Structural Peer Review: General Information
Structural Peer Review: General Information
The final selection will be made by mutual consent; after which, a meeting between the Building
Official and the Engineer must be scheduled prior to commencement of the Structural Peer
Review.
Page 1 of 2
8) Review the structural and architectural plans for the building. Confirm that the structural plans are in
general conformance with the architectural plans regarding loads and other conditions that may affect
the structural design.
9) Confirm that major mechanical items are accommodated in the structural plans.
10) Confirm that all items defined in Structure are in accordance with the Florida Building Code.
11) Attest to the general completeness of the structural plans and specifications.
Structural Calculations: The structural calculations prepared by the structural engineer of record
shall be submitted to the Reviewing Engineer, upon his/her request, for reference only. The
Reviewing Engineer shall not be obliged to review or check these calculations. If the design criteria
and design assumptions are not shown on the drawings or in the computations, the structural
engineer of record shall provide a statement of these criteria and assumptions for the reviewer.
1) The codes and standards used in the structural design of the project.
2) The structural design criteria, including loads and performance requirements.
3) The basis for design criteria that are not specified directly in applicable codes and standards. This
should include reports by specialty consultants such as wind tunnel study reports and geotechnical
reports. Generally, the report should confirm that existing conditions at the site have been investigated
as appropriate and that the design of the proposed structure is in general conformance with these
conditions.
Phased submission. If an application is submitted for a permit for the construction of foundations
or any other part of a building before the construction documents for the whole building have
been submitted, then the Structural Peer Review and report shall be phased. The Reviewing
Engineer shall be provided with sufficient information upon which to perform a Structural Peer
Review for the phased submission.
Approval Stamps: Upon the approval of the plans, the reviewing engineer shall sign, date and
stamp each drawing page with the language “PEER REVIEWED in accordance with City of Miami
requirements for Structural Peer Review, and verified for Code Compliance”.
Responsibility:
Structural Engineer of Record. The Structural Engineer of Record shall retain sole responsibility for
the structural design. The activities and reports of the Reviewing Engineer shall not relieve the
Structural Engineer of Record of this responsibility.
Reviewing Engineer. The Reviewing Engineer’s report states his or her opinion regarding the
design by the engineer of record. The standard of care to which the Reviewing Engineer shall be
held in the performance of the Structural Peer Review and report is that the level of skill and care
are consistent with Structural Peer Review services performed by professional engineers licensed
in the State of Florida for similar types of projects.
Page 2 of 2