This document is a control plan for manufacturing a gasket. It outlines the key characteristics that will be monitored and controlled during production, including thickness, dimensions, material properties, and visual characteristics. It specifies the measurement techniques, sample sizes, frequencies, and reaction plans for addressing any non-conformances. Key contacts are provided for quality approval.

Uploaded by

Raquel Mungcal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
144 views

Controlplan en

This document is a control plan for manufacturing a gasket. It outlines the key characteristics that will be monitored and controlled during production, including thickness, dimensions, material properties, and visual characteristics. It specifies the measurement techniques, sample sizes, frequencies, and reaction plans for addressing any non-conformances. Key contacts are provided for quality approval.

Uploaded by

Raquel Mungcal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CONTROL PLAN

Page 1
Prototype Pre-launch X Production Key Contact/Phone Date (Orig.) Date (Rev.)
Control Plan Number Mr. Müller 2006-01-10
Part Number/Latest Change Level Core Team Customer Engineering Approval/Date (if Req’d)
Mr. Meier
Part Name/Description Supplier/Plant Approval/Date Customer Quality Approval Date (if Req’d)
gasket
Supplier/Plant Supplier Code Other Approval/Date (If Req’d) Other Approval/Date (if Req’d)
Elring Klinger/Dettingen
Characteristics Methods

Sample Reaction Plan


Part/ Process Name/ Machine, Device, Special Product/Process Evaluation
Process Operation Description Jig, Tools No. Product Process Char. Specification/ Measurement Control Method
Number For Mfg. Class Tolerance Technique Size Freq.

II1 cover sheet - 1 identification - visual 100% visual control


thickness - control plan CAQ external micrometer 10% of coils dimensional control redelivery
dimension - tape measure 10% of coils dimensional control
II2 binding sheet - 2 identification - visual 100% visual control
thickness - control plan CAQ external micrometer 10% of coils dimensional control redelivery
dimension - tape measure 10% of coils dimensional control
II3 X-components - 3 solid-state body - control plan CAQ standard laboratory 1 charge dimensional control redelivery
primer content test
equipment
II4 X-components - 4 TGA - control plan CAQ TG-analyzer 2 Charge dimensional control
elastomere redelivery
solvent viscosity - control plan CAQ standard laboratory 2 Charge dimensional control
test
equipment
II5 X-components - 1 state and colour - - specification visual control 100% visual control, CAQ redelivery
O-2002 coating 2 test certificate - - specification check visual control 1 delivery visual control, CAQ

OP1 punching Stamping machine 1 feed - see production plan control with press 1 BO visual control correct the machinery
beading 2 press power - adjustment (SPS)
planishing 3 thickness (sheet) -see production plan, EK device 1 BO dimensional control
drawing correct the process,
4 Fixing hole see working station list gage 1/1 BO/end first / last piece sort out incorrect parts
control plan CAQ
5 bead height SC2 PP DM 050 EK-device 1 BO dimensional control
1 3000
6 Bead height - - AA QS/Z 16D Press 1 BO first / last piece
(blue print)
7 complete contour - - hole compl, pos. gauge 1/1 BO/end first / last piece block, correct machine
PP DM 050
OP2 punching Stamping machine 1 feed - see production plan control with press 1 BO visual control correct the machinery
raising 2 press power - see working station list adjustment (SPS) 1 BO visual control correct the machinery
folding layer 3 thickness (sheet) - see production plan, external micrometer 1 BO dimensional control
drawing
4 combustion - see working station list reduced sliding caliper 3 2 hours dimensional control correct the process,
chamber Ø control plan CAQ sort out incorrect parts
F QS 98a-9707 D

5 folding layer width - sliding caliper 3 2 hours dimensional control

6 complete contour - - hole compl, pos. gauge 1/1 BO/end first / last piece block, correct machine
PP DM 030