Health Safety & Environment WI - C PDF
Health Safety & Environment WI - C PDF
MASTER COPY
ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK —422 011
ASHOM
Health, Safety and Environment Work Instructions
13 WI/CO/DO/PR/HSE/13 Departmental Functional Competency QMS 7.2 /EMS 7.2 & 7.3/
Matrix 2 1
OHSAS 4.4.2
-—
Departure Head I Director Manag; - • Representative
Prepared *By Approved By Lr.utelAySTER COPY
• •4 • NU=
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK —422 011 ASHOM
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
Title: Table of Contents (Master List of Work Instructions)
QMS:9001: 2015,
Sr. No. of Rev.
Document No. Description EMS:14001: 2015 &
No. pages No.
OHSAS: 18001: 2007
Participation and Consultation
1. Departmental Staff
15 WI/CO/DO/PR/HSE/15 2. Inter Departmental OHSAS 4.4.3.2 1 1
3. Stake Holders / Govt. Officers
Evaluation of Compliance
1) Departmental Legal & Other
EMS 6.1.3 /
20 WI/CO/DO/PR/HSE/20 requirement compliance procedure 1 1
OHSAS:4.5.2
2) Departmental customer compliance
procedure
QMS 8.7, 10.2, 6.1 & 10.3
21 WI/CO/DO/PR/HSE/21 Improvements / EMS: 10.2 / OHSAS: 1 1
4.5.3.1
QMS: 7.5.2,7.5.3 /EMS
22 WI/CO/DO/PR/HSE/22 Control of Documented Information 4 1
7.5.2,7.5.3 / OHSAS 4.5.4
N• IIli .\,
grub
# ‘A Cam.
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK —422 011 ASH., M
Health, Safety and Environment Work Instructions
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
QMS:9001: 2015,
Sr. No. of Rev.
Document No. Description EMS:14001: 2015 &
No. , pages No.
OHSAS: 18001: 2007
QMS: 7.5.2,7.5.3 /
Emergency Preparedness & response
32 WI/CO/DO/PR/HSE/32 EMS: 7.5.2,7.5.3 / 5 1
Procedure
OHSAS: 4.5.4
QMS: 8. 2 . 2/
34 WI/CO/DO/PR/HSE/34 Work Permit System 12 1
OHSAS: 4.4.6
. .
I/
..;V-
. II
N IV li
il
.A1----'
Depa ti t Head IM Director Manage nt Representative
Prepared . By Approved By
'IvAct8rER COPY
s_ ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK - 422 011 ASH OM
Health, Safety and Environment Work Instructions
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
07 'N
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK - 422 011 ASHOM
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
IP
Management Representative : 1
\
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
,
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK— 422 011 ASHOM
Doc. No.: WI/CO/DO/PR/HSE/04 REF.: QMS:7.5.2 / EMS:7.5.3 / OHSAS: 4.4.5 Pages: Page 1 of 3
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
Abbreviations
AA : Administrative Assistant
AGM : Assistant General Manager
BC : Business Concern
CA : Camp Administrator
D : Duration
DGM : Deputy General Manager
ED : Executive Director
EHS : Environment, Health and Safety
EIAC : Environment Impact Assessment Committee
0 FM
GM /SGM
: Foreman
: General Manager /Senior General Manager
HO : Head Office
HSE Officer : Health, Safety, Environment Officer
HSEMSM : Occupational Health Safety and Environment Management Systems Manual
I/C : In — Charge
IA : Internal Auditor
IPC : Interested Parties Concern
LC : Legal Concern
MP : Management Programme
MR : Management Representative
MSDS : Material Safety Data Sheet
OCP : Occupational Control Procedure
OHSE : Occupational Health Safety and Environment
OHSEMP : Occupational Health Safety and Environment Management Program
OHSPM : Occupational Health Safety and Environment Procedure Manual
• : Probability
PE
P : Project Engineer
PM : Project Manager
PO : Purchase Order
PPE : Personal Protective Equipment
QA : Quality Assurance
RA : Risk Assessment
RAC : Risk Assessment Committee
SC : Scale
SC : Sub Contractor
SE /SO : Safety Engineer / Safety Officer
SE : Severity •
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK— 422 011 ASHOM
Doc. No.: WI/CO/DO/PR/HSE/04 REF.: QMS:7.5.2 / EMS:7.5.3 / OHSAS: 4.4.5 Pages: Page 2 of 3
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
Term Definition
A systematic independent and documented process for obtaining audit evidence and evaluating it's
objectively to determine the extent to which the Integrated Management System audit criteria set
Audit by the Organization are fulfilled.
Correction
Action to eliminate a detected nonconformity.
Corrective
Action to eliminate cause of a detected nonconformity.
Action
Information and its supporting medium. Document is the piece of paper giving an information /
Document evidence / procedure.
Surroundings in which an organization operates, including air, water, land, natural resources, flora,
Environment fauna, and their interrelation.
Environmental Element of an organization activities or products or services that can interact with the environment.
Aspect
Any change to the environment, weather adverse or beneficial, wholly or partially resulting from an
Environmental
organization aspects.
Impact
Source, situation, or act with a potential for harm in terms of human injury or ill health, or
"hazard combination of these.
Hazard The process of recognizing a hazard in existence and defining its characteristics.
identification
Work-related events in which an injury or ill health or fatality occurred. Or could have occurred.
Incident
Person or group, inside or outside the workplace, concerned with or affected by the Integrated
Interested
management system of an organization.
Parties
Non Non-fulfillment of a requirement as per IMS standards, Applicable Rules & Regulations & Client
conformance requirements
Identifiable, adverse physical or mental condition arising from and/or made worse by a work
Ill Health
activity and/or work-related situation.
Management Representative ee
MASTER COPY]
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK— 422 011 ASH OM
Health, Safety and Environment Work Instructions
Doc. No.: WI/CO/DO/PR/HSE/04 REF.: QMS:7.5.2 / EMS:7.5.3 / OHSAS: 4.4.5 Pages: Page 3 of 3
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
Term Definition
Goals, in terms of integrated management system (Quality, Health, Safety and Environment)
Objectives performance, that an organization sets itself to achieve
Combination of the likelihood of an occurrence of a hazardous event or exposures and the severity
Risk
of injury or ill health that can be caused by the event or exposures.
Risk The process of evaluating the risks arising from a hazards, taking into account the adequacy of any
Assessment existing controls, and deciding whether or not the risks is acceptable.
IIIII ccupational The condition and factors that affect or could affect the health and safety of employees or other
health and workers (including temporary workers and contractor personnel), visitors or any person in the
Safety workplace.
Quality means doing the right things, the right way, first time and every time.
Quality
It is degree or level of excellence.
Preventive The action to eliminate the cause of a potential nonconformity or other undesirable potential
Action situation.
...
Management Representative
, NN
L MASTER COPY
Issued By
ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
HSE work instructions, standard operation procedures, formats and checklists are applicable and
should be implemented to the following projects and offices:-
•
1) Construction of roads, bridges, industrial buildings, residential and commercial complexes,
6) Camps, and
7) Toll plaza
4111!
Management Representative
Issued By e N\
MASTFR COPY
ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOKA
Health, Safety and Environment Work Instructions
Doc. No.: WI/CO/DO/PR/HSE/06 REF.: QMS 4.4 & 8.4 & EMS 4.4 Pages: Page 1 of 3
Issue No: 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
The HSE Department shall establish, implement and maintain a procedure(s) for following standards
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASH0M
Health, Safety and Environment Work Instructions
Doc. No.: WI/CO/DO/PR/HSE/06 REF.: QMS 4.4 & 8.4 & EMS 4.4 Pages: Page 2 of 3
Issue No: 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
7.1.2 People V
7.1.3 Infrastructure
7.1.4 Environment for the V
operation of processes
7.1.5 Monitoring and V
measuring resources
7.1.5.1 General V
7.1.5.2 Measurement V
traceability
7.1.6 Organizational V
knowledge
7.2 Competence V 7.2 Competence V 4.4.2 Competence, V
training and awareness
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOKA
Health, Safety and Environment Work Instructions
REF.: QMS 4.4 & 8.4 & EMS 4.4 Pages: Page 3 of 3
Doc. No.: WI/CO/DO/PR/HSE/06
Issue No: 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
i
Title: Departmental QHSE Requirement
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Doc. No.: WI/CO/DO/PR/HSE/07 REF.: QMS 5.2 / EMS: 5.2/ OHSAS:4.2 Pages: Page 1 of 1
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
OHSE POLICY
We, at ASHOKA BUILDCON LTD. are committed to become an icon in infrastructure development, through
innovation, professionalism, active leadership in product quality and sustained growth by delivering value to
our customers.
We shall conduct our operations in a manner so that we protect people, property and the environment by
identifying, controlling and reducing all associated risks to a level As Low As Reasonably Practicable.
1. Our commitment to continual improvement of quality, environmental, occupational, health and safety
management system performance
5. Communicating and consulting all associated stakeholders for establishing organizational objectives.
To improve planning
Minimizing Air, Land and Water Pollution and preventing injury and ill health.
Management Representative
MASTER COPY
Issued By
ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK —422 011 ASHOM
Doc. No.: WI/CO/DO/PR/HSE/08 REF.: QMS 5.3 EMS: 5.3/OHSAS:4.4.1 Pages: Page 1 of 1
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
Organization Chart
Apex Band: 00
AGM/ DGM/ GM
G Band: 00
M Band : 01
HSE Executive/
Assistant Manager
E Band : 00
Project Projects
Documentation
Assistant
0 Band : 05
Staff Band : 00
Management Representative
e
Issued By MASTER COPY
ONLY -I
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
Issue No: 01
Management Representative ps
Issued By )
{ MASTER COPY
ONLY IF IN RED
O _i
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
Prepare the HSE Plan for Corporate office & Project Incharge & HSE
3. Preparation & Review
guide other sites. Officer
Prepare the Onsite Emergency plan for HSE- Officer (Corporate) Preparation & Review
4.
Corporate office & guide other project site
Prepare the HSE work Instructions for Corporate Management Preparation & Review
5. Representative
office & project site
Guide the project site regarding Environment Project Incharge & HSE
related matters. & to obtain the licenses from Review & Guide
10. Officer
the concerned state pollution control board.
Management Representative
CONTROLLED COPY
,
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOKA
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
Management Representative
Issued By e
MASTER COPY
. ONLY IF IN RED _.,
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHCJI(1
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
Follow up with the project site In charge / Plant HSE- Manager —Corporate /
3. Incharge / Toll Incharge & site HSE officer for Coordination and reporting
Project Incharge
environmental & safety legal compliance.
Guide site HSE officer for procuring of safety HSE- Manager —Corporate / Coordination, Guide and
6 Project Incharge reporting
personal protective equipment (PPE).
Prepare schedule for the safety week HSE- Manager —Corporate / Preparation, Coordination,
7. competition for various project sites & inform Project Incharge Guide and reporting
project sites for topic / theme.
Prepare HSE Internal Audit Schedule for project HSE- Manager —Corporate / Preparation, Coordination,
8. Project Incharge Guide and reporting
site & Inform the site in advance.
Follow up for compliance status of HSE Audit & HSE- Manager —Corporate / Coordination, Guide and
9. Project Incharge reporting
prepare report according to compliance
Follow up for Medical Examination Reports & HSE- Manager —Corporate / Coordination, Guide and
10. Project Incharge reporting
Completion, Prepare the Summary report
Management Representative
Issued By SIN ,
MASTER COPY
ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Issue Date:30"' July 2016 Rev. No.: 00 Revision Date: 30 m July 2016
Issue No: 01
INTERFACE AUTHORITY
SR. ACTIVITY WITH
NO.
Handling all the matters with the officials of the following department
a) State Pollution Control Board
b) Inspectorate of Building & Construction
c) Inspectorate of Explosive Discuss, guide &
1. d) National Highway Authority Guideline cell Report
e) Police Department Project
f) Hospitals & Ambulance Nearby Project area Incharge
k) District Emergency Control Room
Municipal corporation / Nagar Palika Fire Fighting Service station.
Guide the Project Manager in Environmental & safety related Legal Discuss, guide &
Project Report
2
. Matters Incharge
State Pollution Control Board
• Identify the list of Machines which needs the consent to operate
permission
• Verify the list of machines with Project Manager & Manager HSE
Corporate
• Application from to be first approved by HSE Manager Corporate Discuss, guide &
3. • Apply for first Consent to establish with prescribed fee structure. Report
Project
• After getting the consent to Establish,
Incharge
• Report the State pollution control board for stage wise installation
of Machines with pollution control equipment.
• According to Installation Strategy, Apply for the Consent to
Operate. With prescribed fee structure.
Follow up for the Consent to Operate Licenses
State Pollution Control Board
• After getting the Consent to operate. Make strategy for the
compliance of every clause given in the consent. Discuss, guide &
4. • Make action plan, consent to operate under water act Report
Project
• Give action plan for the compliance of consent clause to Manager
HSE — Corporate. Incharge
• After approving action plan, Submit to SPCB
Give the HSE awareness training to employee (contract employee on Discuss, guide &
card basis) after getting the formal information from the HR / Admin Project Report
5.
department. Incharge
Guide &
Daily safety observation tour, workplace monitoring, safety findings to Project Reporting
6. be recorded and informed to site project manager Incharge
Monthly HSE Report sending to be sent HSE- Corporate Manager Project Preparation and
7. Incharge communication
before 3"1 day of every month
Visit the site, Identify the unsafe condition & unsafe behaviors Project Guide &
8. .. Incharge Reporting
Record it in the Safety Observation Tour format,
Management Representative
Issued By
MASTER—COPY 14..
ONLY IF IN RED
„_.....
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Health, Safety and Environment Work Instructions
Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
Issue No: 01
INTERFACE
SR. ACTIVITY AUTHORITY
WITH
NO.
Report to Project Manager & HSE Manager Corporate
Plan for the Safety observation tour once in month, Safety Audit as per Conduct &
Project reporting
9. requirements and Report the finding to the Project Manager & Incharge
Manager HSE- Corporate
Project Conduct &
10. To Conduct the HSE Training on various working aspects. Incharge reporting
Conducting Safety Committee Meeting including preparation of Conduct &
agenda, near miss & accidents reports & forward to Corporate Office Project Report
11.
Incharge
before 3`d of every month.
Review and
In case of any accident happens on site immediate reporting to be
done to Project Incharge & Corporate Manager HSE, do the accident Project report
12. investigation & fill in the Accident Investigation format & send it to Incharge
Manager HSE Corporate within the 24 hours
Management Representative
Issued By
ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
Issue No: 01
Management Representative
Issued By
MASTER COPY
ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
Company and its SPV, EPC, Sub-contractors are governed by the various legislative rules and
regulation set by Ministry of Environment and Forest (MOEF) and concerned pollution control boards.
Applicable rules and regulation for road project
A. MOEF Requirement Road construction — EIA Report & Environment clearness from MOEF
D. The Water (Prevention & Control of pollution) Cess Act, 1977, including rules, 1978
H. Forest clearance for tree cutting (Local, State and Center if required)
K. Factory Act: 1948 (Crusher, HMP, RMC & CRMB) Plant Establishment.
Management Representative 1
f, —7,
Issued By MASTER COPY
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
The contents of the environment, safety and social reporting system have been designed to meet the
documentation requirements of above applicable Indian & International standards as applicable as
per prevalent law in India i.e. performance standards on social and environmental sustainability and
general environmental, health and safety guidelines of IFC performance standards as described below
Company has defined environmental management system as per the provisions of ISO 14001 and
OHSAS 18001. The developed system will help environmental and safety related as required by the
international standards.
Management Representative
CONTROLLED COPY
(1)
HOKABUILDCON LTD, ASHOKAHOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422011 ASHOM
1
W
=
:alth, Safety and Environment WorkInstructions
0
0
c. No. : WI/ CO/ DO/ PR/ HSE/ 11 REF. : QMS:8.2.2 / EMS6.1.3 / OHSAS:4.3.2 Pages: Pag,e 1 of 1
th th
W
O
...
z
Issue Date: 30 July 2016 Rev. No. : 00 Revision Date: 30 July 2016
I—
.
,
I
yes
'3
.7, cv
cu c
0
E
cv 4.,
-....3
3 •r:
ct 0
=
M 0
cu 72,
0.
Bc
4+ 01
= .....
in
C
b
U
0
,--;
E Z
t
.b
0
LI
.H)
>. >.
In 1
1
rNi
ns / Non-
Z
vl
U
t
0
T
.= , •
M
V)
U
t
t. 1 t. 1
"
8 I ni t
Z15
01 E
4/1
LI
tery year
ZZZ7E,70
>. >--
•
t
V)
't
na,
'1 .6
t
< E X
ZZ
V)
t
U
010
>. >.
-
le clause
W
ro
1_
W
ro
=
't
=
U
0
CY
>.-
Lri Di 22
CONTROLLED COPY
co, 1
:s to local
1...
X
Cl)
V)
0
U
>.
ko
Z
)._.
W
V)
0
U
,....
ts.
q:5
=
07)
(..)
o
m
ro
=
preparation
cy
>,
1
EZW1
MAST E RCOPY
Management Representative
ON LYIFI NRED
1-•
7
0)
al
M
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011
(1)
C
I
I
Health, Safety and Environment Work Instructions
Doc. No.: WI/CO/ DO/PR/HSE/ 12 REF.:QMS 7. 2 / EMS 7.2 &7.3/OHSAS 4.4.2 Pages: Page 1 of 3 '
th th
Issue No: 01 Issue Date: 30 Ju Rev. No.: 00 Revision Date: 30 July 2016
Title: Tra ining, Awareness a nd Competence
.
to
c
c
of
it
r.,>
Sr. No. Training Topic Project [ /
1 Labour
it
u..
I)
Supervisor
.
=
U
Operators Drivers
?,..
N
N
as
C
C
=
.X
C
.0
0
E
>
>-
>
X
> >
C
i'..r)-
f.,
0
>
>
E
>
>-
Response Plan
Environment & social
>
X
i7)
C
.0
0
E
>,
management plan
General Safety Rule
X
C
->
0
E
in
>
>.•
>
X
kO
>
in
X
>
C
.0
0
E
>-
N.
Fire Fighting
X
i.7)
C
0
E
>
CO C
RoadSafety & road barricading
..,c, . ic. , _c
>- ›.- >-•
CONTROLLED COPY
0
First Aid Box & its use
>
X X X
CC C
>
iii '05 i7)
> >
> > > >
>,
'-'
project site andHMP, WMM, RMC
>
X
>
Z
C
>
0
f,
in
>
> »»>
>-
Plant
rs's
Working at Height
X
-C
4E-'
i7)
Z
0
>-
Material Handling
X
.0
> >
0
E
in
t
>,..
r'l c
ElectricalSafety
.X
4C.'
.0
0
E
in
>-•
.
-C
4a. I
»»
»»
Et
CL
I—
LL
C.:
V.
C
<I
a
>
••••••
1-1
H
=
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 I ASHOM
Health, Safety a nd Environment Work Instructions
Doc. No. : WI/CO/ DO/ PR/ HSE/ 12 REF. : QMS 7. 2 / E MS7.2 & 7.3/OHSAS 4.4.2 Pages: Pal;e 2 of 3
th th
N
v-I
a)
z6
in
C
Issue Date: 30 July 2016 Rev. No. : 00 Revision DEate: 30 July 2016
Training Topic
a)
e4..
Project
0-
?:.
La bour /
en.: g
Departmental Supervisor Operators Drivers
Management Workers
Heads
uopn PuI S S'a
>
_c .c
E E
xx
ii) ii)
. --• (N
>
Response Plan
rn
GeneralSafety Rule
> > >
>
x x
Z Z
•:r.
>
> > > >
> > > >
> > > >
Li-)
>
>
>
Assessment a nd Control
>
Measures
ko
Fire Fighting
N.
Hazardous materia l ( MSDS)
CONTROLLED COPY
co
First Aid Box &its use
>
x x x x
zE EX
ii) iii i7) Cii
.c _. hc-T.. -F., --E ;F:
cA
> >
Estate a ndRMC Plant
Working at Height
:
6
>. >
Material Handling
c' 72, N
>> > >>>
>
Electrical Safety
>>> > >>>
>>> > >>>
V Iv
x x x x
.-E --E
ai FA i7) i7)
X x zE
c'E"'E' t
o o o o
13 I Defensive Driving
>>> > >>>>
. >. )..
M- -
ON LYI FI NRED
(..---Th
ASH
a
SH OKABUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKANAGAR, NASHIK - 422011 OM
x.
lealth, Safety and Environment Work Instructions
•
LI
)oc. No. : WI/ CO/ DO/ PR/HSE/ 12 REF. : QMS 7.2 / EMS7.2 &7.3/OHSAS4.4.2 Pages: Page 3 of 3
th th
in
m
cu
...,
6
4
c.
Issue Date:30 July 2016 Rev. No. : 00 Revision Da te: 30 July 2016
1—
itle: Training, Awareness andCompetence
..-4
-Ts
E, S&SInduction V
Emergency Preparedness a nd
-T.,
tN
--fr
dica
->
..).
.>
>
Six Mo
›..
Response Plan
.x
vi
*->
.>
..>
01
>
)...
.x
cr
--fr
v)
..>
Ecc
->
oo
>
EZ
›,..
LII
v)
--fr
---fr
-C
.>
.>
)..
Assessment andControlMeasures
.x
-P.,
1/4/0
*.>
->
Fire Fighting
),...
-c
00
--fr
..>
cc
'>.
.>
>
)...
CONTROLLED COPY
Accident Prevention at Corporate
E
v) U1 V)
cm
.xx
C
'.>
.>
>
o0o0
>
›,.
EXZE
office
.x
to
o
f,
->
->
>.
ElectricalSafety
z(NJ
-c
> >
->
cc
.>
.>
> >
)...
13 Defensive Driving
XIS
4I
Management Representative
Agpanssi
CL
O
cn
W
X
cu
C
a-,
8
a)
C
15- 20Years
Sr. Manager / DH
o. -a
4-, '5
c cr
10 - 15Years
1: ci
(1) Z
- Knowledge of Construction Safety
- Knowledge of Emergency preparedness plan - Tra inings to Site sta ff for safety culture
Establish Safe Site visit for implementation
.--,
- Knowledge of Accident Investigation - Reduction in own employee a ccident
Working culture of safety culture
- Knowledge of QMS, EMS, OHSAS & GHGStandards - Accident Investigation
(NJ
Compliance of related acts regulations
Site legal req uirement
- Conduct meetings for legal compliance
Prepare a nd submit
Management - Data Collection a nd preparation of monthly a nd quarterly
en
monthly reports to - Submission of Mont hly reports
Reporti ng reports
Management
CONTROLLED COPY
Ensure complia nce to
systems a nd processes in
Process & - Awareness of latest rules & regulation related to safety & - Motivation of employee throughHSE
the respective area in
•zr
System environment award
order to deliver to
Orientation - Conducting safety ca mpaign
customer and ma rket
Req uirements.
Bui ldknowledge in niche
Innovation areas, brea kthrough - Awa reness of various construction related safety techniques.
in
- Adopting new techniques
Orientation innovations a nd competitive - Awareness of new software's.
knowledge
0
U
ASHOKACONCESSION LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKANAGAR, NASHIK — 422 0 11
1
Health, Safety and Environment WorkInstructions
Doc. No. : WI/ CO/DO/PR/ H SE/ 13 REF. : QM S 7.2 & 7.3/ E MS7.2 &7. 3 / OHSAS 4.4.2 Pages: 2 of 2
m th
Issue No: 01 Issue Date: 30 July 2016 Rev. No. : 00 Revision Date: 30 July 2016
(7)
C
O
HSE Off icer (Corporate / Site)
CO'
:is a
th
Competency Defin ition Knowledge/ Skil ls Application
i6 Z
Collection of Monthly
Knowledge of Hazard Identification &RiskAssessment - Preparation of monthly report
Site Safety Data, follow up with Site
Knowledge of Environmental Aspect & Impact - Improvement in site safety
Monitoring safety officers,
.
Knowledge of Legal regulations, IRC, EMS, OHSAS Road safety awareness
Standard
r.)
implementation of safety
Working culture Knowledge of Accident Investigation req uirement
culture
Knowledge of Q MS, EMS, OHSAS &GHG - Reduction in own employee accident
CONTROLLED COPY
Trained the employees
Emergency
and - Ensure emergency preparedness at
Preparedness a t Knowledge of Emergency preparedness plan a nd
m
Handle emergency Corporate offi ce a nd site
Site &Corpora te Emergency handling
Office situation at Corporate
Office & site
Ma nagement Representative
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011
Communication: d
management shall ensure that appropriate communication processes are established within the Department an
Top
that communication take place regarding the effectiveness of the Integrated Management System.
With regards to Integrated Management System, the department shall established, implement and maintain a
procedure(s) for:
Internal communication among the various levels and function of the department.
a) Communication with contractors and other visitors to the work place.
b) Receiving, Documenting and responding to relevant communication from external interested parties.
c) element
ge of information is a key
exchanution
An effective and formal process to ensure the proper flow and HSE exec
to any well-managed organization. It is particularly critical to ition, the
n. In addsure
communicating expectations, performance and risk throughout the organizati successful HSE
d help en
will
organization's ability to effectively communicate and involve the workforce
programs and culture.
ternal
Both internal and external communication channels must be effectively established. In ternal stakeholders
engage key
communication is critical to success. A sound and consistent process to
will ensure the accuracy and effectiveness of external communication.
External Communication:
Autho
HSE Department's External Customer are National Safety Council, National Highway
1. and External Au
roval of concerned project Incharge/ project
All External communication should be carried out after the app
2.
director.
3. The Acknowledgment copy of External communication (soft or hard) should be kept properly at site.
Management Representative
MASTER COPY
Issued By
CONTROLLED COPY
eN
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASH %,, M
Health, Safety and Environment Work Instructions
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
-.• Consultation where there are any changes that affect their Department.
b) Working shall be informed about their participation arrangements, including who is their representative(s)
in HSE matters.
c) Consultation with contractors where there are changes that affects their HSE Management System.
d) The Department shall ensure that, when appropriate, relevant external interested parties are consulted
about pertinent HSE matters.
1) HSE Department should plan HSE meeting at project site which have a pre-planned agenda.
2) Each Departmental Heads are committee member of HSE Committee and Every month site HSE
i Officer is conducting HSE Committee meeting and discussing HSE issue in meeting.
ioi
Management Representative
MASTER COPY
Issued By ONLY IF IN RE
1
CONTROLLED COPY
L..,itl
rl 1 I 1 i 1 1 i 1 1r, I ,
N i
.t. t t
aa- l i i
1"I
pi.. 1 . 4 .
4 .14 4/ .
. 4/ .
4/ !/
. I/
_ I/ !I
. i 4 '4 PI h
1 V V V V V V V V V V V V V 10 V
1
itEU..2 g g g g z g
I 11 i-- )"
I
% a ii k8 /8 00 0!, 3E i
111 t 31 1
Rg 3 8g 312, gsgAtxt 1 ti
8s WV 11 l 1; l la 'Al
l ;I Id III III III Ill lifilil
a
F 1! 'II ! 21 I E E 1 IX I
H it
sil q V li 1 1 :i 1 la
.r la
sF 4k !
.El
2
gi
1 11
9 1 ! li I I§ 1! i 1 1 ti 1 i?
le
a8 it ff il 2 1 - it q 3 ii
`i'l
'E
lc Ei -5 15-
2 " ill " ri 9 li 1 fi -la Oa i 1 0 s
ifs Vs 01 ;5 ! Ef i 1 I2 i e fi li 1!
F8 tl ' vi 1 : !?; 82F2 01
1 ill !V 01 .1 i gg t4' !) t1t .11 2v t z 11 13
11 '14 i8§ 411 11 i 1; 18 11 I ;ii :41 l i 44 If u
1 1: i31 It' ''''' Vil si tk 1 ii8 ii8 . 1-1 P
?il 04 ii h ?ft I. .N rig. s.P. ?.g1 11
?/ 1U ftE Al il l At :In .=1.5 itZ 'i,T1 !ar 10 II
ri l
2 E
Rvf_Sitect! Rilk
I
51 7,
b
S
-- 1 7,
Z
4lawdliaiii.
&
c
V
I
5
; :,
I;
.. . .. Pol M II P• (4 no . . M M PI o•
1
:
E
;;"..
. . .• PI M . PI ro PI 0 PI P• M /, a M
g ki
i %
( Unlikely event that (Describe the errect of unlikely
1 1 i
*I 11 14 i
8 !I „ tlig '1
Consequences of the risk
31 1 itli 11 i t_ h s! il b
3k 1 0 13 ' ,
departmental Process)1
)'6 Y2 v
a ); ?
I isl h "i 4 11 PI i .511 '"Ti 0 1! 1 °I
!''t DE 1 •E•n 5 r§ 1*! iii" li; li ii 3 P3
"1 !It 1 1- 1 ,1 ! ,31 IA I§Z iv. I. EA
11 -6,„ !1
event)
b k ; 1 0 gg1 f l 1v 1
1 I 1 1 i IP fi 2 1 t k
,
can a ffect the
po wrong
.1
- ; a- : ; I- $, ; i, : ,, t• ; : t.,
4
Enviecilwnentai)
..
1 i i i
Category of
/ I Ila
( tee-il. m..
i 1
Revenue,
Machine,
Material,
Method,
OHS.
Risk
- r I I 1 i I ii
CONTROLLED COPY
0
8
2
-
-
Measura ble
's
1!
Consequences of the ris k
i
indicator
01
Description of key controls Residual risk
11
( Desetrbe the e ffect of unlikely
( ac tivity
1
or, ecr ive and preventive actions) level ( Y/ N)
n
Ng.
18
:e27
0
event)
.iy..
Nif 4091
I;
reen acting
Ill
E..,
-'
41•
ii...
1141
hil
!Ili
1 ;.1
lifilfi
°
(S q)13..dUn
'
report)
—i
meslx
z i-.-
nil'
41
i15-i
- 54 i.
W000.0,111.411
x 10
boll•J Nsls luwagul
13
'''
2
`' V.
'' ,
n
O.
(1/14/14)1.2*1 OP 11.6A0 $2
'
1
'
.
legal nonce / non-comphance letter
1 9
t
-
"
?
•
horn concerned autronbes reputing
5
.
:
;
1J g
2
rl
/i
•
1E
.1
il
li
I;
closmg, penalty etc
'q ..
---
DI
ililg
ill
legal requirements are notfulfilled as
-gt?•-•
1,.°V7-
pf f
6 11W
E
..
6
N
n
perapolsater legal rules and
t
2-
ht011
11.5s.=g-
EWit
. vial
In
idail
Ei
Witi;
nri.
regulations il
iql!!
2_
!I
ni
Root cause analySn inertiabe prepare with helpof MillbOne
4
V.
analysis method, why-why analysis. eye witness etc. Corrective
1
a.
i
N
T
n
i
Bi
2
i
831i
2
actions to be suggested and implemented to avoel
h
Uh
"i
: 6. I
.1VOCCUITDICe.
I
f
31
}}yy
S
$g
f
N
7.
n
1
to
II
2
,
fo
; g NI !.-p if
1
zit
I;
111.
!!'
Ph
g 611
-
gi4?.
1
"' -
s
igbi 21
V-Ilig
M 34 h
illaq
4102
(Marl study of each process for Alhazards lo be done. Every
0: li 1
..
i
Z
R,
i
z ; "li
11
v
4
-
b
is
; 11 hli li
ii
1
AtA
Lgt.1 '
ii
l
.z.
E
No improvement in IsSE performance at
i_
g:
i
m
n
i
fi
.2-
il
li
Drolect Nor
X
to be taken and recommendfor implementabon in consultation
8.
III
1 hi ;11 111 il ip 1
web protect recharge
i
1
oe
M I
gl
ii
„
'' 1
i°
3
,
No Improvement or 150 performance at tI CEOfficer mustbe supportedtry andepartments. Any safety
-
ig t
m
n
th
2-
s
project See
E
'related work must be done in tonsil/tabor) with MaOfficer.
d
II
011
h
?
i,
;MAY
nq
s l il g
OilIii
ti?
6
ifi l 1
1
.4,
-at
11
oi
Rat of noperswe indents / accrdents
."
-..
'Altoggesoons must be commentatedto concern ermines
:il
1p8_ - w
N
n
2-
'
1§
111)1
fi
' bti 4,
.. .
.1-
l'
MAt
7.
I
m
n
No Continual Improvement orIMS
2
i
6,E:
2
;i
i4.
1
8-
gi
,
0
11
*stem
vi
EEO
1
Iii
.
?Z
!
0
CONTROLLED COPY
1 is 1
•^
!till
t*-8P
i.c li
t i ll
t.gni
11!;!,
Compliance Of Internal
m
"EgRC
NIL
lin
liei
,!,1, up_
..
x'.
II/0
.2
et
l
5
'
•
t.
t t- vq -....0...
imi
2.g. l
WO
2
ilitg i/ iW
1
a
O
Is.
N
t
10.
t
R.
IN
3
et
2
£
Eg
*
:1
2
1g
,i1
8.
!II
04
III
igi
Wlfiil g
°
2
l0
Eli
gi g i g i thg
1,,tat.1
ew
sclis,§8-05
I
.
a
1
1
'
t.,12
5
511
I
NI
Iii
s-e
31?
'PE
t.
2
1
4
'
A
g
1
g
Z.
§
Z
2
13
4 sg 2s q?'
dt O
FO
it
z
in
PI
;
A
At
it
li
MaNg
!
"1
iy01
1131W2
1
t
i
I
Pt
-g.i tfp,fgz
I
tg
n
Si
!ilg
z
I;
fh ii li
IE
E
62
! li
ti
MI
il
li
MAST-ER
ONLY-I F I
=
Z
O
f
v
;ct
0
Q
N
Z
Q
S
N
S
I
0
0_
c.)
8
0
sY
O
Q.
ro
a.
to
41
Of
co
0
a)
0
‘.0
ri .c
O
:
J
8
a)
O
z
N
O
>.
•
z8
3
to
E
3
N
C
ro
C
a)
dl
•6• 0 a
g
0
uJ 0 a,
a)
4.,
0
RISK RATING
..:
•
4
.-
Dept/ Area
Z•
Hazard Sign ifi cance Contro l / Remark / SOP ControlMeasures /
In Z
41)
a.
_v ru
irt 3
References
Fire prevention & control
....
o
N
ir
2
!DieselStore Yard
01
in > a,
el
Low SOP No. 33
orocedures
E lectric shockdue the current
N
vr
Store
IN
Computer Operating
N
leakage Low
M
o
X
t)
IL
c
a)
2
.-
6
o
en
co
STORAGE DI ESEL
TI
In
Low SOPNo.21
TRAN SPORTING - InternalTruck
Nr
V
Store
M
tl,
Trap / engulfment Moderate SOP No. 30
&dumper
e
o
V1
co
Nr
E
SHUTTERING stacking Q. LOW
c
V) W
Store 'Cement Bag Stacking
ol
Low
0)
E E
tt
NNN
Consuma ble Items Stacking
INMen
--, --,--...
01
Low
00
Store
to o co
Waste OilSeparation & Storing
4,1
In
Fire / explosion Low SOPNo. 34
VI
ON
Eo
M
Pi
a%
Office work - Office chair & ta ble Back pain
Low SOPNo. 02
be used
Office work - Contionous Visualdefect - Ra d iation Ergonomica lly the chair should
•-•
0
Store
an
In
VI
working on Computer Low SOP No. 38
Hazard be used
Use of Chemical Maskfor During
.-•
.-.
CO
5
U
a
N
ko
Testing, usage of chemicals
In
Inhalation of gases/ vapors Low
the Working
material Handing &Testing of!
,•-•
N
CO
5
U
a
N
kr)
PI
Han d ling of cubes fall of objects SOP No. 03
Cube Procedure
Use of Proper PPE ( Dust mask,
•••-•
M
Q. C. LAB
ko
N
Aggregate Test / SoilTest
C•1
Exposure of Dust Low
Goggle )
Use of Chemical Maskfor During
.-4
ti
CO
5
U
N
ko
( Bitumen Test
6.
Exposure of Gaseous Low
the Working
CONTROLLED COPY
mya
.I
Q. C. LAB ( Sampling
Collection from side Trap / Struck / fallhazard N
Low
v.
v.
Q. C. LAB
N
to ko
r's
CO
v.
5
N
U
‘.0
a
Working on the CBR Machine m m m Low .
Vibration muffif needs )
Heating of Chemical & material
CO
...
CO
5
U
a
N
to
•••••
0,
CO
5
U
a
Flamma ble Chemicals in
m
m
a+
k•
N N
sr
ca
E
N
a=
a'
N rn
N m
Visualdefect - Radiation
CV
M
ok
HR & Admn.
ft')
SOPNo. 38
OZ
c>73---
CC
CW
O
.6
.
iE, ASHOKA MARG, NASHIK - 422009 IASH OKA
(J)
...
U
r.
z
[ REF.: OHSAS4.3.1 'Pages :Page 1 of 4
I
o: 01 [ Issue Date: 30th July 2016'Rev. No. : 001Revision Date : 30th July 2016
Traveling Outside During the
cr
t-V
HR & Admn.
1/40
m
N
Struckhazard Low
Out duty
CV
ifs
ev
%0
Canteen
m
!Cooking (Lecage of Gas) !Fire Hazard Llow
Use of Proper PEP ( Ear plug / I
CV
1/40
P&M
en
Running of DG Set
C*1
0
0.
-J
Exposure of High Noise
PI
01
muff if needs )
rs
CV
cO
Z
Nr
Ct.
en
r
2 2
(working at height
z z
6 6
'FallHazard
N
Moderate
1/1
Working at Height
Slip, Trips &falls, electric
Safe Working Procedures for E
CV
CO
cO
o.
Z
(V
•
m
Electrical maintenance shock from electrically Moderate SOPNo.24
lectricalWork
operated machines
Minor injury while working
cz$
a
Z
0
Maintenance of machines
'CrN
SOPNo. 10
with un guarded machines
Training given to Driver By
Vehicle movement ( Truck, NSC Film & General
Serious accident while the 1
Z
ot
o.
0
CV
.-,
m
Dumper, Excvator, Ea rth movers Moderate SOP No. 16 Discussion, Also to Reduce the
movement
Accident Rate Award procdures
strat in Ashoka
!Material handling Loading /
P& M
0
Falling of material,
N
SOPNo.03
Unloading Process
CU
I TTINGAND WELDING ZARD U SEOFPPE'SWELDING
a
*11
M
OPERATION FIRE HA Low SOPNo.23
GLASS , HANDGLOVES,
CUTTI NG AND WELDING USEOF PPE'SWELDING
P &M
M
Electric Shock
OPERATION Low SOPNo.27
IGLASS , HAND GLOVES,
INSATALLATION OF SYSTEM & E
N
lectric Shock Low
MAINTENANCE
1
Visual defect - Radiation
N
PROGRA MMING / SUPPORT Low
Hazard
MSDSAREAVAILABLEWITH!
N
REFILLING OF INK IN CARTAGE EX POSUREOF INK
Low
HSE &I
T
HIT HAZARD DUE TO FLYING USE OF PPE'S WELDING'
0%
en
DRILLING
..J
m
0
SOPNo. 12
OBJECT
GLASS , HA NDGLOVES.
U SEOFPPE'S WELDING
CONTROLLED COPY
HIT HAZARD DUE TO FLYING
en
Quarry BLASTI NG
-.4
Cr.
M
0
MPI
Vehicle movement ( Truck,
[Serious accident while the
0,
v
CV
Quarry
.-•
er
p
z
Nr
2
0
Quarry
m
cr
CRUSHER I Primary Crushing
—I
Ny 1/40
TRAP / ENGULFMENT —
slr
.-• ry
IN ry
k0
CRUSHER Crushing
en m
7
in
CRUSHER
m
cr,
Conveyor Belt
rn
Low SOPNo. 20
_ FROM HEIGHT CRUSHER SAFETY MANUAL
'.0
ry
CRU SHER
1/40
m m
OD
a.
I
ASHOKA BUILDCON LIMITED, ASHOKAHOUSE, ASHOKA MARG, NASHIK -422009 ASHOKA
Health, Safety & Environment ( HSE) WorkInstructions
Doc. No. : WI/ CO/ DO/PR/ HSE/ 17 REF. : OHSAS 4.3.1 Pa •es :Page 1 o
Il Issue Date: 30th July 2016 'Rev. No. : 00 Revision Date : 30thJuly 2016
Driving of Dumper, JCB, Serious accident while the
V
a-
m
CL
Licc.1
^'
Li,
Cr
ry
..,
U
L.
Z
as
CI
a)
.8
Ill
2
SOP No. 15,16
Excavator 'movement
( HAZARD REMOVED BY CRUSHER SAFETY MANUAL
CC
cc
W
uJ
=
kt)
ry
in
U
3
0
In
FLY WHEEL TRAP IN WHEEL INSTALINGTHE MACHINE
I
GUARD
Nr
CRUSHER
Driving of Dumper, JCB, 'Serious accident while the
in
cr
ry
iv
0..
el
co)
%.0
2
.8
CRUSHE R
,
ci
0
Excavator movement
ENSUREELECTRICAL POWER IS
MAINTENANCE : EL ECTRICAL ISOLATED WHEREPRACTICABLE DURING
CV
iii
3
8
CRUSHE R
PI
3
V)
HAZARD -GENERAL THE MAINTENANCE : OHSMPNo. 1(
PPE)
'''
E
-g
CRUSHER'Working on Crusher Exposure of Dust
D,
I 2
PI ev
,.., %r
Sr CV
.P. 3
Milling machine
2
Scrachfor exiting road object from machine
CRANESOR LIFTINGDEVICE
MAINTENANCE : CRUSHER PART SMUSTBE
LA
3
%1,
IN
01
CRUSHE R CAPABLE OF LIFTING THERELEVENT
3
LIFTING PARTS FALLI NG
PARTS, CRANE HOOKS MUST BEFIND
LA
USEOFPROPER REFLECTIVE JACKET&
WORKING ALONG THE ROAD
2
CV
vo
3
SURVEY
01
-J
o
STRUCK HAZARD HELMET , ALSO PROPER INFORMATION
SIDE BOARDALSODISPLAYOHSMP No.1
LA
SLIPS TRIPS AND FALLSFRON WORK PLACEMONITORING SHOULDBE
•,10
.../
N
01
3
Ni
SU RVEY
o
'STRUCK HAZARD
ROAD DONEBEFORESTART THE WORK
,
T
LLJ
CV
ry
7
'TREE CU TING FALL ING / ENULFMENT Low
STRUCK HAZARD /TRAP
sr
c3-1 53
WI
IN
< <
0 CY
IN
WOODTRANSPORATION Low
HAZARD
EQA Excavation V- V Low I SOPNO. 9
73 X0
r4 rq
to
(cs
to
a ip.
cr
E XCAVATION
a;
LLJ WI
iE
i.7) g x
2
R
o o
CV CV IN
.J -J
33
'Concerting
LJJ
CONTROLLED COPY
S
<< <
a+
fn
[ Loading/unloading of cements Ni 01
CY CY 0'
Inhalation of dust partides Low
Falling of person under the
23
UJ
<
et
3
MI
Ni
o
-I
0'
2
0
requnnq first a id
23
EQA Shuttering !Trap hazard Low
UJ
N.
<
•.".
d
cr
0'
C
a
a
Low I
EQA Shifting Material 'Machin Brea kdown L Low I
,.
o
3
Concreting
.C1
-.1
UJ
>
c
23 F.,3 R
.-7, iz
<<
sr st V- sr sr
as
ry CV ry 04 04
IN Ni CV CV Ni
0'
Low
ag
I
safety belt / safety helmet /
CV
CV
EQA
-J
O
<
2
eu
Ji
buixybuiplomebsl
EQA
J ..J ..J
g 33
_...,
UJ
>
a
<
sr V , V VD se,
N. P: N. X g2
IN CV CV
8
—
In IN In Cn
0'
ce Z
Ox
LI `'
Roads Accidents
0.. 1.1
Low
}3
I
[
ASHOKA BU1LDCON LIMITED, ASHOKA HOUSE, ASHOKA MARG, NASHI K - 4 22009 ASHOK/I
Hea lth, Safety & Environment (HSE) WorkInstructions
Doc. No.:W I/CO/DO/ PR/ HSE/ 17 rR EF. : OHSAS4.3.1 ] Pages :Page 1 of 4
0.0
VI
z
0
-.
Issue Date: 30thJuly 2016Rev. No.: 00 Revision Date : 30th July 2016
Fixing for wood box with nut
w
c
13
Q
7:0
N.
CY
..0
4.0
NJ
.0
0
<
4,
U
J
[RE - Wallfixing
bolts & supports wooden bathes.
Provide fire Extinguisher site
N.
N.
N/
V
NJ
EQ A , H.D.P Pipe work waterline Fire Low
security.
Fire ( Due to static Electricity
CO
N.
(-.4
'0
HOT MIX PLANT
In
' Bitumen unloading Low
Fire ( Due to the over heating
N.
Cr,
'0
en
NJ
0
HOT MIX PLANT Bitumen Heating in the tank
&leakage ))
Short circuit due electrical
CO
CO
V
NJ
3
HOT MIX PLANT ' Supply of E lectrical energy
appliances
Inspection &Routine
CO
V
NI
HOT MIX PLANT Falling from Height Low SOPNO. 5
'Ma intenance
O CO
c
X
CO
2
V-
—/
0
NI
COCOJ
0
0
t)
cr
HOT MIX PLANT Exposure of Heat
OD
.41-
NO
eN
—0
PI
0
LABORATORY TEST SOILDENSITYGUAGE RADIATION ( NOT Machine)
CO
CV
V
—0
NJ
0
LABORATORY SOILTESTING [AFECT HUMAN BODY
CONTROLLED COPY
•
f
0
rs,
Q
z
0
•6
2
0
O
N
O
N
a
LU
ti
.c
O
6
z
N
0
z
0
al ro
T
3
CU
•to
1:4
••
(1J
1.4
UJ
a)
"O.
8O
ro
CJ
na
LL
O
5
LL
C
10
T..
1Z
O.
Significance ControlMeasures
C..)
E
..t
tu
4
•:.-4.
t
...
X
IL
X
03
0
0
Sr. No. Dept/ Area
0.
c
- ---. 2
1
C C
O
Ca
ILI
4
0
‘.,)
i5 •
All offices and Generation of Wastewater & Land
0
v.
v.
z
•-•
N
N
...
1
Low
-
Sanitary, Floor washings etc.
sites washings Contamination
Land
•-•
•-•
.1
.-•
v.
Z
<
0
1
N
Offices/sites Damage of ca ble wire Generation of solid waste
Contamination
Domestic waste water Land
v.
v.
v.
0
N
cn
1
N
All Offices/sites FreshWater consumption Low
generation Contamination
All Offices and Depletion of I
v.
v.
•-•
.4.
.-.
•-•
<
..
1
Paper consumption SolidWaste generation Low SOP/C0/00/PR/HSE/44
sites resources
All Offices and Conservation of natural Depletion of
4.1
v.
v.
•-•
Lrf
Z
•-•
<
1
Consumption of Electricity. Low
sites resources resources
P
Tree cutting loss of trees Air Pollution High (Plan for Planation
Ni .-•
>- 1
v. v.
4 4
UJ 11.)
ZZ
N N
r...
N
Low
sr, r,
0 0
Excavation Generation of dust Noise anddust
Deep excavation below 3 AP and 0 and HS
-/
Z
v.
v.
-• 0 0 0
0
CO
N
..
EQA Exposure to high noise
meters__ -
Z
ri
--.
v.
v.
PI
U.1
4
-.
CA
Excavation with excess soil Disposal of arising Loss of Agri. Land Moderate SOP/CO/DO/PRAISE/42
0'
Hot work - handling of Fire - due to improper AP and 0 and HS
›
Col
4.
M
LU
0
...
g
0
....
0'
.
IN
Z
Z
v.
.4
N
.-•
•-•
..
Low SOP/CO/ DO/ PR/HSE/44
Z
metaLwhile weldino
Quarry Grit / sandblasting Dust hazarddue to sand Air Pollution
Z
Z
•-•
v.
0
.1
r4
-1
N
N
Low
blasting
-•
in
Land
•-•
-J
0
Z
Z
v.
v.
v.
sr
e.
.-•
EQA Concreting Concrete residues and wastes SOP /CO/DO/ PR /HSE /41
Contamination
( Dust while handling
CV
v.
Z
Z
v.
v.
0
N
<
crl
4
.•
Concreting AP and0 andHS Low SOP /CO/DO/PR / HSE /41
CONTROLLED COPY
Z
aggregates cement dust
Land
N
--J
Z
Z
v.
v.
<
N
.-.
‘0
..
(EQA Concreting • Concrete residues and wastes SOP /CO/DO/ PR /HSE /41
Contamination
Ill
•
0 0
'40
v.
v.
)13
-1
Z
Z
tr)
IN
N.
N
<
0
..
.
8
Fuse of fresh water
0
Hydro testing
Loss of forest / green cover Gen. Environment [
NI
v.
0 0 •-•
Z
Z
.-,
N
<
.1
CO
.-.
EQA Denudation of forest Low
Demolition / Dismantling of Dust while hand ling muck Air Pollution
V
NJ
Z
›.
v.
•-•
0
N
0,
•-•
IEQA High (SOP /CO/00/PR /HSE / 41
Structures
Loss of forest / green cover Gen. Environment
-J
.--.
—1
Z
•-•
•-•
0
v.
v.
(NI
LU
<
0
Tree Cutting
0 ,
Excavation in shoulder Generation of dust Air Pollution Before Excavation the land
NC
-I
....
Z
Z
v.
LU
.1
<
NJ
N
•-•
0
will be wetted by water
,
(
122— Excavation with excess soil Disposal of arising Loss of Agri.Land
.--.
Z
v.
v.
•-•
Z
<
-.
...
EQA 5 17 &CUT)frae
Excavation in HR / SR - Generation of Air emissions Air Pollution
z
er
ai
....
Z
Z
v.
X8.
.-•
0
<
LC)
4
N
C•1
r..1
i„;
CY
c•
m0,
tv
O
N
tj
0.
O
O
O
O
aJ U)
O.
re
1/40
z
0
8
6
8
0
0
z
C
to
a
"a
Dust hazard due to blasting Air Pollution Before Excavation the land
01
>-
V
UJ
.....
fsi
Z
<
.-•
0
v.
N
0'
Moderate will be wetted by water
sprinkling
Shuttering - Hot work - Fire - due to improper AP and 0 and HS
CV
UJ
.-4
<
Z
....
Ul
0
v.
UJ
<
_,
el
C.1
0'
handling of oxyacetylene / handling of oxy acetylene /
I PC; wpIrlinn rvlinripm PG weldinn rvlinderc
Shuttering - Hot work - fall SolidWaste
LLJ
Up
IN
1.4
<
Z
Z
o
....
v.
<
t`s1
...
Meta llic solid waste
J
0'
of molten metal while SOP/CO/DO/PR/ HSE/44
weldinn 00
Storage of petroleum product -
r4
N.
>-
>-
eNj
0
IN
v.
.-.
EQA
..
Storage of petroleum Low SOP /CO/DO/PR /HSE /43
(CI
C
o
3a
...5g
Spillage &Leakage
Emission from motor vehicle Air Pollution
>-
CO
CV
IN
eN
o
v.
4.
.-.
EQA Gases by Exhaust & Noise Low
Land
(9.4
Z
Z
IN
ON
CO
r...j
<
IN
.-.
o
EQA Bituminous work SolidWaste generation Low SOP/CO/DO/PR/HSE/44 I
Contamination
el
>-
—
0
v.
.-•
•-•
0
EDP / IT E lectrical Wire • Waste Generation of solid waste
..
Low
rU
C
C
0
RoadPainting / Routine Generation of non L
••••
..-,
iNj
Z
Z
.-.
.-•
el
r•I
-
SOP/CO/DO/ PR/ FISE/44 I
(0
C
0
"Ecffc
3 83 8
Painting biodegrada ble waste
., .
AP and 0 andHS
Cs4
.-4
IN
Z
Z
v.
s.
<
IN
(V
in
IN
v.
*.
Laboratory gradation Generation of Dust 'Air Pollution
Land JJ
V
en in en
.-4
1,4
Z Z
Z Z
IN
v.
4.
< <
0 0
Laboratory
000
Bituminous & contract test Generation of solid waste 1 11 • 111. el
..-6
I§
3
Asphalt(Nuclear Density CV
>-
Z
•-•
v.
r•J
111
0
m
.-.
1/40
CV
>-
Z
v.
1,4
m
v.
0
9-,
>-
N.
CV
m
v.
a.
(N1
0
Laboratory ( Nuclear Density Moisture Generation of Ra d iation
Gauae) ENSUREPPE'S [Training
CONTROLLED COPY
Soil Air Pollution
>-
CO
Z
....
IN
r4
m
v.
0
..
>-
ON
Z
v.
vv.
.-.
el
IN
0
It
Z
Z
•-•
c,
IN
v.
v.
<
0
IN
94-
....
Z
Z
.-I
(V
v.
v.
<
r.1
Cr
>-
C
eo
IN
CV
8iii
1-N1
...i
v.
.-.
cr
s.
Z*
0
ro
eci
>-
C
1,4
C.4
....
Z Z
v.
I'
0 0 0
v.
a M
rl
Flying of stone
C71
resources
...
Depletion of
<
Nr
>-
V
CNI
4...
Z
.-.
0
..
"I
01-5ac
i... •E
otz
Z
2p
E-6
1Q_
•
•
v.
S
Q
O
O
O
re
tN
fN
O
0
0
:
C
111
E
Q .2
df
2
0)
C
C
0 .cs
.L•
0
0)
cc
U)
•:
cc
cc
O
0
8
0
U
)
IN
Depletion of SOP/DO/CO/ PR/ HSE /45 /
cC
5-
5-
ce
Q
1.11
.4
.4
IN
D
Crushing Utilization ofFuel I
oi
resources EMP No.1
Tr
c4
5-
4-4
1r5
C
5-
4-4
.d
'''
r41
Cr
0
D
U
cd Generation Dust Air Pollution High I
IN fN
Wastage ofbolder / stone Depletion of Reuse at our road
cC
.a•
CV
..4
Z
Z
44.
IN
411 1/1 V)
11.1 LU Ill
0 0 0
0
D
Crushing Low
I I I
due to Nilo resources construction
a-
CO
44.4
Z
444
IN
0
C11
Hot Mix Plant Heating of Bitumen 0
1
Energy resources -1 place & During preventive
Maintenance scheduled, the
pipe line is always revamp
Depletion of
Z
Z
4N
4-.
.4
C
("41
01
0
Hot Mix Plant , Unloading of Bitumen / HSD Spillage ofBitumen / HSD Low
resources
During preventive
Transfer ofBitumen &
Maintenance scheduled,
5-
c0
tN
<
eN
-/
0
4-1
in
-.
0
0
CO
4-•
5-
4-4
4-4
iN
IN
<
0
0
U)
-1
5-
4-.
4-4
Z
et/
tN1
In
rn
Hot Mix Plant Moderate
BM & BC Layer, In process
(0
(.2
-0
3
u
Running ofBag House Generation ofDust use, After completion if road
Z
4-4
4-4
in
11,1
in
Hot Mix Plant Moderate
111
X
Z
-4
•-•
IN
<
•-
Low
Waste Dry Material Land contamination LandPollution premises road.
Stop the HMP, Replace the
CONTROLLED COPY
Bag house not working / Bag
5-
CO
444.
4444
0
<
U1
U1
Running of Bag House Moderate Bag as per Bag house Work
111
burst
Instruction
Discharge of BM Product to
Spillage due to overflow from Land
4-I
4-4
1D
Z
c0
rol
tN
0
<
1f1
<
ce
t\
5
`tr
C
C
IA
5-
cc
....:
mi
rO
C
Q.,
'5
m
CN
>
CV
i:U
-0
4-4
t...
to.
.0
o
Z
"6
4,
2
.3
u,
o
ci
0,
1/1
in
Land acquisition
01
01
I
GJ
00
z
>,
C
co
N C
w
C
4)
Cl
4)
a
•
•
CC
8
(1)
U)
0
0
O
ry
CC
0
go
42.1
O
2
U)
0
v,
0.1
••
0 f: t.;
Q.
Lu
ce
U.
otf O
U1
0 a
01
(0
ai
ai
0
6
00
zz
ct
0
8
U) C)
rn
0
rn
O
to
z
a)
lf)
0
a)
C
C
E
n or ana ion, re as
been taken at planning
stage through design
co
in
—
Road widening
CO
>-
Tree cutting in Forest area
....
sr
<
IN
IN
Natural
Resource
...
±
0
O•
options to reduce the
Loss of vegetation number of trees that may be
felled.
an or ana on, re as
been taken at planning
stage through design
as
L/1
....
Road widening
CD
>-
CSI
Tree cutting in Forest area
<
IN
....
sr
Natural
-..
.c
Resource ±
0•
options to reduce the
Loss offlora &fauna number of trees that may be
felled.
ce
sa
3
fo
vs
S
g
:0
o
C
—
CO
Tree cuttin. in Forest area
>-
CN
<
Loss of Habitat
....
sr
Natural
..,
IN
.c
Resource
±
cr
rp
....
,C,
>,
c
c
.3
.o
o
—
CO
c
Tree cutting in Forest area
f 'V
sr
<
r•S
Ecological Disequilibrium Natural
.-.
Resource
.c
-,
±
LID
CV
0
z
:•- 8
..... =
32
CONTROLLED COPY
ra
E
or
C
a)
a)
a)
C
a)
a)
0)
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Health, Safety and Environment Work Instructions
Doc. No.: WI/CO/DO/PR/HSE/19 REF.: QMS 9.1/EMS:9.1,9.1.1 /OHSAS: 4.5.1 Pages: Page 1 of 2
Issue No: 01 Issue Date:301h July 2016 Rev. No.: 00 Revision Date: 30th July 2016
1) Environmental Performance:
The Project site Environmental performance shall be monitored, measured and verified by the Govt.
Approved and accredited Environmental Laboratory. Every quarter each project site should carried out the
Environmental Analysis (Water, Air and Noise) as per following environmental testing matrix.
Management Representative
1
1. MASTER COPY
Issued By
ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011
eN M
ASHki
Health, Safety and Environment Work Instructions
Doc. No.: WI/CO/DO/PR/HSE/19 REF.: QMS 9.1/EMS:9.1,9.1.1 /OHSAS: 4.5.1 Pages: Page 2 of 2
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
The HSE Department will monitor and measure departmental performance on a regular basis.
following parameter are key performance indicator:-
a. Safe man-hour's,
b. Hazard identification & risk control,
c. HSE training in man-hours or per Month,
d. Near miss, incidence, accidents,
e. HSE alert System
0 Medical Treatment
4 Near Misses
Total:- 185
Hazard Identified & Control
( Period Jan-2012 to Feb-2013)
Management Representative N
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 1 ASHOM
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
EVALUATION OF COMPLIANCE
1) Departmental Legal & Other requirement Compliance procedure: Consistent with its commitment to
compliance from the department shall established, implement and maintain a procedure(s) for periodically
evaluating compliance with applicable legal requirement.
The Department shall evaluate compliance with other requirement to which it subscribes. The Department
may wish to combine this evaluation with the evaluation of legal compliance referred to establish a separate
procedure(S).
The Department should be able to demonstrate that it has evaluated compliance with the legal requirement
identified, including applicable permits or licenses.
The Department should be able to demonstrate that it has evaluated compliance with the other identified
requirement to which it has subscribed.
a) Requirements specified by the customer, including the requirements for delivery and post-delivery activities,
b) Requirements not stated by the customer but necessary for specified or intended use, where known,
3) Review of customer requirements: The department shall review the requirements related to the
customer. This review shall be conducted prior to the department's commitment to full fill the customer
requirement. And shall ensure that
b) Contract or order requirement differing from those previously express are resolved, and
d) Records of the results, of the reviews and action arising from the review shall be maintained
Where the customer provides no documented statements of requirement, the customer requirements shall be
confirmed by the department before acceptance.
Management Representative
,
Issued By
MASTER COPY
nnity IF IN RFD
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Health, Safety and Environment Work Instructions
Title: Improvement
IMPROVEMENT
The Department has a procedure(s) for dealing with actual and potential nonconformity(ies) and for taking
corrective action and preventive action and procedure as given below
1) Use appropriate sources of information for corrective and preventive action as listed below:
c) Customer Complaints
2) Decide on the steps needed to be taken to deal with potential Non Conformity to be prevented.
3) Initiate preventive action application of control so that the action becomes effective.
4) Monitor the actions taken to find whether desired action is taking place.
Management Representative
MASTER COPY
Issued By
ONLY IF IN RED
•
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKAHOUSE,ASHOKAMARG,ASHOKA NAGAR, NASHIK— 4220 11
_
Health, SafetyandEnvironmentWorkInstructi ons
I ASHOM
_
Doc. No.: WI/CO/DO/P R/HSE/22 I REF.:QMS: 7.5.2,7.5.3 / EMS 7.5.2,7.5.3 OHSAS: 4.5.4
/
(...
_ Pages: Page1
0
_
ie No:01 Issue Date:30th July 20 16 Rev. No.: : 30th July 2016
Control of Records
Record Description Issue &RevisionStatus Methodof Retaliati Methodof
5
Indexing on Period Disposal
_ .
Backup&shift
3 years
delete
Land acquisitionstatus
COPY
Issue-0 1 Date: 30th July 20 16
h...)
t.....,
..,
V)
ot
or
Rev. No.-00Date: 30th July2016
n
PC/ABL Project s delete
Latest issueon landacquisition& hotspots Issue-0 1 Date: 30th July20 16
(.....)
A,
Monthly
n
6
(FORMAT—ABL/FR/HS E/03)
0
1:11
...<
Rev. No.-00 Date: 30th July 20 16 PC/ABL Projects 3 years
delete
CONTROLLED
Environmentclearanceand MOEF Issue-01 Date: 30th July 20 16 •
-A
,.....,
-,
v)
Cu
CD
...<
Rev. No.-00 Date: 30th July 20 16 PC/ABLProjects delete
Legal• matrixof allprojectrelated
Issue-0 1 Date: 30th July 20 16
1..n
5
permissionswithvalidity CorporateOffice
=
JC
CO
,--• 93
n
0)
CD tr)
a c
Rev. No.-00 Date: 30th July2016 Monthly soft copy 3 years
(FORMAT—ABL/F R/HSE/04) PC/ABL Project s
(I)
1
Legal compliancereportunder
EnvironmentprotectionActandconsentto Issue-01 Date:30th July20 16
ON
5
Corporate Office
F
.9- E
ri• ge
7-
vi
n
operatepermission s/licenses. Monthly soft copy
,....,
0)
a.
-<
Rev.No.-00 Date:30th July2016 PC/ABLProjects
rt)
CD
(FORMAT—ABL/FR/HS E/05)
EnvironmentStatem ent Issue-0 1 Date:30th July20 16
..4
1
Managem ent Representative
I-4
CL
w
In
V)
C
(D
I
0
V)
..Z,
ilth,Safetyand Environment Work Instructions
No.: WI/CO/DO/PR/HSE/22 REF.:QMS: 7.5.2,7.5.3 / EMS 7.5.2,7.5.3 / OHSAS: 4.5.4 I Pages: Page 2 of3
30th July 20 16
0. roi
3-
cL
=-..
Retaliati
iii et
0
a 0
on Period
.0
TestingCertificate fromcompetent
Authorityunder Factory Act & BOCW Act & Issue -0 1 Date: 30th July 20 16
5
g
7'
Fir 23
Corporate Office
0
c
a) lc
ItsrequirementComplianceSummary Rev. No.-00 Date: 30th July 20 16 monthly softcopy 3 years
a.
PC/ABL Projects
riT
Annexure-6
COPY
HSE—Work instructionReports- All Eleven
formats Annexure-7
1) Registerof Environmental Aspects & I mpacts(List
of Environmental Aspects)
(FR/ CO/ DO / PR / HSE / 0 1)
CONTROLLED
2)Registerof HazardIdentification &Risk Assessment
(RiskRegister)(FR / CO/ DO / PR / HSE / 03)
3)Legal Matrix---(FR/ CO/ DO / PR / HSE / 05)
4)Waste Management Register
L., c•g
7:3 ;.,7'
N 0
c) )eu0'
Ls,
5 E'
P cb
--Z N.)
,-,-
0 cp
n
:r C
(D 0
5
O0
a)
o E
C '<
••
r— 0)
7"
FR/ CO / DO/ PR/ HSE/ 06)
(.7 93
•-•
ng
0)
-0 2,
-8
i--•
co -,
-u(D
n
U rD
o-0
Cr)
=
L..,
I;
0
3
8
m
--<
n
-co
bi
tn
Z
0
0
O
C
5)Waste Water Management
,-.•
(-1
>
5?
cl,
r_
ro
al,
(FR / CO / DO/ PR / HSE / 07)
6)Accident Investigation Report
(1-4) (FR / CO / DO/ PR/ HSE / 08)
7)HSE Alert---(FR / CO/ DO/ PR / HSE / 08 -A)
10)Monthly HSE Report(1-4)
(FR/ CO/ DO / PR/ HSE/ 09)
8)MonthlyHSE Committee Meeting MOM
(FR/ CO/ DO/ PR / HSE / 10)
9)Violation Letter-(FR / CO/ DO / PR / HSE/ 11)
Project Water Consumption Report Issue-01 Date: 30th July 20 16 CorporateOffice
ri- 20
•-•
NJ
a
PC/ABL Projects
AT
(D
M
Issue-0 1Date: 30th July 20 16
r-r 23
Corporate Office
La
•—
(DDS
Water CessReturnAnnexure-8 monthly soft copy 3years
Rev.No.-00Date: 30th July 20 16 PC/ABL Projects
co
CD
HazardouswastedisposaltotheCPCB/ Issue-0 1 Date:30th July 20 16 Corporate Office
,-e czo
c p -,3
14 monthly
,....,
soft copy
0,
rD
SPCBAuthorized Thirdparty. Annexure-9Rev. No.-00Date: 30th July 2016
a
PC/ABL Projects
rt.
a)
A
Management Representative MASTER COPY
14P/
ONLY IF INRED
a
ASHOKABUI LDCONLTD, ASHOKAHOUSE,ASH OKAMARG,ASHOKA NAGAR,NASHIK — 4220 11 IASHOM
—
(.4
0
I Issue No: 0 1 Issue Date:30th July 20 16 Rev. No.: 00 Revision Date:: 30th July 20 16
Title:Control of Records
I
= V)
0 't
p, I o z
i CI.
M ethod of
. mg
o. La•
• ....
Method of
a;
0
CD ill
no
Record Description Issue&Revision Status Storage Locatic
-, :: ' 5
47
Indexi ng
4
filli ng
o
=
Road Accident Report Sum maryasper
[ssue-0 1 Date: 30th July20 16
ED* a°
co
Corporate Office
(J1
0, c
1--•
(.4
soft copy
5;
CO
CD
Rev. No.-00 Date: 30th July 20 16 PC/ABL Projects
Vi
(FORMAT —ABL/F R/HSE/0 7)
Project Accidentreportunder factoryact
-. .--.
CONTROLLED COPY
Issue-01 Date: 30th July 20 16
g 25
Corporate Office
al
I-.
ul
and/orBOCW Act monthly Backup
Rev. No.-00 Date: 30th July 20 16 softcopy 3 years
(FORMAT—ABL/FR/HS E/09) PC/ABL Projects del(
Treeplantationsummaryreport . issue-01 Date: 30th July 20 16 CorporateOffice-. ::
g Q°
,.I
t-...
Backup
tr)
monthly
8
o
-a
3 years
-.<
(FORMAT—ABL/FR/HSE/10 ) Rev. No.-00 Date: 30th J uly 20 16 PC/ABLProjects delE
QHSE-NCRreport :ssue-01 Date:30th July 20 16 CorporateOffice-, :-.
g 9°
CO
Backup
v)
i•-•
r)
monthly
8
0
3 years
-a
--c
(FORMAT—ABL/F R/HSE/1 1) tev. No.-00 Date:30th July 20 16 PC/ABL Projects delE
Emergencypreparednessandresponse
Issue-0 1 Date: 30th July 20 16 CorporateOffice-. .-.
g 2°
Backup
•—•
%JD
tn
proceduresand itseffectivenessreport monthly softcopy
Rev.No.-00Date: 30th July 20 16 3 years
(FORMAT—ABL/F R/HSE/12) PC/ABLProjects delE
ProjectGHG Report Issue-01 Date: 30th July20 16 CorporateOffice-. .-.
g a°
CD
NJ
Backup
tn
(FORMAT—ABL/FR/HSE/13) Rev.No.-00 Date:30th July 20 16 monthly soft copy 3 years
PC/ABLProjects delE
Complaintregister Issue-01 Date: 30th July 20 16
....
'1 93
1 Corporate Office Backup
cr+
(FORMAT—ABL/FR/HSE/14) Rev. monthly softcopy 3years
No.-00 Date : 30th July 2016 PC/ABL Projects delE
cl
lal& /or knowledgepreser
aeriod.
MASTER COPY
ONLY IF I N RED
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOKA
Health, Safety and Environment Work Instructions
Doc. No.: WI/CO/DO/PR/HSE/23 REF.: QMS 8.4 / EMS 8.1 / OHSAS:4.4.6 Pages: Page 1 of 1
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
The Department shall ensure that purchased product conforms to specified purchase requirements. The type and
extent of control applied to the supplier and the purchased product shall be dependent upon the effect of the
purchased product on subsequent product realization or the final product.
The Department shall evaluate and select suppliers based on their ability to supply product in accordance with the
Department's requirements. Criteria for selection, evaluation, and re-evaluation shall be established. Records of the
• results of evaluations and any necessary actions from the evaluation shall be maintained.
Purchasing Information:
Purchasing information shall describe the product to be purchased, including, where appropriate,
The Department shall ensure the adequacy of specified purchase requirements prior to their communication to the
supplier.
The Department shall establish and implement the inspection or other activities necessary for ensuring that purchased
product meets specified purchase requirements.
• Where the Department or its customer intends to perform verification at the supplier's premises, the Department shall
state the intended verification arrangements and method of product release in the purchasing information.
Management Representative
Issued By
MASTER COPY
ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Health, Safety and Environment Work Instructions
Pages: Page 1 of 1
Doc. No.: WI/CO/DO/PR/HSE/24 REF.: QMS 7.5.1 / EMS 7.5.1
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
Identification of Legal and other Issue -01 Date: 30th July 2016
1 WI/CO/DO/PR/HSE/25
Requirement Rev. No.-00 Date: 30th July 2016
Issue-01
.- Date: 30th J uly 2016
7 Accident Reporting Procedure WI/CO/DO/PR/HSE/31
Rev. No 00 Date: 30th July 2016
Emergency Preparedness & response Issue -01 Date: 30th July 2016
8 WI/CO/DO/PR/HSE/32
Procedure Rev. No.-00 Date: 30th July 2016
Issue -01
.- Date: 30th J uly 2016
9 Employee medical health checkup WI/CO/DO/PR/HSE/33
Rev. No 00 Date: 30th July 2016
Management Representative
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK - 422 011 ASFIC)KA
Health, Safety and Environment Work Instructions
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
1
i
e, '"1
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
9
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOK1
Doc. No.: WI/CO/DO/PR/HSE/26 REF.: EMS 6.1.3 / OHSAS:4 3.2/QMS:5.1 /8.2.2 Pages: Page 1 of 3
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
To provide a system whereby all hazards associated with activity are identified, examined &
PURPOSE evaluated. To determine those are Siginficant.
All operations at ashoka concessions ltd, ( road & infrastructure construction, rmc plant,all
SCOPE divisional offices, toll
, -N
Identify activities, products
and services for the business
,I
Consider :
• Fire Hazard
• Slip & trip hazard
Decide the interactions with
• Falling from height
the hazards activity
• Electrical hazard
• Housekeeping &
storage
Natural calamity flood,
Initial Hazard review Risk 1
Emergency release of
assessment by HSE Manager prepares gases
independent organizations submission analysing
Observations by staff information
members site inspections
by ACL's staff,
Articles from technical
press review of internal
audits findings, analysis of
non-compliances, analysis Discuss at quarterly Discussion /
of complaints, feedback working group meeting Minutes / Output
from Regulatory bodies,
feedback from suppliers &
customers any other
sources.
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK - 422 011 ASHOM
Doc. No.: WI/CO/DO/PR/HSE/26 REF.: EMS 6.1.3 / OHSAS:4.3.2/QMS:5.1 /8.2.2 Pages: Page 2 of 3
Issue No: 01 1 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
i .
/ Si gnificance criteria :
• Any aspect subjected
to legislation or
regulation
• Any aspect identified
Establish significance (HSE by the group ACL as
Manager to provide a provisional I t
Significant
identification of the significance 4-1
• Any aspect which has
---
I been the subject of
the complaint
‘.,..... ..____
_..4•1
I
Create / update the All other Risks are 1
significant Risk list classified as non significant
, I
.......
--,
( Review quarterly 1 j
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK - 422 011 ASHOM
Doc. No.: WI/CO/DO/PR/HSE/26 REF.: EMS 6.1.3 / OHSAS:4.3.2/QMS:5.1 /8.2.2 Pages: Page 3 of 3
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
RISK RATING
Severity(S) Probability(P)
Rare 1 Exceptional P or > = Year 1
Unlikely 2 Exceptional P or >= Month 2
, Likely 3 < a month or > =daily 3
Almost Certain 4 < daily but > = hour 4
I, <Hourly 5
12 16 20
Z 12 15
•c
ev
10
Probability
Colour code
Colour Range Risk Level
16 to 20 HIGH IMPACT RISK - Must implement extensive risk control.
10 to 15 MODERATE RISK - Conduct formal risk analysis, may require control.
9 LOW RISK - Some risk controls may still be justified.
f., ...
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
1
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Health, Safety and Environment Work Instructions
Title : Departmental Identification of Environmental Aspects and Impacts and control significant impacts
To provide a system whereby all enviromental aspects are identified, examined & evaluated.
PURPOSE
To determine those are siginficant.
Ashoka Concessions Ltd, (Corporate Office, Divisional offices, Road & Infrastructure Projects,
SCOPE All toll operations )
, Consider :
, • • Releases to air
;" Decide the interactions with • Releases to water
the environment • Releases to land
0 ,, • Contamination of land
iiii/. ,// .... x /, e/ / A( or. / 4009h
-— • Use of natural
Initial Environmental I
N , resources
r.; .
review Environmental • Nuisance
'
assessment by
independent organizations HSE Manager prepares ! —
Observations by staff submission analysing
' members site inspections information_
IN
.• by ACL's staff, -- —
•• Articles from technical
:'press .
.• review of internal audits ,
findings, analysis of non . ,%, Discuss at quarterly working
"?. compliances, analysis of group meeting with respect to ,c Significance criteria
.4.
complaints, feedback from Work Instruction & •
Any aspect subjected
12elaulatory bodies, Responsibilities to legislation or
v/ regulation
//////y ; z f //way r•
I • Any aspect identified
.r
by the group ACL as
Establish significance (HSE Significant
Manager to provide a provisional _
„..._..,9 • Any aspect which has
identification of the significance)
been the subject of
_..,
_the complaint
0
•
Management Representative r,
\ MASTER COPY
Issued By ONLY IF IN RED
..%
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 eN
ASFki M
Health, Safety and Environment Work Instructions
Title : Departmental Identification of Environmental Aspects and Impacts and control significant impacts
Review quarterly
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Health, Safety and Environment Work Instructions
Title : Departmental Identification of Environmental Aspects and Impacts and control significant impacts
Quantification system for Environmental Aspects under Normal, Abnormal & Emergency Condition
A B C
Legislation: Impact: Occurrence:
Score Criteria Score Criteria Score Criteria
Y Meeting Legislation 3 Several Time A Day or Continuous
Pl. refer for score &
description for different 2 Once A Day
N Not Meeting legislation types of impacts in the
following pages
1 Once A Month or less Frequent
NA No Legislation or not
applicable
D E
Control : Detection :
Score Criteria Score Criteria
3 Absence of Effective Control 3 Above 1 hour
2 Mechanism in Place But Not Reliable 2 Within 1 hour
1 Available And Effective 1 Immediately
• Slight/negligible impact on human health, which does not have any long-term consequences.
1 Dust accumulation/air pollutants, which do not cause much pronounced changes in productivity of
vegetation.
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK - 422 011
ASH OM
Health, Safety and Environment Work Instructions
Title : Departmental Identification of Environmental Aspects and Impacts and control significant impacts
No Parameter Criteria
1 Legal non compliance High Significant
2 When activities score is 4 arid above High Significant
3 When activities score is 3 and above Moderate Significant
4 When activities score is 2 and above Low Significant
5 When activities score is 1 No significant
6 When the impact is 3 and more High Significant
Format for Environment Aspect & Impact Register is FR /CO /DO /PR / HSE /01
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK - 422 011 ASH OM
Health, Safety and Environment Work Instructions
Doc. No.: WI/CO/DO/PR/HSE/28 REF.: QMS:5.3, 6.1/ EMS 6.1.3 / OHSAS:4.3.2 Pages :Page 1 of 1
Issue No: 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Title : EVALUATION OF LEGAL COMPLIANCE
PURPOSE To ensure that ashoka concessions ltd,is able to demonstrate legal compliance on
enviromental issues.
SCOPE All activities with a legal requirement on the project site of ashoka concessions ltd, nasik
AUDIT
AUDIT SHEDULED
..__
___.-------„,
L
ACTIVITY j
SYSTEM
REPORT DISTRIBUTED
,------------..
--.,---..,_
PARAMETER ---„ 1
<,,,
IN CONTROL/-->
LIMITS
-,,,,,
UPDATE RECORD EXTERNAL PARTY
NON -----) LEGAL MATRIX I
CONFORM . -_. - -
ANCE
PROCEDU LOG DAILY / MONTHLY
RE CONFORMANCE LOG
SHEET, FORMAT
.......---k
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK - 422 011 ASHOM
Health, Safety and Environment Work Instructions
Doc. No.: WI/CO/DO/PR/HSE/29 REF.: EMS: 6.2,6.2.1,6.2.2 /OHSAS: 4.3.4 Pages: Page 1 of 2
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
Title: SETTING OBJECTIVES, TARGETS AND PROGRAMMES
SCOPE All operations at Ashoka Buildcon ltd, (Road & Infrastructure Construction, RMC Plant, All
divisional offices, Toll operations)
Significant aspects
,
innompw.
Management Review I
i Management Review
Working Group / Site 1
i
I Legal requirements
View of interested
parties
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Health, Safety and Environment Work Instructions
Doc. No.: WI/CO/DO/PR/HSE/29 REF.: EMS: 6.2,6.2.1,6.2.2 /OHSAS: 4.3.4 Pages: Page 2 of 2
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
Title: SETTING OBJECTIVES, TARGETS AND PROGRAMMES
Selected
Objectives
Individual action
lists Assign Targets j
I
i
HSE Initiatives
P 1
Management Representative
d,
S f MASTER COPY -N
Issued By ONLY IF IN RED
,
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASH(/‘/Q11,
Issue No: 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
PURPOSE To control waste created at projects, rmc plants, all divisional offices and corporate office.
All operations at ashoka Buildcon Ltd, ( road & infrastructure construction,all divisional
SCOPE
offices, toll operations) to demonstrate conformance to iso 14001:2015
RESPONSIBILITY Project Incharge / Toll Managers/ / Site Store Incharge
Wastage shall be separately and where possible different type of wastes shall be segregated. All wastes shall be
clearly labelled. Skips on site are marked as follows :
Management Representative
MASTER COPY
Issued By ONLY IF IN RED .1
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASH OM
Health, Safety and Environment Work Instructions
Pages :Page 2 of 2
Doc. No.: WI/CO/DO/PR/HSE/30 REF.: EMS 6.1.2
Issue No: 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
' irz , I
I
1
V
t i
. ''
I FULTARDOUS
WASTE
t,
„ ,
t
..,„,..........
, ,„„,u,,
0 fi fli
1111111111
BLUE YELLOW RED BLACK
N Plastic includes all Metal includes Hazardous Waste
v • Paper includes office
U. paper, food and drinks ' forms of plastics, metal scrap, used Oil Filters, Oily
, packaging materials cans, bottles etc parts of machinery, Cotton Waste
46 etc aluminum material
v
0. (Non-Hazardous etc
Material)
Reuse Reuse Reuse if possible, Disposal through
7e "cs •
00 Sale or Disposal Sale or Disposal Sale to authorized Hazardous waste
_c
R. v through proper through proper dealer Disposal Agency
6 2 Agency Agency
Where ever possible opportunities will be taken to recycle and recover wastes in line with the environment policy
commitment.
If Waste Oil is disposed to the Authorized Party make sure the Disposed copy should be with the Project In
charge, Project site Store keeper.
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Issue No: 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
PURPOSE To Control the accidents / Incidents on projects, All offices and corporate office
All operations at ashoka concessions ltd, ( road & infrastructure construction, all divisional
SCOPE
offices, toll operations) to demonstrate conformance to iso 14001
Site HSE officer / Officer, HR & ADM Officer for Accident Investigation & report
RESPONSIBILITY
Project Manager Reporting to External Agents
ACCIDENT
3
SITE j
SUPERVISOR
4
,
3 Major Injury 1
/:/
L._
TIME OFFIll
0 la
Management Representative
top MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Issue No: 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
3 Report to Inspector of
Report;-
Police
1
• Report to Accident
Investigation Report with Building & Construction
Remedial action to Act in prescribed form
Manager HSE Corporate with sign of Project
Incharge and send it
within
Note : If Accident due the vehicle of third party, Victim is Company employee or Third party person
immediately report to Police Station.
Format: FR/CO/DO/PR/HSE/06
N
Management Representative pp
MASTER COPY
Issued By
, ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK - 422 011 ASHOK1
Doc. No.: WI/CO/DO/PR/HSE/32 REF.: EMS : EMS : 8.2 / OHSAS : 4.4.7 Pages :Page 1 of 5
Issue No: 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
All operations at ashoka concessions ltd, ( Road & Infrastructure Construction, All Divisional
SCOPE
Offices, Toll Operations)
# I 1
Follow Emergency Study & Inform Preventive Action
Preparedness & for Hazard
Response Procedure
• •
1
Emergency Response
Prepare On- site Prepare On- site/ Of- site
Plan
Emergency Team Emergency Plan for all such
SP/CO/DO/PR/HSE/01
Emergencies #
Management Representative /e -N
MASTER COPY
Issued By ONLY IF IN RED
N_ J
N.
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK - 422 011 ASH K/1
Health, Safety and Environment Work Instructions
Doc. No.: WI/CO/DO/PR/HSE/32 REF.: EMS : EMS : 8.2 / OHSAS : 4.4.7 Pages :Page 2 of 5
Issue No: 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Title : Emergency Preparedness & response Procedure
/
•
HR Training Conduct Training, Awareness & Mock Drill Reports &
HR/DO/PR/HRD/35 Conduct E mergencies Drill ( Mock Training Records
Drill)
A
A % 1
Check Effectiveness/ Effeciencies Effectiveness of training
HR/CO/DO/PR/HRD/35
/ I
/
Review/ Report Review Report through
441 1 HSE Manager Corporate
B1 EXPLOSION PREVENTION
Store all Acetylenecylinders and liquid oxygen
131.1 Store/ User Dept.
in identified place in all storage area
Ensure all cylinders are placed in well ventilated
B1.2 Store/ User Dept.
place in vertical condition CL/CO/DO/PR/HSE/10
B1.3 Storage empty and filled cylinders separetely Store/ User Dept.
B1.4 Use flash back aras for during gas cutting Store/ User Dept.
B1.5 Conduct periodic inspection of cylinders Store/ User Dept.
Maintain & follow MSDS guidelines for
B1.6 Store/ User Dept.
chemicals
.
Management Representative e,
MASTER COPY
Issued By ONLY IF IN RE
e'
S\ ( 1
CONTROLLED COPY
,
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 I ASHOM
Doc. No.: WI/CO/DO/PR/HSE/32 REF.: EMS : EMS : 8.2 / OHSAS : 4.4.7 Pages :Page 3 of 5
Issue No: 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
EXPLOSION MITIGATION
B2
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 t ASH(.)10
Health, Safety and Environment Work Instructions
Doc. No.: WI/CO/DO/PR/HSE/32 REF.: EMS : EMS : 8.2 / OHSAS : 4.4.7 Pages :Page 4 of 5
Issue No: 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
OCCUPATIONAL INJURIES/
ACCIDENTS[SEVERE/ FATAL]-
D1
PREVENTION, CONTROL, MITIGATION
HSE
D1.1 Follow specific Operational Control Procedure Representative
HSE
D1.2 Use and supervision of prescribed PPE's
Representative
HSE
D1.3 Follow work permit system, as applicable Representative
Undertake electrical repairs [HT panels/ sub SP/CO/DO/PR/HSE/01
Maintainance
D1.4 station/ LT motors etc] only through trained
Incharge CUCO/DO/PR/HSE/15
person & as per documented procedures only
Project Manager/
Not allow to work under the state of alcoholic/
D1.5 Incharge/ Plant
narcotics consumption state Incharge
Project Manager/
Folloe " No Smoking"! "Speed Limit" as Incharge/ Plant
D1.6
specified inside the plant Incharge
Provide Cardio Palmonary Resusitation as First Aid Group
D1.7
required
Provide hospital services to the victim at the First Aid Group
D1.8
earliest
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOKA
Health, Safety and Environment Work Instructions
Doc. No.: WI/CO/DO/PR/HSE/32 REF.: EMS : EMS : 8.2 / OHSAS : 4.4.7 Pages :Page 5 of 5
Issue No: 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Maintain all fire extinguishers as per the work Fire fighting Group CL/CO/DO/HSE/19
A1.1
instruction
A1.2 Provide training to employees onfire fighting HR FR/CO/DO/HRD/35
Conduct Mock Drill once in three months for HSE Representative FR/CO/DO/HRD/35
A1.3
employees
A1.4 Check gas cylinder storage areas HSE Representative CL/CO/DO/PR/HSE/11
Restrict entry of unauthorized persons in sensitive Cordoning Group
A1.5
and barricaded areas
Store all gas cylinder in vertical condition and in well Supervisor / stores
A1.6
ventilated area
A1.7 Store inflammable material away from heat Store / user Dept CL/CO/DO/PR/HSE/11
Store infammable material away from the sources of Store / user Dept
A1.8
fire
Project Manager/
All statutory requirements of pressure vessels are to Incharge/ Plant FR/CO/DO/HSE/05
A1.9
be fulfilled Incharge
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 I ASHOM
To Provide A System Of Routine Medical Examination For The Employees Involved In The
PURPOSE Critical Operations And To Monitor Their Health Conditions.
All Operations At Ashoka Buildcon Ltd, (Road & Infrastructure Construction, RMC Plant, All
SCOPE Divisional Offices, Toll Operations)
This instruction provides frame work for the medical check-up of the employees working for
Applicability:
Ashoka Buildcon ltd., Based on the calendar of Medical check-up for the New Joining & Existing Employee's
(Temporary/ Contract Employees / Permanent Employees) would be undergoing a medical health check up
through the Medical Officer. For Routine & Critical Operation medical examination has to be carried out twice in
Medical Officer Examines the Medical report of the employees and abnormalities if found in the employee's
report, interact with the management and suggest / recommends them further course of action. Contract
employee's medical checkup is governed by the agreement/ settlement arrived at between the contractor and
Management.
Projects : By HSE Officer
Records of all medical reports to be maintained at RMC Plants : Q.C. Engineer
Tolls : Toll Manager
Complete medical file (Report) to be maintained for each individual, whose test has been conducted with
summary & Recommendation of the Doctor / Hospital
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASH %,"
"'NM
Health, Safety and Environment Work Instructions
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
Management Representative .
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK —422 011 i ASHOM
1
Health, Safety and Environment Work Instructions
Issue No: 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
To Provide a controlled & Documented System for safe & Accident free work environment in
PURPOSE
organisation
SCOPE RMC Plant, Crusher , HMP Plant, Project Site & Maintenance work, Office, Labour Camp
Project Managers / Toll Incharge / RMC Plant Incharge/ HMP
RESPONSIBILITY
Procedure:
• Every process owner of department should fill work permit form before start the work.
• Check the safety equipment & ensure the safe working environment.
• Ensure the use of various personnel protective equipment.
• Fill the detailed information of work & duration for the work.
• If job/ activity are cancelled or work program changed, fill the Return work permit.
FR/CO/DO/PR/HSE/PTW/02
2. Height work permit Bridge work, Height work fragile roof
FR/CO/DO/PR/HSE/PTVV/02-A
3. Confined space permit RMC silo, Transit Mixer- Rotating drum FR/CO/DO/PR/HSE/PTW/03
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
I
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Issue No: 01 Issue Date : 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Title : Permit to work on electrical installations Over head power supply lines
01
02
03
04
05
06
07
08
09
10
Mr.
S/o Mr.
Will be In- charge / Supervisor for Supervising the above Mentioned Job and has been Instructed to ensure that
all safety Precautions Mentioned Overleaf are Strictly Adhered to.
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Issue No: 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Title : Permit to work on height/ frigile roof/G.I sheets roof/ Bridge work
Preparation ' Tick (V) Where Applicable And (x) Not Applicable
08 Safety Belts life line checked and hooked / tied firmly to the structure.
a.
b.
c.
d.
ii
Management Representative cf
'.
MASTER COPY
Issued By ONLY IF IN RED
.. .....,..i
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOK'l
Health, Safety and Environment Work Instructions
Mr.
S/o Mr.
Will be In- charge / Supervisor for Supervising the above Mentioned Job and has been Instructed to
ensure that all safety Precautions Mentioned Overleaf are Strictly Adhered to.
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON
BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Title : Permit to work on height/ frigile roof/G.I sheets roof/ Bridge work/ Slab work
Management Representative I .
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Title : Permit to work in confined space ( working inside RMC Silos, HMP, Hoppers, Water Tanks, Bag House, etc)
From AM / PM To AM / PM
1
Mr.
S/o Mr.
Will be In- charge Supervisor for supervising the above mentioned job and has been instructed to
ensure that all safety precaution mentioned overleaf are strictly Adhered to.
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Title : Permit to work in confined space ( working inside RMC Silos, HMP, Hoppers, Water Tanks, Bag House, etc)
01 All concerned employees have been instructed / explained in details about the work to
be performed.
02 Persons are trained in safety
03 Persons have been Medically examined
04 Equipment De- Energised / Fuses removed
05 Line clear has been obtained from the shift Electrician
06 Equipment / place of working has been sufficiently cooled down
07 Sufficient fresh air flow has been ensured
08 Natural / forced Ventilation provided.
09 24 V hand lamps have been provided for illumination
10 Welding M/C 's have been provided for illumination
11 Following PPE's issued to the employees and their use is ensured
a) Safety Helmet
b) Safety Shoes
c) Hand Gloves
d) Dust Masks
e) Any other (PI. Specify)
12 Safety Belts checked & provided
13 Safety belt life line checked, hooked firmly to fixed structure rear the person watching
the employee form outside the space/ near entrance
14 Ladder checked, provided & securely holded / tied to a rigid prevented
15 Movement of over head travelling E.O.T. Cranes / H.O.T. Cranes prevented
16 Means of feeding and Extraction of the material from the confined space has been
Disconnected / blanks provided / Power supply Disconnected and Line clear obtained
17 Means of communication between employees working inside theconined space and
observer(s) standing outside the space has been established
18 Provision of Rescue/ Rendering help to the employees working inside the confined
space (In cas4e of Emergency) has been made in advance
19 Sufficient Illumination (General & inside the confined space), has been provided to
that workers working inside the confined space can be seen.
20 Sufficient No's of First Aid FE.(Of requires type)/ Water House provided.
21 Persons Trained in Fire Fighting have been deployed.
22 Special Precaution (P1. Specify)
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 on ASHOM
Health, Safety and Environment Work Instructions
LOCATION Date
VALIDITY OF From AM / PM To AM / PM
PERMIT
Names and Addresses of the persons Permitted to carry out the Excavation Job
Electrical Department
Supervisor
Safety Officer
Management Representative
MASTER COPY
Issued By
."(51
ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Health, Safety and Environment Work Instructions
Management Representative i,
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
CAUTION This permit is not valid in the event of conditions in the immediate areas becoming hazardous
1 Date
2 Following Persons are permitted to work
Age Designation
Name
a
b
c
d
e
f
3 Name / Identification of the Equipment / Tank / Pipe Line / Area where Hot work is to be carried out
4 Name of the Material Store / Moved in the Equipment / Tank / Pipe Line / Area
6 Exact Location of the Machine / Equipment / Pipe Line / Area where Job Is To Be Performed
AM / PM To AM / PM
From
Mr.
S/o Mr.
Will be In- charge / supervisor for supervising the above mentioned job and has been instructed to ensure
that all safety Precautions Overleaf are Strictly Adhered to.
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
01 All concerned employees have been instructed / explained in details about the work
to be performed
02 Performed are Trained in Safety
03 Persons have been medically examined
04 Equipment De- Generalised / Fuses Removed
05 Line clear has been obtained from the Shift Electrician
06 Equipment / Place of working / surroundings have been cleaned and made free
from flammable materials (By flushing with Steam / Water)
07 The Adjecent Equipments / Tanks / Drainage / Area, have been coveres and made
• safe to avoid falling of sparks on them
08 24 V Hand lamps have been provided for Illumination
09 Welding M/C's have been Earthed and Welding Return current lead have been
Connected at the nearest Point of doing Hot Work
10 Following PPE's issued to the employees and their use is ensured.
a Safety Helmets
b Safety Shoes
c Hand Gloves
d Apron
e Any other (PI .specify)
11 Safety belts checked & provided
12 Safety belts life line checked, hooked firmly to fixed structure
13 Ladders checked, provided & securely holded / tied to a rigid structure
14 Means of Feeding in and extraction of the material from the equipment/ Pipe line
has been Disconnected/ Blinded Off / Power supply Disconnected & Lin Clear
obtained
15 Sufficient No.s of First Aid F.E. (Of required Type) Running Water Hose Provided
16 Persons trained in Fire Fighting have been deployed
17 Special Precaution (PI. Specify)
a
b
c
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 1 ASHOM
I
Health, Safety and Environment Work Instructions
Issue No: 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
VALIDITY OF
From AM/PM To AM/PM
PERMIT
Is Returned / cancellation due to completion of the job / Discontinuation of the Job/ Expiry of Time Validity
Before returning the above mentioned Permit all persons/ Tools / Materials have been removed from the work place.
Signature
Signature of Issuer of V Permittee
of Issuer of the Work Permit (Supervisor)
Management Representative /,
MASTER COPY
Issued By ONLY IF IN RED ...)
\.'•
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK - 422 011 ASH OM
Health, Safety and Environment Work Instructions
Issue No: 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30 July 2016
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016 '
HSE & S Monthly Meeting Agenda- HSE- Issue No. 01 Date: 30th July 2016
8 FR/CO/DO/PR/HSE/08
MOM Format Rev. No. 00 Date: 30th July 2016
l'ibt,
N _ I
I; ili 04)
Aah.
4`
Depart , -nt Head I S Director Manag e7, ASITISERttt) p y
CONTROLLED COPY
ASHOKACON CESSIONS LTD, ASHOKA HOUSE, ASHOKA MARG,ASHOKA NAGAR, NASH IK — 422011
in
0
I
Health, Sa fety and Environment Work Instructions
V—.
-
Pages :Page 1 a
Doc. No. : FR/CO/DO/PR/ HSE/01 REF. : WI/CO/DO/ PR/ HSE/28
•
th
--1
Z
w
,-.,
6
z
0
vo
re)
Ep
5
N
,-,
Issue Date: 30 July 2016 J Rev. No. : 00 Revision Date :
Tit le : Environment Aspects &Impact Study .
a)
vi
CIco
tii
"a
4.,
Update:
Con d ition
47.
(..,to
2
c
in
t.)
a)
ol
BxCxDxE
CONTROLLED COPY
\
e
Management Representative
M ASTERCOPY
03
$
ONLYIFINRED
1
-.&
I
's
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKAMA RG, ASHOKANAGAR, NASHIK — 422 011
tI)
Health, Safety and Environment Work Instructions
I di
1Pages :I age 1 of 1
th th
Issue No: 01 Issue Date: 30 July 2016
TA
.5
a)
c
O
Rev. No. : 00 Date: 30 July 2016
Title: Hazard Identification and Risk Assessment Study
SITE:
1 Date of Update:
RISK RATING
V)
do
Z
I:
Dept. / Area Activity Hazard 1 I
CU
...I
711
S
>
P Ris
4 I
to
E
u
4.,
co
c
co
II
dx S
SEVERITYI PROBABILITY1 R
L
N
c6
Ni
vi
CONTROLLED COPY
%c;
N:
00
G1
ci
...,
,
Ma nagement Representative MAS 1 h R COPY
ONLYIF I NR ED
H
1-1
w
co
N
a
NM.
>-
a_1-1-1
O X
• Z
"O
0
•c.
a)
Q.
1111 L::000
c: ) 10: 1 1 1
To
o
a >-:
m.
O go III
X
4c5 c)
N
• a) c
▪rill 8
a) O .25
-0 c
(1C0 1,-0
:,
4. -_
a) rn
4--,
▪ (r)
E '-(5)
= 0.)
Z lY
C
0
a)
U 0
O
Ca
C 5
'
1-4
a.
Manage ment Representative
L-
C
a) c •,-1-
0
C ..c
a) .3,
C U
L7) <
C a) c
11.) O
C N
2
..,
cu :
E cm
(13 (3)
z ‘:
o
a)
a)
(0 a) E
a) fC ,..:
Ill12 1111
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK - 422 011 ASHOM
Health, Sa fety and Environment Work Instructions
Doc. No. : FR/CO/DO/PR/HSE/ 04 REF. : WI/ CO/DO/ PR/ HSE/30 Pages :Page 1 of 1
th th
cu
=
0
z
—.
0
Issue Date:30 July 2016 Rev. No. : 00 Revision Da te: 30 July 2016
Title : Waste Management Register
SITE:
d
ice
,a
0
Disposa l of Waste
K.. / Month) forage
Action P lan f
Proof for Disposal, Cha llan of Disposa
AuthorizedVendor, if any Area
m
Kitchen Waste
0
Waste Grease
0
Waste Lubricant Oil
0
Waste Ca ble, Rubber Pipe
CONTROLLED COPY
Glass / Bu lbs / Tube Lights
0
Concrete Block
0
Metal - M S / SS / Tin /
1-1
0
Paint Waste
-
14
Batteries
1-1
Electronic Waste ( CD, PC Parts)
Management Repres
4
1
M ASTERCOPY
ONLYIFINRED
Issued By
ASHOKABU ILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, A!3HOKA NAGAR, NASHIK - 422011
(1)
I
0
Health, Safety a nd Environment Work Instructions
Doc. No. : FR/ CO/ DO/ PR/ HSE/05 EF. : WI/CO/DO/ PR/ HSE/30
..._o
ti
Pages :Page
th
.--.
til
7
C)
Z
•..I
6
0
;sue Da te:30 Ju ly 20 16 Rev. No. : 00 Revision Dat(2 :
30 thJuly 2016
Waste
Water
til
Eto
c4.,
1
Month Generated
( Lit. /
.T.
a)
0
1-1
JANUARY
0
Cs1
FEBRUARY
0
61
MARCH
0
et
APRIL
0
111
MAY
0
LLJ
lel
Z
D
,n
CONTROLLED COPY
0
n.
rn
-1
D
0
oo
AUGUST
0
o
SE PTEMBER
OCTOBER
1-1
o
1-1
1.-1
NOVE MBER
N
1-1
DECEMBER
A
03
13
7
41/
3.
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK - 422 011
I .,,S1-114:7>IK/I
Health, Safety and Environment Work Instructions
Doc. No.: FR/CO/DO/PR/HSE/06
IREF.: WI/CO/DO/PR/HSE/FR/32 Pages: Page 1 of 1
Issue No: 01 iIssue Date: 30th July 2016 Rev. No.: 00 Revision Date 30th July 2016
Title : Incident / Accident Investigation Report
Environmental Damage: --
Others: -
Project Incharge :
Signature: Date:
Distribution: Original Copy (Signed) -with
Project site, Scan colour copy:- Head HSE&S, Insurance Head, DGM- HR& Admin
Management Representative
Issued By MASTER COP Y
ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARC, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Health, Safety and Environment Work Instructions .
Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Issue No: 01
Alert Details:
Time:
Date:
Action Taken:
Pictures of Incident:
Root Causes :
Recommendations :
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK - 422 011 ASHOM
Health, Safety and Environment Work Instructions
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
Title : HSE & S Monthly Meeting Agenda - HSE -MOM Format
Name of Project:
Venue of Meeting:
Date & Time:
HSE — Committee Members Present:
Leave Absence (If Any):
1.
2.
3.
4.
6.
CONTROLLED COPY
1 ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKAMARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
1
Health, Safety and Environment Work Instructions
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
Title : Violation Letter & IDLH
HSE Memorandum
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK - 422 011 I ASH OM
Health, Safety and Environment Work Instructions
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
II
1..
ii I,
et.atel.e ,4 •-•
.: ': .
4141 0 0 ® 4C6-.1.7'
• .A.
....4,
Work Place FlagOlnit
Excavaton
Concrete
Work
Work With
Moving
Equipment
Electrical
Safety
PPE matrix W"king
.,
—
Safety
nr
Precautions
Of Dnving
/4°"°"
Fail —
Atateruil
Safety Data
Sheet
Preventive
Maintenance
Of Vehicles
Material
Handling
Safety
TraffIC r Wornk
Work
•; a —lb g IN
',' el7 I 4 INCIIDENT
I S4 '
'4.• • •
REWIND 4 i it . ;Pk 4'.1
fib I . ;;,{,iik .. it4 —Assembly
AW
?L 141
:!* • Point t C 1
Row Working Road Incident / Lifting & Fee Prevent Oil General First
Welding Emergency
Barricadi Work
work Near Maintenance Accident Crane Safety Carrying Extinguisher I Chemical 5 S System Aid
rig And c„..,, Preparedness spillage Treatment
Work Reporting Safety S Use
Signage's '"'''' Lines
Attendance Sheet
Sr. No Name of Employee Designation Sign
1
2
3
4
5
6
7
8
9
10
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK- 422011 ASHOM
Health, Safety and Environment Work Instructions
Doc. No.: ABL/FR/CO/DO/PR/HSE/11 REF.: WI/CO/DO/PR/HSE/31 Pages: Page 1 of 1
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
Title : Near Miss Report
Near Miss: A personal hazard or an unwanted event that did not result in an injury, illness, exposure or damage but had the
potential to do so. There was no slip, fall, punch, poke, bruise, strain, fire, or exposure.
Form Instruction
Within 24 hours the witness or person with knowledge of near miss/potential hazard must complete
section 1.
2. Fax immediately to the safety office.
3. The person, who completed section 1, must give from to their supervisor.
4. Supervisor must conduct an investigation and complete section 2.
5. Upon supervisor's completion of section 2, the entire form must be fixed to the safety office.
Descnption:
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK - 422 011 ASHOKA
Issue No: 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Project Status
Road length
Lanes
1 Name of Project Head
Name of Site HR & Admin Head
Name of EHS officer
Traffic No for the month (PCUs)
Memorandom / Violation
No of memos issued to employees for non compliance of safety
6
Total amount of fines levied on individual employees for non compliance of safety (in Rs.)
Total amount of fines levied on Contractors for non compliance of safety
Accident Data
Work Place Accident details
No. of First Aid box provided at site
7 No. of Fatalities
No. of Serious Injuries
No. of Minor Injuries (incl. First Aid cases)
No. of EHS Non-compliances and Near Miss Cases
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK - 422 011 ASHOKA
Issue No: 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Greivance Details
10 No. of Grievances Raised
No. of Grievances Resolved
•
Tree Plantation Summary
13
No. of Tree already planted
Site management citifies that mandatory displays are in place (Yes / No)
Site management citifies that wage paid comply with minimum wage law (Yes / No)
Site management citifies that minimum wage rate is updated & displayed at the every point of camp office gate (Yes / No)
Site management citifies that overtime register maintained & overtime wage paid as per law (Yes / No)
0 Site management certifies that all applicable labour returns have been field and necessary licenses & workmen compensation insurance cover are in
place (Yes / No)
Site management citifies all construction vehicles are equipped with minimum safety apparatus like: back light, reverse horn, rear view mirror &
periodic maintained (Yes / No)
Site management citifies that adequate no. of First Aid boxes have been provided & replenish periodically (Yes / No)
MASTER COPY
)9\ ONLY IF IN RED
CONTROLLED COPY
ASHOKA Buildcon Ltd., Ashoka House, Ashoka Marg, Nashik - 422009 ASHOKA
Health, Safety and Environment Work Instructions
Doc. No.: WI/CO/DO/PR/HSE/13 REF.: WI/CO/DO/PR/HSE/FR/32 Pages: Page 1 of 1
Issue No: 01 Issue Date:30th July,2016 Rev. No.: 00 Revision Date : 30th July,2016
Title : Hot/Black Spot Investigation Report
Hot/Black Spot Investigation Report
Project: Date:
Location:
Accident Trend:
Fatal Serious Minor
No. of Accidents
Accidents Accidents Accidents
Accident Spot:
Drawing / Sketch
Actual Photographs
-{ MASTER COPY
p40 ONLY IF IN RED ,
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG,ASHOKA NAGAR, NASHIK —422 011 ASHOK/1
HSE Work Instructions
Doc. No.: FR/CO/DO/PR/HSE/14 REF.: WI/CO/DO/PR/HSE/26 Pages: 1 of 7
Issue No: 01 Issue Date: 30th July 2016 lRev. No.• 00 Revision Date . 30th July 2016
1 Factory license
2 Explosive License (Diesel Pump)
3 Labour License
4 NOC Details
5 (District Industry Center) DIC License
6 Weight and Measurement License
7 Pollution Control Board - Consent to Operate - RMC
8 Pollution Control Board - Consent to Operate - HMP
9 Pollution Control Board - Consent to Operate - WMM
ildin_ and other Construction Workers' (Regulation of Employment and Conditions of Service) Central Rules, 1998
Compliance Status
Description Needs
Net se per Net Net Remark
Complied Interovemen
Rule CaePtiee APINNebe.
t
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG,ASHOKA NAGAR, NASH1K -422 011 ASHOKA
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG,ASHOKA NAGAR, NASHIK -422 011 ASHOKA
HSE Work Instructions
Doc. No.: FR/CO/DO/PR/HSE/14 REF.: WI/CO/DO/PR/HSE/26 Pages: 3 of 7
Issue No: 01 Issue Date: 30th July 2016 Rev. No.: 00 RevisPon Date : 30th July 2016
Title: Legal Audit Report
Notice of poisoning or occupational diseases specified in
39
Schedule II inForm No. XIII
First-aid boxes with articles specified in Schedule III and
40 emergency care services or treatment with essential lifesaving
aids and appliances
45 Register of wages;
46 Muster roll;
47 Register of deductions;
48 Register of overtime;
49 Register of fines;
50 Register of advances;
55 Serve tea and snacks at a work place 200 mt from the canteen
5 Housekeeping of Plant
MASTER COPY
Management Representative ONLY IF IN RED
Issued By
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG,ASHOKA NAGAR, NASHIK —422 011 ASHOKA
HSE Work Instructions
Doc. No.: FR/CO/DO/PR/HSE/14 REF.: WI/CO/DO/PR/HSE/26 Pages: 4 of 7
Issue No: 01 Issue Dale: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Title: Legal Audit Report
11 Latrines and Urinals - Separate for Male & Female. Sign board.
15 White washing/painting
Pressure Vessels - Max. Safe working pressure and the date of the
21 last examination to be plainly marked on every pressure vessel
Examination by competent person.
Floors, stairs and means of access - Kept free from obstructions &
22 substances & to ensure safety, steps, stairs, passages and
gangways be provided with substantial handrails
At least two ways of escape from every floor area and the exit i
29
shall be remote from each other
Lightning arrestors at sub-station buildings and outdoor
30
transformers and switch yards
The materials stored in the open shall be at a distance not less
31
than 10 meters away from process or storage building
re •
. MASTER COPY
Management Representative b61‘\
ONLY IF IN RED
Issued By
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG,ASHOKA NAGAR, NASHIK -422 011 ASHOKA
HSE Work Instructions
Doc. No.: FR/CO/DO/PR/HSE/14 REF.: WI/CO/DO/PR/HSE/26 Pages: 5 of 7
Issue No; 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Title: Legal Audit Report
Full time Factory medical officer above 200 workers & information
43
to Chief Factory Inspector.
OHC having at least 2 rooms each with minimum floor area 15
44 sq.m. with adequate illumination and ventilation as well as
eeuipment as prescribed
One nurse, one dresser-cum-compounder and one sweeper-cum-
45
ward boy throughout the working period
MASTER COPY
Management Representative ONLY IF IN RED
Issued By
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG,ASHOKA NAGAR, NASHIK —422 011 ASHOKA
HSE Work Instructions
Doc. No.: FR/CO/DO/PR/HSE/14 REF.: WI/CO/DO/PR/HSE/26 Pages: 6 of 7
Issue No! 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Title: Legal Audit Report
MASTER COPY
Management Representative ONLY IF IN RED
Issued By
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG,ASHOKA NAGAR, NASHIK —422 011 ASHOK/1
HSE Work Instructions
Doc. No.: FR/CO/DO/PR/HSE/14 REF.: WI/CO/DO/PR/HSE/26 Pages: 7 of 7
Issue No: 01 Issue Dale: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Title: Legal Audit Report
The Gas Cylinder Rules, 2004
In case the company fills any cylinders with compressed gas
15 or imports possesses or transports any cylinder so filled or
intended to be filled with such gas, RULE 3
Obtained license from Chief Controller of Explosives and its renewal for
a) LPG Cylinders if total quantity of gas exceeds 100 kg at any time within
specific area
b) DA (Flammable but non-toxic) cylinder , if total quantity of such
18 cylinders exceeds 15 nos. or 125 kg as total weight at any time
c) Total nos. of non-toxic / non-flammable(02, Argon, SF6, N2, He) as gas
cylinders exceed 50 nos. at any time
d) Ammonia (Toxic Gas) cylinders of total number cylinders exceed five at
any one time
80-90 • Remark
60-70 70-80 90-100
Criteria
Not as Need Improvement
Failed GOOD
vier rule
MASTER COPY
Management Representative ONLY IF IN RED
Issued By
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG,ASHOKA NAGAR, NASHIK - 422 011 /ISHOKA
I oral
Mark Mark Percentage
Sr.No. Parameter
Allotted Obtained
1 Safety Organization 10
2 QHSE Policy 80
3 First Aid 50
4 Plant Inspection 110
S Machine Guarding, Electrical & Personal safe guarding 50
6 General condition 30
7 DG Set 80
8 Personal protective equipment 40
9 Fire protection and prevention. 120
Accident Investigation and Recording. & Premises and
10 100
Housekeeping
11 Environment 70
12 Legal & Statutory Requirement 90
Over all mark 830
Marks Marks
Sr. No Description Remarks
allotted obtained
1 Safety Organization
1 Organization Logo as per the Corporate guideline 10
10
2 QHSE Policy
1 QHSE Policy display in dept. 10
2 Awareness among employees 10
3 Distribution of QHSE policy card. 10
4 Appointment of Coordinator & its responsibility. 10
5 Compliance records for hygiene. 10
6 Safety sub committee (SSC) 10
7 On job safety communication. 10
8 Conducted daily oath 10
80
3 First Aid
1 Condition of First aid box. 10
2 Location of First aid box. 10
3 Display of First aiders name in the department. 10
4 First aid training record. 10
5 First aid record & investigation. 10
50
4 Plant/ Toll Inspection
1 Booth round by Safety officer 10
2 Observation & compliance report. 10
3 Identification of potential risk factors. 10
4 Booth Hygiene/Housekeeping 10
5 Availability of fire fighting equipments at toll booth area 10
6 Condition of safety posters, Informative or Warning sing boards 10
7 Canteen Hygiene 10
8 Canteen Waste Management 10
9 Lighting Arrestor for booth/Office 10
10 Drinking water Facility 10
11 Parking area allocation 10
MASTER COPY
Management Representative ONLY IF IN RED
Issued By
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG,ASHOKA NAGAR, NASHIK - 422 011 ASHOKA
Health, Safety and Environment Work Instructions
Doc. No.: FR/CO/DO/PR/HSE/15 Ref: WI/CO/DO/PR/HSE/34 Pages: Page 2 of 3
Issue No: 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Title : 5 Star Ranking
110
5 P&M and Electrical Equipments
1 All nip & rotating parts guarded
2 All guards as per standard.
3 All guards are numbered.
4 Availability of inspection records & compliance.
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG,ASHOKA NAGAR, NASHIK - 422 011 ASHOKI1
Health, Safety and Environment Work Instructions
Doc. No.: FR/CO/DO/PR/HSE/15 Ref: WI/CO/DO/PR/HSE/34 Pages: Page 3 of 3
Issue No: 01 Issue Date: 30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Title : 5 Star Ranking
110
5 P&M and Electrical Equipments
1 All nip & rotating parts guarded
2 All guards as per standard.
3 All guards are numbered.
4 Availability of inspection records & compliance.
5 Effectiveness of lockout system.( Cabin or Electrical Appliance) 10
6 All electrical cables are properly insulated 10
7 All switch boards are properly fix or guarded 10
Availability of fire fighting equipments near electrical panel room/
8 10
UPS room etc.
9 Labeling of switches and isolators. 10
50
6 General condition
1 Identification on ladders/stairs/walkways/scaffolding. 10
2 Distance between the steps and angle of steps. 10
3 All ladders as per standard. 10
30
7 DG Set
1 Chimney Height in meter 10
2 DG Set is properly placed in DG Room 10
3 Earthing for DG set 10
4 Availability of inspection records & compliance. 10
Safe handling procedure. or S.O.P For Various Motorized
5 10
equipment
6 Motorized equipment checklist. 10
7 Availability of inspection checklist & compliance. 10
8 License for operation. 10
80
8 Personal protective equipment
1 Record of PPE(Helmet,Shoes,eye protector, clothing) 10
2 Usage of PPE. 10
3 Condition of PPE. 10
4 Periodic replacement of PPE & compliance. 10
40
9 Fire protection and prevention.
1 Records for fire fighting training. 10
2 List of fire extinguishers in the department. 10
3 Location of fire extinguishers. 10
4 Records for fire incidents. 10
5 Maintenance of fire extinguishers as per schedule. 10
6 Safe operating procedure for Fire Extinguisher. 10
7 Whether Alarm/ other warning system is available. 10
8 Emergency plan 10
9 Mock drill frequency and record. 10
10 Availability of Emergency exit. 10
11 Test of earthing/Lightening arrestor. 10
12 Fencing, notices and sign boards. 10
120
Accident Investigation and Recording & Premises and
10
Housekeeping
1 Condition of structure and buildings. 10
2 Cleanliness of floor. 10
3 Natural lighting & Ventilation. 10
4 Sufficient illumination in the workplace. 10
5 Records for checking and repairs of light fittings. 10
6 Frequency of cleaning of various workplace. 10
7 Cleanliness of Urinals/Lavatories/wash basin etc. 10
8 Condition of sewage system/waste disposal system. 10
9 condition of Office/store room as per 5 S principle. 10
10 Condition of scrap yard/ scrap bins. 10 I'
100 • MASTER COPY
Management Representative ONLY IF IN RED
Issued By
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASH OKA
Health, Safety and Environment Work Instructions
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
1. Checklist for safety measures for Excavation Issue No. 01 Date: 30th July 2016
CL/CO/DO/PR/HSE/01
Rev. No. 00 Date: 30th July 2016
Checklist for safety measures for Demolition Issue No. 01 Date: 30th July 2016
. CL/CO/DO/PR/HSE/02
Of Structure Rev. No. 00 Date: 30th July 2016
Checklist for safety measures for scaffolding, Issue No. 01 Date: 30th July 2016
Ladders CL/CO/DO/PR/HSE/03
Rev. No. 00 Date: 30th July 2016
Checklist for safety measures for the use of Issue No. 01 Date: 30th July 2016
• lifting equipment CL/CO/DO/PR/HSE/04
Rev. No. 00 Date: 30th July 2016
5. Checklist for operation of equipment Issue No. 01 Date: 30 th July 2016
CL/CO/DO/PR/HSE/05
Rev. No. 00 Date: 30th July 2016
6. Checklist for safety measures for cranes Issue No. 01 Date: 30th July 2016
CL/CO/DO/PR/HSE/06
Rev. No. 00 Date: 30th July 2016
7. Checklist for safety measures for winch Issue No. 01 Date: 30th July 2016
CL/CO/DO/PR/HSE/07
Rev. No. 00 Date: 30th July 2016
8. Checklist For safety measures for Lifting gears Issue No. 01 Date: 30th July 2016
CL/CO/DO/PR/HSE/08
Rev. No. 00 Date: 30th July 2016
Checklist for safety measures for Electric Issue No. 01 Date: 30th July 2016
Items CL/CO/DO/PR/HSE/09
Rev. No. 00 Date: 30th July 2016
Checklist for safety measures for Fabrication Issue No. 01 Date: 30th July 2016
10. CL/CO/DO/PR/HSE/10
& Erection Rev. No. 00 Date: 30th July 2016
11. Checklist for safety measures for storage Issue No. 01 Date: 30th July 2016
CL/CO/DO/PR/HSE/11
Rev. No. 00 Date: 30th July 2016
Checklist for safety measures for Hot Issue No. 01 Date: 30th July 2016
12 . CL/CO/DO/PR/HSE/12
Bituminous Work Rev. No. 00 Date: 30th July 2016
13. Checklist for safety measures for First Aid Box Issue No. 01 Date: 30th July 2016
CL/CO/DO/PR/HSE/13
Rev. No. 00 Date: 30th July 2016
14. Checklist for Health Hazard survey Issue No. 01 Date: 30th July 2016
CL/CO/DO/PR/HSE/14
Rev. No. 00 Date: 30th July 2016
Personal Protective Equipment Store Issue No. 01 Date: 30th July 2016
• 15. CL/CO/DO/PR/HSE/15
Invento ry Rev. No. 00 Date: 30th July 2016
16. House Keeping Issue No. 01 Date: 30th July 2016
CL/CO/DO/PR/HSE/16
Rev. No. 00 Date: 30th July 2016
17, working at height Issue No. 01 Date: 30th July 2016
CL/CO/DO/PR/HSE/17
Rev. No. 00 Date: 30th July 2016
18. Fire Extinguishers servicing Issue No. 01 Date: 30"' July 2016
CL/CO/DO/PR/HSE/18
Rev. No. 00 Date: 30th July 2016
Ai.
. oa.
II.•Ar, \ OAte
fir 10'
Depa m- t Head IMS Director Managem- t Representative
c
Pr-pared By Approved By ,siteDVSTER COPY
ONLY IF IN KED
N ..,
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Health, Safety and Environment Work Instructions
Doc. No.: CL/CO/DO/PR/HSE/01 REF.: QMS: 7.5.1 / OSHAS : 4.3.1 Pages :Page 1 of 1
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Project Name:
Site: Date:
Location:
Sr. STATUS
DESCRIPTION
No.
YES NO NA
Excavation permit filled out completely & provide the all safety equipment for
01
excavation site
02 Overall job site is free of debris and good housekeeping being maintained
03 Employees exposed to vesicular traffic are wearing proper fluorescent jacket
04 Display the Caution board, Signage, Directive warnings
05 Work area is properly protected with barriers / barricades
06 All underground utilities are to be considered live and in service
All excavation around utilities are to be surveyed, identified and marked on daily
07
basis
Locate and identified shut off valves, electrical feeder panels, manholes prior to
08
beginning excavation
09 All utilities will be hand dug within 2'in all directions
10 Utilities are supported, shored, protected or removed in open excavations
Any utilities that does not show up on current as built will be as built prior to back
11
filling
12 Surface encumbrances that create a hazard or supported or removed
13 Adjacent structures have been adequately supported
14 Excavated material is placed at least 2' from edge of excavation
Excavations greater than 4'in depth have proper means of access and egress within
15
25' of lateral travel
16 Ladders used in access and egress are secured and extend 3' above the excavation
17 Excavation inspected of possibility of water accumulation
18 Excavation continually monitored and properly protected if water accumulates
19 Employees are prohibited from working under any over headed suspended load
20 Employees are protected from loose soil or rock falling excavation face
Proper walk ways / bridges are provided where employees are required to cross
21
excavations
22 Remote excavations are properly protected with barriers and barricades
23 If hazards atmosphere could reasonably be expected confined space permit
24 Lighting arrangement during Night Time
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK - 422 011 ASHOM
Health, Safety and Environment Work Instructions
Doc. No.: CL/CO/DO/PR/HSE/02 REF.: QMS: 7.5.1 / OSHAS . 4.3.1 Pages :Page 1 of 1
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Project Name:
SITE: Date:
LOCATION:
Sr. STATUS
DESCRIPTION
No.
YES NO NA
Management Representative
(,'
. MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011
ASH(.)IQ1
Health, Safety and Environment Work Instructions
Doc. No.: CL/CO/DO/PR/HSE/03 REF.: QMS: 7.5.1 / OSHAS : 4.3.1 I Pages :Page 1 of 1
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Project Name:
SITE: Date:
LOCATION:
For the Month:
Sr. STATUS
No. DESCRIPTION
YES NO NA
01 Design tall scaffold
iii) Minimum 1050 when used for heavier loads or support higher platform
07 Check whether all scaffolds and working platforms are securely fastened
to the building or structure and braced or guyed properly
08 Whether platforms are tied using proper binding wires?
09 Provide a regular plant stairway enough for two people to pass and to
provide handrails on both sides
10 Are openings in working platform kept safely covered / fenced?
14 Check for fall of loose materials, bracing and other parts of scaffold
Management Representative
MASTER COP
Issued By
ONLY IF IN RE
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK - 422 011 ASHOM
Health, Safety and Environment Work Instructions
Doc. No.: CL/CO/DO/PR/HSE/04 REF.: QMS: 7.5.1 / OSHAS : 4.3.1 Pages :Page 1 of 1
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Title: Safety measure for the use of lifting equipment
Project Name:
Site: Date:
Location:
For The Month:
STATUS
Sr. No. DESCRIPTION
YES NO NA
Management Representative
MASTER COP"
Issued By ONLY IF IN RED
CONTROLLED COPY
• 11.1.17.-
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Health, Safety and Environment Work Instructions
Doc. No.: CL/CO/DO/PR/HSE/05 REF.: QMS: 7.5.1 / OSHAS : 4.3.1 Pages :Page 1 of 1
Issue No: 01 Issue Date:301h July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Project Name:
Site: Date:
Location:
Cranes:
Use Of Safety Device:
For The Month:
S r. STATUS
DESCRIPTION
N.
' YES NO NA
Stop the machine first before carrying out deaning, lubricating and
maintenance of machinery
Management Representative -1
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011
ASHOM
Health, Safety and Environment Work Instructions
Doc. No.: CL/CO/DO/PR/HSE/06 REF.: QMS: 7.5.1 / OSHAS : 4.3.1 Pages :Page 1 of 1
Issue No: 02 Issue Date:1st Aug, 2013 Rev. No.: 01 Revision Date : 1st Aug, 2015
Title: safety measures for cranes
Project Name:
Site:
Date:
Location:
Cranes:
Sr. STATUS
No. DESCRIPTION
YES NO NA
01 Check and inspect
07 Load charts
Management Representative
MASTER COPY
Issued By ONLY IF IN RELY
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOK/I
Health, Safety and Environment Work Instructions
Doc. No.: CL/CO/DO/PR/HSE/07 REF.: QMS: 7.5.1 / OSHAS : 4.3.1 Pages :Page 1 of 1
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Project Name:
SITE: Date:
Location:
Cranes:
Use of Safety Device:
For the Month:
STATUS
Sr. No. DESCRIPTION
YES NO NA
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
]
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK - 422 011 I
ASHOM
Health, Safety and Environment Work Instructions
Doc. No.: CL/CO/DO/PR/HSE/08 REF.: QMS: 7.5.1 / OSHAS : 4.3.1 Pages :Page 1 of 1
Issue No: 01 Issue Date:30 th July 2016 I Rev. No.: 00
Revision Date : 30 th July 2016
Title: Safety measures for lifting gears
Project Name:
Site:
Date:
Location:
Period From:
For The Month:
Sr. STATUS
No. DESCRIPTION
YES NO NA
01 Check the sling before use
Preserve the wire ropes against rusting, kinking, fraying, bird caging
03 and heat damage (Wire Rope Test certificate from competent
person)
04 Any other point
Management Representative
MASTER COPY
Issued By
ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011
ASHOM
Health, Safety and Environment Work Instructions
Doc. No.: CL/CO/DO/PR/HSE/09 REF.: QMS: 7.5.1 / OSHAS : 4.3.1 Pages :Page 1 of 1
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Title: Safety measures for Electric Items
Project Name:
Site:
Date:
Location:
Period From: To:
Sr. STATUS
No. DESCRIPTION
YES NO NA
01 Check electric system for design & inspection
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011
'INCA
ASH%.,,
Health, Safety and Environment Work Instructions
Doc. No.: CL/CO/DO/PR/HSE/10 REF.: QMS: 7.5.1 / OSHAS : 4.3.1 Pages :Page 1 of 1
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Title: Safety measures for Fabrication & Erection
Project Name:
Site:
Date:
Location:
Period From: To:
Sr.
Description STATUS
No.
YES No NA
01 Check periodically all equipments like,
a. Gas cutting machines sets
b. Welding machine sets
c. Drills, machine
d. Power hacksaws
e. Grinders
f. Bar cutting machine
g. Bar bending machine
h. Jib crane
i. Tower crane
j. Generators
k. Compressors
I. Derricks
m. Hoists
02 Check whether moving parts of all equipments are provided with safety
guards
03 Check and rectify following
a. Rubber pipe lines for Oxygen and Acetylene gas for leakage or damage
b. Leakage of gas from regulators, pipelines or connections with the gas torch
c. To wear gloves and use aprons, proper welding screen by workers
04 Check power cables whether properly insulated and protected
05 To display danger signs on poles of overhead electric lines
06 To store cut pieces and scarp at an allotted space to avoid accidents
07 Check thoroughly following tools and tackles before starting work
a. Lifting tools and tackles
b. Ropes — Test Certificate 1
c. Shackles
d. U — clamps
e. Chain pulley blocks
f. Hooks
08 Any other point
Management Representative
MASTER COPY,
Issued By
ONLY IF IN REpi
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011
ASHOM
Health, Safety and Environment Work Instructions
Doc. No.: CL/CO/DO/PR/HSE/11 REF.: QMS: 7.5.1 / OSHAS : 4.3.1 Pages :Page 1 of 1
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Project Name:
Site: Date:
Location:
Period From: , To:
For The Month:
Sr. STATUS
No Description
YES No NA
To avoid fire hazards smoking & open fires strictly prohibited near timber
01
yard (Are No Smoking signs displayed?)
To stack separately
a) Wooden Sleepers
b) Runners
02
c) Ballies / Wooden
d) Plywood
e) Bamboo
To check whether stacking of following items of different sizes are
stacked separately in steelyard with enough space all around.
a) Steel reinforcement
b) M. S. Joists
03
c) Angles
d) Channels
e) Flats
04 The steel items to be stacked over wooden sleepers or raised platform but
not on ground.
05 Adequate Fire Fighting arrangements provided at each storage place
07 Any Oil / Diesel leakages observed in Oil / Diesel storage (Use of trays)
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Doc. No.: CL/CO/DO/PR/HSE/12 REF.: QMS: 7.5.1 / OSHAS : 4.3.1 Pages :Page 1 of 1
Issue No: 01 Issue Date:30th July 2016 I Rev. No.: 00 Revision Date : 30th July 2016
Project Name:
Site: Date:
Location:
For The Month:
Sr. STATUS
Description
No. YES No NA
Tool Box Talk signed copy to be in place (On work related activity should
02 be discussed in local language.
Check and use protective wares such as boots, gloves, goggles, helmet and
05 mask for fumes
To keep ready stock of clean, dry sand or loose earth, adequate supply of
06 Water
Availability of First Aid box for burns (Water to be available nearby work
07 place)
Management Representative
MASTER COPY
Issued By
ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 I ASHOM
I
Health, Safety and Environment Work Instructions
Doc. No.: CL/CO/DO/PR/HSE/13 REF.: QMS: 7.5.1 / OSHAS : 4.3.1 Pages :Page 1 of 1
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Title: Safety measures for First Aid Box
Project Name:
Site: Date:
Location:
Period From: To:
For The Month:
Sr. STATUS
Description
No. YES No NA
PART 1
A sufficie4nt number of eye wash bottles filled with distilled water or
01 suitable liquid clearly indicated with distinctive sign, which shall be visible at
all times.
02 Twenty four small sterilized sterling.
03 Twelve medium size sterilized dressings.
04 Twelve large size sterilized dressings.
05 Twelve large size sterilized bum dressings.
06 Twelve (15 cms) packets of sterilized Cotton wool.
07 One pair of scissors.
08 One roll of adhesive plaster (6mm x 1m)
09 Two rolls of adhesive plaster (2cm x 1m)
10 Twelve pieces of sterilized eye pads in separate sealed pockets.
11 Twelve roller bandage 10cm wide.
12 Twelve roller bandage 05cm wide.
13 One tourniquet
14 A supply of suitable splints
15 Three pockets of safety pins
16 Kidney tray
17 A snake bite lancet
18 Two pairs of suitable sterilized latex hand gloves
19 Six triangular bandages.
20 Stretch bandages
21 One copy of First-Aid leaflet issued by Director General Safety
22 Medicines to kept in First-Aid Box
a. Combiflame for Body ache
b. Avomine for Vomiting
c. Nice for Fever / Body ache •
d. Bi-Quinol for Loose motions
e. Bumol for Minor Burns
f. , Dettol for Cuts / Dis-infections
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Health, Safety and Environment Work Instructions
Doc. No.: CL/CO/DO/PR/HSE/14 REF.: QMS: 7.5.1 / OSHAS : 4.3.1 Pages :Page 1 of 1
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Title: Health Hazard Survey
Project Name:
Site: Date:
Location:
Period From: ' To:
For The Month:
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK - 422 011 ASHOM
Health, Safety and Environment Work Instructions
Doc. No.: CL/CO/DO/PR/HSE/15 REF.: QMS: 7.5.1 / OSHAS : 4.3.1 Pages :Page 1 of 1
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Project Name:
Site: Date:
Location:
Period From: To:
For The Month:
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011
ASHOKA
Health, Safety and Environment Work Instructions
Doc. No.: CL/CO/DO/PR/HSE/16 REF.: QMS: 7.5.1 / OSHAS : 4.3.1 Pages :Page 1 of 1
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Title: House Keeping
Project Name:
Site: Date:
Location:
Period From: To:
Sr.
No. Points to be Check Observation Remark
01 Work place Monitoring
02 Walkways, aisles & all overhead work place cleared of loose
03 Flammable material if any, are cleared
04 All shuttering materials are removed after De-shuttering is done
05 Platforms and walkways free of Oil / grease or other slippery
Collected scrap are brought down or lowered down and not
06
dropped from height
07 Check the segregation area
08 Latrine & Bathroom's cleanliness
09 Employee Rest Room
10 Canteen area
11 Open drain if any, Leakage of pipe if any
Sr.
Points to be Check Observation Remark
No.
06 Crawler boards / Safety system for work on fragile roof are used.
Management Representative .
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011
ASHOM
Health, Safety and Environment Work Instructions
Doc. No.: CL/CO/DO/PR/HSE/17 REF.: QMS: 7.5.1 / OSHAS : 4.3.1 Pages :Page 1 of 1
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Title: Working at height
Project Name:
Site: Date:
Location:
Period From: To:
Sr.
DESCRIPTION STATUS
No.
YES NO NA
01 All the workers have been explained safe working procedures
02 A communication system has been established and explained to the
workers
03 Adequate illumination has been ensured
04 Work area inspected prior to starting of the job
05 Area below the workplace barricaded, especially below hot works
06 Workmen provided with back / box to carry bolts, nuts, and hand tools
07 Arrangement for fasting hand tools made
Access / Egress
Sr.. STATUS
DESCRIPTION
No. YES NO NA
01 Walkways provided with handrails, mid-rails & toe guard
02 All cheered plates, grating properly welded / bolted
Are ladders inspected and weather they are maintained in good
03
condition
04 Are ladders properly secured to prevent slipping, sliding or falling
05 Do side — rails extend 36" above top of landing
06 Are built up ladders constructed of sound materials
07 Rungs and cleats not over 12" on center
08 Proper maintenance and storage
09 Ladders placed at right slope
10 Ladders, staircase welded / bolted properly
11 Any landing provided with handrails, knee rails, toe boards etc.
12 Whether ramp is provided with proper slope
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Health, Safety and Environment Work Instructions
Doc. No.: CL/CO/DO/PR/HSE/18 REF.: QMS: 7.5.1 / OSHAS : 4.3.1 Pages :Page 1 of 1
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date : 30th July 2016
Project Name:
Site: Date:
Location:
01 Cap
02 Hose Pipe
03 Washer
04 Plunger
05 Nozzle
06 Safety Pin
08 Stickers
09 Painting
10 Service Card
11 Other
Management Representative
MASTER COPY
Issued By ONLY IF IN RED
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 1 Revision Date: 30th July 2016
Sr. No. Description of Guideline Identification code for Rev. No & Date
Guideline
Issue -01 Date: 30th July 2016
1 General Safety Rules SOP/CO/DO/PR/HSE/01
Rev. No:00 Date: 30 July 2016
Issue -01 Date: 30th July 2016
2 Handling of materials SOP/CO/DO/PR/HSE/02
Rev. No:00 Date: 30 July 2016
.- Date: 30th J uly 2016
Issue -01
3 Using a ladder, scaffold and staircase SOP/CO/DO/PR/HSE/03
Rev. No 00 Date: 30 July 2016
Issue -01
.- Date: 30`" July2016
4 Working on Heights SOP/CO/DO/PR/HSE/04
Rev. No 00 Date: 30 July 2016
Working in Hoppers, silos and deep Issue -01 Date: 30th July 2016
5 SOP/CO/DO/PR/HSE/05
pits Rev. No.-00 Date: 30 July 2016
Using compressed gas cylinders Issue -01 Date: 30th July 2016
6 SOP/CO/DO/PR/HSE/06
oxygen and dissolved acetylene Rev. No.-00 Date: 30 July 2016
Pressure vessels, lines, valves, and Issue -01 Date: 30th July 2016
7 SOP/CO/DO/PR/HSE/07
checklist Rev. No.-00 Date: 30 July 2016
Digging for trenches, foundations, Issue -01 Date: 30th July 2016
8 SOP/CO/DO/PR/HSE/08
drains etc. Rev. No.-00 Date: 30th July 2016
Issue -01 Date: 30th July 2016
9 Working on a machine SOP/CO/DO/PR/HSE/09
Rev. No.-00 Date: 30 July 2016
Issue -01 Date: 30th July 2016
10 Machine Hazards checklist SOP/CO/DO/PR/HSE/10
Rev. No.-00 Date: 30 July 2016
Issue -01 Date: 30th July 2016
11 Rock drilling SOP/CO/DO/PR/HSE/11
Rev. No:00 Date: 30 July 2016
Issue -01 Date: 30th July 2016
12 Blasting SOP/CO/DO/PR/HSE/12
Rev. No:00 Date: 30 July 2016
General Explosives and Explosions Issue -01 Date: 30th July 2016
13 SOP/CO/DO/PR/HSE/13
checklist Rev. No.-00 Date: 30 July 2016
.- Date: 30`" July2016
Issue -01
14 Operating Shovel/Excavator SOP/CO/DO/PR/HSE/14
Rev. No 00 Date: 30 July 2016
Issue -01 Date: 30th July 2016
15 Operating dumper/Tipper/Trucks SOP/CO/DO/PR/HSE/15
Rev. No.-00 Date: 30th July 2016
Issue -01 Date: 30th July 2016
16 Dumping SOP/CO/DO/PR/HSE/16
Rev. No: Date: 30 July 2016
Issue -01 Date: 30th July 2016
17 Safety precautions on Rope-way SOP/CO/DO/PR/HSE/17
Rev. No.-00 Date: 30th July 2016
.- Date: 30`" July2016
Issue -01
18 Working of stone crushers SOP/CO/DO/PR/HSE/18
Rev. No 00 Date: 30 July 2016
N — -, —
.1.
sior il
14
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011
ASHOM
Health, Safety and Environment Work Instructions
26 First Aid in case of Electric Shock Issue -01 Date: 30th July 2016
SOP/CO/DO/PR/HSE/26
Rev. No.-00 Date: 30th July 2016
v./ li ‘ '
Depart nt Head I 1. 'irector Mana . - '
CONTROLLED COPY
ASHOKA BUILDCON LTD, ASHOKA HOUSE, ASHOKA MARG, ASHOKA NAGAR, NASHIK — 422 011 ASHOM
Health, Safety and Environment Work Instructions
Issue No: 01 Issue Date:30th July 2016 Rev. No.: 00 Revision Date: 30th July 2016
.. .
0
Dep aft Head I S Director Mane"
MASTER COPY
P epared By Approved By IN RED j
dt qtail fte
‘...'
CONTROLLED COPY