DFT Measurement: Typical Double Bottom Block

This document provides instructions for conducting DFT measurements on a structure with a total area of 2,790 square meters to be painted. It specifies taking a total of 3,400 measurements, including 92 on long and transverse seams, 22 on flat areas, and measurements around openings greater than 400mm. The measurements are to ensure appropriate coating thickness is achieved during painting.

Uploaded by

Gilvan Silva
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
68 views

DFT Measurement: Typical Double Bottom Block

This document provides instructions for conducting DFT measurements on a structure with a total area of 2,790 square meters to be painted. It specifies taking a total of 3,400 measurements, including 92 on long and transverse seams, 22 on flat areas, and measurements around openings greater than 400mm. The measurements are to ensure appropriate coating thickness is achieved during painting.

Uploaded by

Gilvan Silva
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

DFT Measurement

Long spacing 0.7 – 0.95m

Typical Double Bottom Block


DFT Measurement

Flat area 22 points

Long and Trans 60 points


: Flat area (1 reading / 5 m2) : Long & Trans (2 reading/2~3m)
DFT Measurement

26 Openings

12 Openings

8 Openings
42 openings – 92 measurements

Openings > 400mm – 4 measurements


DFT Measurement

Total area to paint 2,790m2

Total measurements 3,400