0% found this document useful (0 votes)
24 views

1111 - Table of Contents

This document outlines the contents of a project report, including chapters on the project background, design inputs, project/system design, and final design. The project background chapter describes the project objectives, scope, management, and methodology. The design inputs chapter covers constraints, standards, and hardware/software requirements. The project/system design chapter includes system flowcharts, diagrams, and software design documents. Finally, the final design chapter presents screenshots, testing plans, deployment, maintenance, and conclusions. Index sections provide references, progress monitoring, standards, resumes, and evidence of client interactions and programming codes.

Uploaded by

Espie Peña
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views

1111 - Table of Contents

This document outlines the contents of a project report, including chapters on the project background, design inputs, project/system design, and final design. The project background chapter describes the project objectives, scope, management, and methodology. The design inputs chapter covers constraints, standards, and hardware/software requirements. The project/system design chapter includes system flowcharts, diagrams, and software design documents. Finally, the final design chapter presents screenshots, testing plans, deployment, maintenance, and conclusions. Index sections provide references, progress monitoring, standards, resumes, and evidence of client interactions and programming codes.

Uploaded by

Espie Peña
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

TABLE OF CONTENTS

Chapter 1 – Project Background


1.1 The Project .......................................................................................................................................... 1
1.2 Project Objectives ............................................................................................................................... 2
1.3 Scope and Limitations ......................................................................................................................... 3
1.4 Project Management .......................................................................................................................... 3
1.5 Methodology ....................................................................................................................................... 4
Chapter 2 – Design Inputs
2.1 Design Constraints .............................................................................................................................. 5
2.2 Design Standards................................................................................................................................. 5
2.3 Hardware and Software Requirements .............................................................................................. 6
Chapter 3 – Project / System Design
3.1 Input-Process-Output.......................................................................................................................... 7
3.2 System Flowchart ................................................................................................................................ 7
3.3 Software Design .................................................................................................................................. 9
3.3.1 Database Design ..................................................................................................................... 9
3.3.2 Use Case Diagram ................................................................................................................. 10
3.3.3 Data Flow Diagram ................................................................................................................ 11
3.3.4 State Diagram/Sequence Diagram ........................................................................................ 12
Chapter 4 – Final Design
4.1 Screenshots and Testing of the Software Applications/System ....................................................... 13
4.2 Deployment Plan ............................................................................................................................... 14
4.3 Maintenance Plan ............................................................................................................................. 15
4.4 Conclusion and Recommendation .................................................................................................... 16

Indices

A. References ............................................................................................................................... 14
B. Task Monitoring Progress ........................................................................................................ 16
C. Standards ................................................................................................................................. 27
D. Curriculum Vitae ...................................................................................................................... 29
E. Evidence of Interview with the client...................................................................................... 36
F. Evidence of Testing with the client ........................................................................................ 36
G. Evidence of Deployment with the client ................................................................................ 37
H. Evidence of working in groups ................................................................................................ 37
I. Documented Programming Codes .......................................................................................... 38
LIST OF FIGURES

Fig 1.4: GANTT chart………………………………………………………………….………..3

Fig 1.6: SDLC Process…………………………………………………………………...……4

Fig 3.1: input-Process-Output………………………………………………….………….......7

Fig 3.2: System Flowchart…………………………………………..…………………….……8

Fig 3.3.1: Entity relationship diagram…………………………………………………………9

Fig 3.3.2: Use Case Diagram……………………………………………………………...…10

Fig 3.3.3: Data Flow Diagram……………………………………………....……………..…11

Fig 3.3.4: State Diagram/Sequence Diagram……………………………………………....12

Fig 5.1: Evidence of Interview with the client……………………………………………….36

FIG 5.2: Evidence of Testing with the client ………………………………………….…....36

FIG 5.3: Evidence of Deployment to the client………………………………………….….37

FIG 5.4: Evidence of working in groups …………………………………………….…….. 37

FIG 5.5: Documented programming codes…………………………………………..……..38

You might also like