Al YOSR City 200 SQM Units: Budget Quantity U.P Total Code Description Unit Symbol Assigned Subcontractor

This document contains a budget and itemized list of materials for the construction of residential units in Al YOSR City. It includes line items for general fees, earth works, concrete works, masonry works, wall finishing, and floor finishing. Concrete works are the largest portion and include foundations, structural floors, structural elements, and more. Masonry works include concrete block works for walls. Wall finishing includes plastering, painting, cladding and other items. Floor finishing includes concrete flooring, ceramic tile flooring for rooms, toilets, and wet areas. The quantities and unit prices are provided for each material.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views5 pages

Al YOSR City 200 SQM Units: Budget Quantity U.P Total Code Description Unit Symbol Assigned Subcontractor

This document contains a budget and itemized list of materials for the construction of residential units in Al YOSR City. It includes line items for general fees, earth works, concrete works, masonry works, wall finishing, and floor finishing. Concrete works are the largest portion and include foundations, structural floors, structural elements, and more. Masonry works include concrete block works for walls. Wall finishing includes plastering, painting, cladding and other items. Floor finishing includes concrete flooring, ceramic tile flooring for rooms, toilets, and wet areas. The quantities and unit prices are provided for each material.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Al YOSR City 200 sqm units

Unit Budget
Code Description Assigned Subcontractor
Symbol Quantity U.P TOTAL
001 General Fees
001-1 - Financial fees
001-2 - Equipment
001-3 - General Expenses
002 Earth Works
002-1 - Fine Grading m² 200.00
002-2 - Excavation m³ 53.00
002-3 - Bsckfilling m³ 8.00
002-4 - Waste Removal m³ 45.00
003 Concrete Works
003-1 Lean Concrete / Blinding m³ 0.00
003-1-1 -Material per m³
Cement kg 0.00
Aggregates kg
Sand kg
003-1-2 -Labor per m³
003-1 - Foundation for boundary wall m³ 4.00
003-1-1 -Material per m³
Cement kg 1296.00
-steel
Aggregates kg
Sand kg
003-1-2 -Labor per m³
003-2 - Structural foors m² 27.00
003-2-1 -Material m³
Cement kg 874.80
-steel
Aggregates kg
Sand kg
003-2-2 -Labor per m²
003-3 - foundations m³ 21.00
003-3-1 -Material m³
Cement kg 6804.00
-steel
Aggregates kg
Sand kg
003-3-2 -Labor per m³
Al YOSR City 200 sqm units
Unit Budget
Code Description Assigned Subcontractor
Symbol Quantity U.P TOTAL
003-4 -Structural Elements (Slabs, Stairs, Parapets) m³ 35.00
003-4-1 -Slab
003-4-1-1 Cement kg 11340.00
003-4-1-2 -steel
003-4-1-3 Aggregates kg
003-4-1-4 Sand kg
003-4-1 -Stairs
003-4-1-1 Cement kg 0.00
003-4-1-2 -steel
003-4-1-3 Aggregates kg
003-4-1-4 Sand kg
003-4-1 -stair case slab, lintels
003-4-1-1 Cement kg 0.00
003-4-1-2 -steel
003-4-1-3 Aggregates kg
003-4-1-4 Sand kg
003-4-2 -Labor per m³
Al YOSR City 200 sqm units
Unit Budget
Code Description Assigned Subcontractor
Symbol Quantity U.P TOTAL
004 Masonry Works (block Works)
004-1 -Concrete Block Works 40*20*20 m² 20.00
004-1-1 - 40*20*20 Concrete Blocks UNIT 260.00
Cement Kg 1149.20
004-1-2 -Mortar KG 36.12
004-1-3 -Labor QAD
004-2 - Concrete Block Works 40*20*15 m² 83.00
004-2-1 - 40*20*15 Concrete Blocks UNIT 1079.00
Cement Kg 3647.02
004-2-2 -Mortar KG 112.4235
004-2-3 -Labor per m²
004-2 Lintels m³ 0.00
004-2-2 -Cement KG 0
004-2-3 -Labor per m²
005 Wall Finishing
005-1 -Wall Plastering m² 340.00
005-1-1 -Material kg 2558.50
005-1-2 -Labor per m²
005-2 - Wall Gypsum Plaster m² 215.00
005-2-1 -Material kg
005-2-2 -Labor per m²
005-3 - Wall Painting m² 555.00
005-3-1 -Material kg / m²
005-3-2 -Labor per m²
005-4 - Granites Wall Cladding m² 37.00
005-4-1 -Material m²
005-4-2 -Mortar kg 278.43
005-4-3 -Labor per m²
005-5 - Skirting m 28.00
005-5-1 -Material m²
005-5-2 -Mortar kg 26.34
005-5-3 -Labor per m
005-6 - Double Coping for Windows m² 6.50
005-6-1 -Material kg 9.78
005-6-2 -Labor per m
005-7 - Aluminium Subframe for Fence m 28.00
005-7-1 -Material m
005-7-2 -Labor per m
006 Floor Finishing
006-1 - Concrete Flooring above backfilling (10cm) m² 90.00
006-1-1 -Material kg 2916.00
005-1-2 -Labor per m²
006-4 - Concrete Flooring for External Area (10cm) 34.00
006-4-1 -Material m² 1101.60
006-4-3 -Labor per m²
006-2 - Ceramic Flooring for Rooms 90.00
006-2-1 -Material m²
006-2-2 - Accessories Unit
006-2-3 -Mortar kg 677.25
006-2-4 -Joint Filler kg
006-2-5 -Labor per m²
006-3 - Ceramic Flooring for Toilets 8.00
006-3-1 -Material m²
006-3-2 - Accessories Unit
006-3-3 -Mortar kg 60.20
006-3-4 -Joint Filler kg
006-3-5 -Labor per m²
006-5 - Ceramic Tiles for Wet Areas (walls) 73.00
006-5-1 -Material m²
006-5-2 - Accessories Unit
006-5-3 -Mortar kg 549.33
006-5-4 -Joint Filler kg
006-5-5 -Labor per m²
Al YOSR City 200 sqm units
Unit Budget
Code Description Assigned Subcontractor
Symbol Quantity U.P TOTAL
007 -Doors and Windows
007-1 -Wooden Doors Unit 8.00
007-1-1 -Material Unit
007-1-2 -Labor per Unit
007-2 -PVC Doors Unit 4.00
007-2-1 -Material Unit
007-2-3 -Labor per Unit
007-3 -PVC Windows 2.00
007-3-1 -2.00 x 1.50 Unit 2.00
007-3-1-1 -Material Unit 2.00
007-3-1-2 -Labor per Unit
007-3-2 -1.70 x 1.50 Unit 1.00
007-3-2-1 -Material Unit 1.00
007-3-2-2 -Labor per Unit
007-3-3 -1.00 x 1.50 Unit 1.00
007-3-3-1 -Material Unit
007-3-3-2 -Labor per Unit
007-3-4 0.70 x 0.70 Unit 2.00
007-3-4-1 -Material Unit 2.00
007-3-4-2 -Labor per Unit
007-4 - Entrance Steel Gate 1.00
007-5-1 -Steel Gate 2.80 x 1.60 Unit 1.00
007-5-2 - Concrete Foundation & columns m³ 0.69
007-5-3 -Paint kg
007-5-4 -Hardware Unit
007-5-5 -Labor per Unit
008 Mechanical Works
Protection m³ 1.00
Cement 376.25
008-1 -Decorated Sink (60 x 45 cm) unit 2.00
008-1-1 -Material Unit
008-1-2 -Labor per Unit
008-2 -W.C (Stand Model) unit 1.00
008-2-1 -Material Unit
008-2-2 -Labor per Unit
008-3 -W.C (Floor Model) unit 1.00
008-3-1 -Material Unit
008-3-2 -Labor per Unit
Al YOSR City 200 sqm units
Unit Budget
Code Description Assigned Subcontractor
Symbol Quantity U.P TOTAL
008-4 -Piping
008-4-1 - Galvanized 3" Piping m 10.00
008-4-1-1 -Material m
008-4-1-2 -Labor per m
008-4-1 - Galvanized 1" Piping m 30.00
008-4-1-1 -Material m
008-4-1-2 -Labor per m
008-4-1 - Galvanized 3/4" Piping m 90.00
008-4-1-1 -Material m
008-4-1-2 -Labor per m
008-4-1 - Galvanized 4" Piping m 40.00
008-4-1-1 -Material m
008-4-1-2 -Labor per m
008-4-1 - Galvanized 6" Piping m 15.00
008-4-1-1 -Material m
008-4-1-2 -Labor per m
008-5 - PVC Water Tank 1 m³ Unit 1.00
008-5-1 -Material Unit
008-5-2 -Labor per Unit
008-6 - Water Fountain (Robinette) unit 2.00
008-6-1 -Material Unit
008-6-2 -Labor per Unit
008-7 -Manholes
008-7-1 - Concrete 30 x 30cm unit 1.00
008-7-1-1 -Material m³ 0.07
Cement kg 21.87
-Cover Unit 1.00
008-7-1-2 -Labor per unit
008-7-1 - Concrete 40 x 40 cm unit 6.00
008-7-1-1 -Material m³ 0.72
Cement kg 233.28
-Cover unit u
008-7-1-2 -Labor per unit
009 Electrical Works
009-1 Electrical works
009-1-1 -Material Unit