‘06 Dee 2010 MS Number: 1000-211-V8-0000-01004 Revision 003 Page 1 of 41
SS
& SS A HYUNDAI
eMPLorER mc conreacton
Method Statement
HYUI
Kee jal Hyundai Engineering & Construction Co. Ltd.
Fea 90851, KHALIFA PORT AND INDUSTRIAL ZONE PROJECT
‘CONTRACT NO.1000-211
ie 3 an wi OFFSHORE TERMINAL AREA
RECEIVED MAIN QUAY WALL
CAPPING BEAM
a= wm ae
1 coms sete vom an
cons etonmnsnm wencsrncne
tne
QEERMMG ANE ae
“fy teh
Doe. No.: 1000-211-V8-0000-01004-003
HYUNDAT
KPIZ Project
1000-211
03 JAN 2011 ‘ee 100021. ¥.0008.0700 Ry 2
ISSUED FOR KPIZ DCC 30 DEC'10 7:07
CONSTRUCTION| Khalifa Port and Industrial Zone Project
OFFSHORE TERMINAL AREA
AHYUNDAL ==
ENGINEERING & CONSTRUCTION Tel: +971-02-510-5222
men COU | Fax: 4971-02-510-5210
Email: [email protected]
P.O. Box : 76685 Samha Abu Dhabi U.A.E
Transmittal No. | 1000-211-CX-OC-1B-00605
INTERNATIONAL BECHTEL CO. LTD.
Khalifa Port and Industrial Zone Project
clo Abu Dhabi Ports Company.
P.O. Box 54477
Abu Dhabi, U.A.E
ao Ms, Elizabeth Beresford
Attention: epg etbe Date 07 December 2010
: Yung Chun Ha ;
E romn Project Manager / HEC Signature
Reference Submission of Method Statement
Document Submitted issue Media ‘Submitted For
Method Statement re DVD 1. Review & Approval
Meeting Minutes co 2. For Review & Comment
Drawing Hard Copy | | 3: As Required
| | better useiHard Disk | |_| | 4. For Information
Invoice 5. For Records & Action
No. Document No. rev. | Description
Method Statement for Main Quay Wall
1 | 1000-211-v8-0000-01004 | 003 en berae
marke
Please sign and return
Received by Designation Date Signature
Form No: QP-01-001 Rev.006 Dec 2010
MS Number: 1000-211-V8-0000-01004 _Revision 003 Page 2 of 41
SS
Khalifa Port and Industrial Zone (KPIZ)
Hyundai Engineering and Construction Co., LTD
1000.211
Review Comment Sheet
‘Submittal Title: Method Statement for Main Quay Wall Capping Beam
Document No: 1000-21 1-V8,0000-01006 Rev 002
Date on Submittal: 24" October 2010
‘Comment | Section
Te | aeons Reviewer Comment Contractor Response
There is no mention in MS about erection of | Already mentioned on section 2.5
hand railing on top of pour or cantilever | clause 11
access around top of pour as shown in photos
to mitigate leading edge hazard.
a a3 SMcC/DR | Rev 002— There is no mention of the methods | Incorporated on section 2.5 clause 9
that have been incorporated on site, i.e. posts | & 11 and in risk assessment
fixed to formwork, sleeves for post to be
embedded in 2" lift concrete, safety chains
etc, Please incorporate into MS and RA
‘The CM shall ensure quality of the product to | Noted and updated
his supervisors; the QA team are not the first
36 | 2.6.2 Part4 SMeC line of inspection.
Rev 002- Text has not been updated
Doe, Ne, 1000-217-V8-0000-01004 Rev. 003