Operes3 Non Linear Programming
Operes3 Non Linear Programming
The variable costs are $60 per unit for the sofas and $45 per unit for
the tables. Each item is assembled on site and then inspected
carefully. The inspection usually involves some rework and touch-up.
There are 800 hours available in the assembly department and 500
in the inspection department. Sofas require 2 hours assembly time
and 2 hours inspection time. Tables require 3 hours assembly time
and 1 hour inspection time. The management at NFC wants to
maximize profit under these conditions.
Pricing Problem Example
Interpretation: