This document contains the instructions and data for an assignment to analyze control charts. It includes: 1) Calculating the standard deviation, central line, upper control limit, and lower control limit of the given data. 2) Drawing a control chart using the above calculations. 3) Adjusting the chart for clarity if needed. 4) Interpreting the graph to determine if the process is in or out of control.

Uploaded by

m.shahid
Copyright
© © All Rights Reserved
Available Formats
Download as ODS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
932 views

STA641 Assignment Solution

This document contains the instructions and data for an assignment to analyze control charts. It includes: 1) Calculating the standard deviation, central line, upper control limit, and lower control limit of the given data. 2) Drawing a control chart using the above calculations. 3) Adjusting the chart for clarity if needed. 4) Interpreting the graph to determine if the process is in or out of control.

Uploaded by

m.shahid
Copyright
© © All Rights Reserved
Available Formats
Download as ODS, PDF, TXT or read online on Scribd
You are on page 1/ 4

Assignment No.

(Course STA641)
(Total Marks 20)
Mc170401069

Question Total Marks: (2 + 2 + 3 + 3 + 6 + 2 + 2 =20) Obtained Marks:


Perform the following measures on the given data.
1.       Standard Deviation
2.       Central Line (CL)
3.       Upper Control Limit (UCL)
4.       Lower Control Limit (LCL)
5.       Using the above calculations, draw the Control Chart of the given data.
6.       If needed, make necessary adjustment in Chart to make it more neat and VISIBLE
7.       Interpret the graph and tell whether the process is in control or out of control 13

Data # Q1 Q2 Q3 Q4 Q5 MEAN UCL CL LCL


1 16 13 5 11 6 10.2 11.25904 5.146667 -0.96571 11
2 0 6 8 10 5 5.8 11.25904 5.146667 -0.96571
3 7 5 10 9 7 7.6 11.25904 5.146667 -0.96571 9
4 9 9 4 10 1 6.6 11.25904 5.146667 -0.96571
5 1 0 0 8 5 2.8 11.25904 5.146667 -0.96571
7
6 0 7 1 5 0 2.6 11.25904 5.146667 -0.96571
7 2 10 2 3 4 4.2 11.25904 5.146667 -0.96571
8 10 0 2 6 10 5.6 11.25904 5.146667 -0.96571 5
9 6 6 4 6 4 5.2 11.25904 5.146667 -0.96571
10 2 4 2 5 4 3.4 11.25904 5.146667 -0.96571 3
11 5 5 3 9 4 5.2 11.25904 5.146667 -0.96571
12 5 6 4 3 9 5.4 11.25904 5.146667 -0.96571
1
13 9 3 3 8 6 5.8 11.25904 5.146667 -0.96571
14 2 0 1 4 6 2.6 11.25904 5.146667 -0.96571
1 2 3 4 5 6 7 8 9 10 11 1
15 0 6 7 8 0 4.2 11.25904 5.146667 -0.96571 -1

-3
1

1 2 3 4 5 6 7 8 9 10 11 1
-1
CENTRAL LINE CL 5.146667
UPPER CONTROL LIMIT UCL 11.25904 -3
LOWER CONTROL LIMIT LCL -0.96571
STANDARD DEVIATION 2.037459
The porcess is in control