0% found this document useful (0 votes)
93 views

OEE, Machine Downtime & Manufacturing Information Systems: Overall Equipment Effectiveness Calculator Spreadsheet

This document contains an Overall Equipment Effectiveness (OEE) calculator spreadsheet for two machines producing Aguila Energy Drink between October 8-17, 2018. The spreadsheet tracks total production, available time, scheduled downtime, unscheduled downtime, operating time, ideal run rate, availability rate, performance rate, quality rate, and overall OEE for each machine. Machine 1 had a 61.9% OEE and Machine 2 had a 73.0% OEE. In total, the two machines produced 610 units with an overall OEE of 67.1%.
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
93 views

OEE, Machine Downtime & Manufacturing Information Systems: Overall Equipment Effectiveness Calculator Spreadsheet

This document contains an Overall Equipment Effectiveness (OEE) calculator spreadsheet for two machines producing Aguila Energy Drink between October 8-17, 2018. The spreadsheet tracks total production, available time, scheduled downtime, unscheduled downtime, operating time, ideal run rate, availability rate, performance rate, quality rate, and overall OEE for each machine. Machine 1 had a 61.9% OEE and Machine 2 had a 73.0% OEE. In total, the two machines produced 610 units with an overall OEE of 67.1%.
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

OEE, Machine Downtime & Manufacturing Information Systems

Date
Ref. Overall Equipment Effectiveness Calculator Spreadsheet
Ref.

Total
Batch or Total Scheduled Unscheduled Operating Ideal Run Availability Performance
Machine
Product
Scrap 1 Scrap 2
Production
Available
Downtime Downtime Time Rate Rate Rate
Quality Rate OEE
Time
1 1 3 298 400 20 78 302 1.25 79.5% 78.9% 98.7% 61.9%
2 2 5 312 400 20 80 300 1.1 78.9% 94.5% 97.8% 73.0%
3 0 0.0%
4 0 0.0%
5 0 0.0%
6 0 0.0%
7 0 0.0%
8 0 0.0%
9 0 0.0%
10 0 0.0%
3 8 610 800 40 158 602 1.18 79.2% 86.2% 98.2% 67.1%
OEE, Machine Downtime & Manufacturing Information Systems

Date October 8 - 17, 2018


Product Aguila Energy Drink Overall Equipment Effectiveness Calculator Spreadsheet

Total
Batch or Total Scheduled Unscheduled Operating Ideal Run Availability Performance
Machine
Product
Scrap 1 Scrap 2
Production
Available
Downtime Downtime Time Rate Rate Rate
Quality Rate OEE
Time
1 1 3 298 400 20 78 302 1.25 79.5% 78.9% 98.7% 61.9%
2 2 5 312 400 20 80 300 1.1 78.9% 94.5% 97.8% 73.0%
3 0 0.0%
4 0 0.0%
5 0 0.0%
6 0 0.0%
7 0 0.0%
8 0 0.0%
9 0 0.0%
10 0 0.0%
3 8 610 800 40 158 602 1.18 79.2% 86.2% 98.2% 67.1%

You might also like