Transformation Model and Implementation From EBOM To MBOM For MRO System
Transformation Model and Implementation From EBOM To MBOM For MRO System
Abstract-In order to solve the transformation problem of engineering BOM to manufacturing BOM without resolving
ROM from engineering ROM to maintenance ROM for MRO the transformation between engineering BOM and
system (MRO, Maintenance, Repair and Overhaul), a formal maintenance BOM[7]. WANG Ji-tian and SI Shu-bin solve
transformation model of ROM view is established. In this model, the maintenance BOM problems for complex equipments by
the intermediate component, inherit component, virtual
building the network structure model of maintenance BOM
component are defined on the specific maintenance
based on the maintenance structural factors information
management domain, and the transformation process from
[2].Changho Lee, Choon Seong Leem and Inhyuck Hwang
engineering ROM to maintenance ROM is discussed through
feature recognition methods and rules. Last, the proposed discussed rules of transformation based on clear analysis of
model is applied to MRO system for a steel manufacturing the relationship between engineering BOM and manufacturing
enterprise, which indicates that this methodology is effectual to BOM.Zhang Shuai, Sun Shu-dong, Cai Zhi-qiang, Dong Wei
the problem. described the characteristics of maintenance BOM and put
forward the integration method based on XML
Keywords-Engineering ROM, Maintenance ROM, MRO,
technologies ,but only focused on maintenance BOM without
Transformation
engineering BOM or the process of converting engineering
the steel industry, a variety of large-scale steel-making which computer can recognize and links the all business
equipment need maintenance, repair and overhaul processes of enterprise. BOM forms the fundamental data of
(Maintenance, Repair and Overhaul, MRO) for ensuring the the PDM / MRO system and other information systems, and
production process. MRO management system provides the structure of BOM have a significant impact on the system
(Bill Of Material) management, query summary, message PDM system, MBOM (Maintenance BOM) in the MRO
service, change management techniques. BOM management system, shows different views between PDM and MRO
systems.
is what we mainly focus on. Maintenance activity as a
corresponding of a physical part, so the BOM is the EBOM is used to represent the structure of the product
organization structure of serving object. And you can add when designed, production design department to an enterprise
some kind files to the part in BOM to record the content of use EBOM to manage the bill of materials forming a new
the maintenance activity. Through the construction of BOM, production. EBOM extracts relevant data from the design
we can organize and manage MRO business data BOM drawings, including product name, product structure and the
effectively and clearly. relationship between parts of the assembly properties.
·
Corresponding author: [email protected]; [email protected]
FigJ EBOM
547
Intennediate part
Inherited part
Fig.2 MBOM
Gij
.
f (t;r (0 (EEOM) ) ) .
=
MBOM
assembly relationship Gij is fonned by nij Sub-components.
MBOM:
M
=
(AM,eM ,NM) to represent. various special components need maintenance staff to define.
The main task are removing some No-track parts, rebuilding
Based on the above definition, C1 is the set of all the the hierarchy of parts according to EBOM and composing a
inherited components. Cv is the set of all the virtual new virtual component. Hence, those works need for
human-computer interaction to complete.
components. C is the a set of all the intermediate
M IV. A CASE STUDY
components. And now, the transfonnation using feature
recognition methods and rules are created. For example, f In this section, an empirical case will be used to
M illustrate the feasibility of the proposed methods and rules.
the transfonnation rules for the intennediate components.
Nowadays, more and more iron and steel companies use
Let pM be the intennediate component, and then add the MRO system to manage all kinds of manufacturing
548
part .Fig.4 shows that the Long Side Parts is intennediate we should attach some maintenance files to the neutral
components through grouping Long Side Water Box, Long structure. Those files like Bitmap files to record the concrete
Side Copper Plate, Long Side Rollo Roller together, so is the product or maintenance plan files could help maintenance
Short Side Parts. personal to save time in founding the fault. In addition, all
the part must be assigned the Serial Number and
Fig.5 is the Neutral BOM of 4CC (the NO.4 continuous
Manufacture'ID at least. And we can attach some other
casting line) in Teamcenter 8.we can see all the parts in the
properties to physical part according to what you need.
Neutral BOM are traceable and serialized.
Through setting up the BOM, the company does the
Fig.6 shows the As-Maintained BOM of 4CC in
MRO service work orderly and further optimizes the
Teamcenter 8.it is clear that the two structures have the same
allocation of resources.
parts and hierarchy of parts.As the parts in the as-maintained
BOM represent the physical Item (part or parts), so before
generating the as-maintained structure from neutral structure,
Left Frame
Right Frame
Hydraulic Cylinder
549
Left Frame
Right Frame
Right Side Back Plate
Hydraulic Cylinder
Neutral Structw-e
550
�,. I �" (nn?g?6-4CC) L
rent � Dat@ - Curr@nt J RootStructur@s 1002926/1111:::::::J
Item N8/II@ lA.s-Maintain@dSlruc. ,I H@m Typ@ I Part Humber I Part Used ISerial N. / I Manufacturer' s IDI Part Number I Quantity hnstallatio.. hnstallati
(>
'
"
� � MD 002927/102-< Physical Part 002927 Preferred 102 102 002927 12-Feb-2010 12-Feb-201
$ af; Ion;: side parts 002930/103-< Physical Part 002930 Preferred 103 103 002930 12-Feb-2010. 12-Feb-201
i" ..� long side water box
..
002938/110-< Physical Part 002938 Preferred 110 110 002938 12-Feb-2010 12-Feb-201
B" � Ion; side rollo r. . 002940/11 I-A Physical Part 002940 Preferred 111 111 002940 12-Feb-2010. 12-Feb-201
: ;""� short one-thir 002942/465-< Physical Part 002942 Preferred 465 2 002942 12-Feb-2010 12-Feb-201
i .... � long one-third. 00294.1/49S-A Physical Part 00294.1 Preferred 498 002941 12-Feb-2010. 12-Feb-201
:. � long side copper 002939/112-< Physical Part. 002939 Preferred 112 112 002939 12-Feb-2010. 12-Feb-201
f·· · af; stirrer fast.ening as. 002932/104-< Physical Part. 002932 Preferred 104 104 002932 12-Feb-2010. 12-Feb-201
:.... J; hydr&1.llic cylinder 002933/105-< Physical Part. 002933 Preferred 105 105 002933 12-Feb-2010 12-Feb-201
!$I..J; right. fr&me 002929/105-< Physical Part. 002929 Preferred 106 106 002929 12-Feb-2010. 12-Feb-201
S··� cone-widt.h-mod1.lla 002934/8-< Physical Part. 002934 Preferred 8 8 002934 12-Feb-2010 12-Feb-201
: .... � gear box 002936/498-< Physical Part. 002936 Preferred 498 002936 12-Feb-2010. 12-Feb-201
: � right. side back p 002937/87-< Physical Part. 002937 Preferred 87 002937 12-Feb-2010 12-Feb-201
$ af;
.. short. side parts 002931/107-A Physical Part. 002931 Preferred 107 107 002931 12-Feb-2010. 12-Feb-201
S·· � short. side rollo 002940/3-< Physical Part. 002940 Preferred 3 3 002940 12-Feb-2010 12-Feb-201
: �... af; short. one-t.hir. 002942/4-A Physical Part. 002942 Preferred 002942 12-Feb-2010 12-Feb-201
: ,. . J; long one-t.hird 002941/4-< Physical Part. 002941 Preferred 002941 12-Feb-2010 12-Feb-201
:.... � short. side copper. 002939/3-A Physical Part. 002939 Preferred 002939 12-Feb-2010 12-Feb-201
i .& short. side wat.er box 002938/149-A Physical Part. 002938 Preferred 149 002938 12-Feb-2010 12-Feb-201
a·· J; left. fr&me 002928/108-A Physical Part. 002928 Preferred 108 108 002928 12-Feb-2010 12-Feb-201
S·· a.S cone-widt.h-mod1.lla. 002934/5-A Physical Part. 002934 Preferred 5 5 002934 12-Feb-2010 12-Feb-201
: :... af; gear box 002936/7-A Physical Part. 002936 Preferred 002936 12-Feb-2010 12-Feb-201
: ·aZ left. side back plat.e 002935/6-A Physical Part. 002935 Preferred 002935 12-Feb-2010 12-Feb-201
REFERENCES
[I] Junhao Geng, Zhenming Zhang, Xitian Tian, Dinghua Zhang, (2008)
Product Lifecycle-oriented BOM Similarity Metric Method. Advanced
Design and Manufacture to Gain a Competitive Edge [J], Chapter 4,
473-482
[2] WANG Ji-tian; SI Shu-bin, The Integrated Modeling Method for the
Maintenance BOM of Complex Equipments. Manufacture Information
Engineering of China[J], Vol.40 No.23, Dec. 2011
[3] Changho Lee, Choon Seong Leem and Inhyuck Hwang. PDM and ERP
integration methodology using digital manufacturing to support global
manufacturing. The International Journal of Advanced Manufacturing
Technology. Volume 53, No. 1-4, 399-409,July.2010
[4] Zhang Shuai, Sun Shu-dong, Cai Zhi-qiang, Dong Wei. Designed the
servicing BOM and integration based on XML. MODERN
MANUFACTURING ENGINEERING[J].NO.I , 2008
[5] CAl Li-xia, CHU Xue-ning, ZHANG Zai-fang, CHENG Hui,
Modeling and Implementation of BOM Multi-view Transformation for
Complex Product. Machine Design and Research [J], Vol.24 No.3, Jun.
2008
551