2017 Document Title : Design Report of Sump Revision : 00
Project : Guard Room Building Page :3
ANNEXURE 1
Date : 22nd September 2017 Document Title : Design Report of Sump Revision : 00
Project : Guard Room Building Page :4
ANNEXURE 2
Date : 22nd September 2017 Document Title : Design Report of Sump Revision : 00
Project : Guard Room Building Page :5
Date : 22nd September 2017 Document Title : Design Report of Sump Revision : 00
Project : Guard Room Building Page :6