Sump Design Report

This document summarizes the design calculations for the proposed water sump, pump room, and cooling tower for the Kegalle Arpico project. The designs were done in compliance with relevant British standards. Loads, material properties, and geotechnical parameters are defined. Designs of the base slab and retaining walls are presented, including load combinations considered, moment summaries, reinforcement details provided to resist bending and shear. Annexures with further calculation details are referenced.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
194 views

Sump Design Report

This document summarizes the design calculations for the proposed water sump, pump room, and cooling tower for the Kegalle Arpico project. The designs were done in compliance with relevant British standards. Loads, material properties, and geotechnical parameters are defined. Designs of the base slab and retaining walls are presented, including load combinations considered, moment summaries, reinforcement details provided to resist bending and shear. Annexures with further calculation details are referenced.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

1 EXECUTIVE SUMMARY

This report present design calculation carried out for proposed Kegalle Arpico Water sump, Pump room and Cooling tower. All of these designs were done complying with BS 8110-1:1997.

Loads
Base level - SD = 2 kN/m2 Live = 15 kN/m2 Up trust = 15 kN/m2 (Assume water level at Ground Level)

The following unit weights are considered

RC Concrete = 24 SD kN/m3

Water = 10 kN/m3

The temperature loading is calculated in accordance with BS8007 : Design of Concrete Structures for Retaining Aqueous Liquids;

Fall in temperature between the hydration peak and the ambient (T1) : 13 C (wall) 17 C ( Base Slab)

Fall in Temperature due to seasonal Variations (T2) : 21 C

Material Properties

Following concrete Grades are used

Wall, Slab - C30

Geo Technical Parameters

Cu = 12.5 kN/m2

 The wall is Idealise as a prop cantilever considering the restrain for movement and rotation provided by Cover Slab
 Since the walls are designed as a prop cantilever, the moment induce at the edges are neglected. However Detailing of reinforcement is carried out to make sure that the moments induced at the corners are effectively dealt
with.
 The design for the temperature loads are based on Crack Width limitation method.
 The detail design carried out as per 8007: Design of Concrete Structures for Retaining Aqueous Liquids and BS8110 : Structural use of Concrete
 The serviceability Crack Width Limitation is taken as 0.2 mm for severe exposure condition as per 8007: Design of Concrete Structures for Retaining Aqueous Liquids

Date : 22nd September 2017 Document Title : Design Report of Sump Revision : 00
Project : Guard Room Building Page :1
Load Combinations

 Comb 1 – 1.0 Dead + 1.0 Live


 Comb 2 – 1.4 Dead + 1.6 Live
 Comb 3.1- 1.0 Dead + 1.0 Up trust
 Comb 3.2 – 1.0 Dead + 1.4 Up trust

Table 1: Base Slab Moment Summary (Refer Annexure 1)

Support moment Span moment


Combination Moment Direction (kNm/m) (kNm/m)

Combination 1 M11 7 5.5


M22 4.7 12.5
Combination 2 M11 10.5 7.5
M22 7.5 17.5
Combination 3.1 M11 5 4
M22 3.5 9.6
Combination 3.2 M11 5.5 4.5
M22 4 10
Since Comb 1 and Comb 2 are critical in SLS and ULS, RF calculate for those combinations

Table 2: Base Slab RF Summary (Refer Annexure 1)

Combination Moment Direction Provided Support RF Provided Span RF

Combination 1 M11 T12@150 T12@150


M22 T12@150 T12@150
Combination 2 M11 T12@150 T12@150
M22 T12@150 T12@150

Date : 22nd September 2017 Document Title : Design Report of Sump Revision : 00
Project : Guard Room Building Page :2
Rc Wall calculation done base on following combinations
E.P . = Earth Pressure W.P. = Water Pressure
 Case 1.1 = 1.0 Dead + 1.0 E.P + 1.0 W.P
 Case 1.2 = 1.0 Dead + 1.4 E.P + 1.4 W.P
 Case 2.1 = 1.0 Dead + 1.0 W.P
 Case 2.2 = 1.0 Dead + 1.4 W.P.

Table 3: Wall Summary (Refer Annexure 2)

Combination Moment Direction Vertical RF


(kNm)
Case 1.1 5.7 T12@150
Case 1.2 8.0 T12@150
Case 2.1 2.2 T12@150
Case 2.2 3.1 T12@150

Transvers direction T12 @ 125 – Refer Annexure 2

Date : 22nd September 2017 Document Title : Design Report of Sump Revision : 00
Project : Guard Room Building Page :3
ANNEXURE 1

Date : 22nd September 2017 Document Title : Design Report of Sump Revision : 00
Project : Guard Room Building Page :4
ANNEXURE 2

Date : 22nd September 2017 Document Title : Design Report of Sump Revision : 00
Project : Guard Room Building Page :5
Date : 22nd September 2017 Document Title : Design Report of Sump Revision : 00
Project : Guard Room Building Page :6