0% found this document useful (0 votes)
237 views48 pages

Method Statement For Erection of Precast Element

Method Statement for Erection of Precast Element
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
237 views48 pages

Method Statement For Erection of Precast Element

Method Statement for Erection of Precast Element
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 48
‘06 Dee 2010 MS Number: 1000-211-V8-0000-01004 Revision 003 Page 1 of 41 SS & SS A HYUNDAI eMPLorER mc conreacton Method Statement HYUI Kee jal Hyundai Engineering & Construction Co. Ltd. Fea 90851, KHALIFA PORT AND INDUSTRIAL ZONE PROJECT ‘CONTRACT NO.1000-211 ie 3 an wi OFFSHORE TERMINAL AREA RECEIVED MAIN QUAY WALL CAPPING BEAM a= wm ae 1 coms sete vom an cons etonmnsnm wencsrncne tne QEERMMG ANE ae “fy teh Doe. No.: 1000-211-V8-0000-01004-003 HYUNDAT KPIZ Project 1000-211 03 JAN 2011 ‘ee 100021. ¥.0008.0700 Ry 2 ISSUED FOR KPIZ DCC 30 DEC'10 7:07 CONSTRUCTION | Khalifa Port and Industrial Zone Project OFFSHORE TERMINAL AREA AHYUNDAL == ENGINEERING & CONSTRUCTION Tel: +971-02-510-5222 men COU | Fax: 4971-02-510-5210 Email: [email protected] P.O. Box : 76685 Samha Abu Dhabi U.A.E Transmittal No. | 1000-211-CX-OC-1B-00605 INTERNATIONAL BECHTEL CO. LTD. Khalifa Port and Industrial Zone Project clo Abu Dhabi Ports Company. P.O. Box 54477 Abu Dhabi, U.A.E ao Ms, Elizabeth Beresford Attention: epg etbe Date 07 December 2010 : Yung Chun Ha ; E romn Project Manager / HEC Signature Reference Submission of Method Statement Document Submitted issue Media ‘Submitted For Method Statement re DVD 1. Review & Approval Meeting Minutes co 2. For Review & Comment Drawing Hard Copy | | 3: As Required | | better useiHard Disk | |_| | 4. For Information Invoice 5. For Records & Action No. Document No. rev. | Description Method Statement for Main Quay Wall 1 | 1000-211-v8-0000-01004 | 003 en berae marke Please sign and return Received by Designation Date Signature Form No: QP-01-001 Rev.0 06 Dec 2010 MS Number: 1000-211-V8-0000-01004 _Revision 003 Page 2 of 41 SS Khalifa Port and Industrial Zone (KPIZ) Hyundai Engineering and Construction Co., LTD 1000.211 Review Comment Sheet ‘Submittal Title: Method Statement for Main Quay Wall Capping Beam Document No: 1000-21 1-V8,0000-01006 Rev 002 Date on Submittal: 24" October 2010 ‘Comment | Section Te | aeons Reviewer Comment Contractor Response There is no mention in MS about erection of | Already mentioned on section 2.5 hand railing on top of pour or cantilever | clause 11 access around top of pour as shown in photos to mitigate leading edge hazard. a a3 SMcC/DR | Rev 002— There is no mention of the methods | Incorporated on section 2.5 clause 9 that have been incorporated on site, i.e. posts | & 11 and in risk assessment fixed to formwork, sleeves for post to be embedded in 2" lift concrete, safety chains etc, Please incorporate into MS and RA ‘The CM shall ensure quality of the product to | Noted and updated his supervisors; the QA team are not the first 36 | 2.6.2 Part4 SMeC line of inspection. Rev 002- Text has not been updated Doe, Ne, 1000-217-V8-0000-01004 Rev. 003

You might also like