PMP Memory Sheets
PMP Memory Sheets
Initiating (2) Planning (24) Executing (10) Monitoring and Controlling (12) Closing (1)
➢ Develop project ➢ Develop project ➢ Direct and manage ➢ Monitor and control project work ➢ Close project
Project stakeholder ➢ Identify ➢ Plan stakeholder engagement ➢ Manage stakeholder ➢ Monitor stakeholder engagement
management stakeholders engagement
Page 1 © Copyright 2018 McGraw-Hill Education. All rights reserved. Do not duplicate.
1 5 5
B D
6 0 10 11 0 17 18 5 22
Path duration:
A
1 0 5
F ABDF = 22
6 3 8 9 5 13
18 0 22 ACEF = 18
Late start Float Late finish C E
10 4 12 13 4 17
Page 2 © Copyright 2018 McGraw-Hill Education. All rights reserved. Do not duplicate.
To-complete performance index (TCPI) Greater than 1: Harder to complete and meet BAC
Predicts likelihood of reaching BAC (BAC − EV)/(BAC − AC)
Utilizing BAC Less than 1: Easier to complete and meet BAC
To-complete performance index (TCPI) Greater than 1: Harder to complete and meet EAC
Predicts likelihood of reaching EAC (BAC − EV)/(EAC − AC)
Utilizing EAC Less than 1: Easier to complete and meet EAC
EVM Tips
Always start with earned value.
Indexes are “something” divided by “something.” Variances can be positive or negative.
Variance means subtraction.
For any index, the closer to 1 the better. You will have a few EVM questions on the exam.
Page 3 © Copyright 2018 McGraw-Hill Education. All rights reserved. Do not duplicate.
Category 1
Category 2
Category 3
Category 4
Category 5
Control limit
0.0 45 40%
3/13/2017
3/14/2017
3/15/2017
3/16/2017
3/17/2017
3/20/2017
3/21/2017
3/22/2017
3/23/2017
3/24/2017
Lower spec
Assignable cause 40 20%
Out of control
Assignable cause 35 0%
40
35 Quality is a conformance to requirements and a fitness for use. It is fulfilling the project scope.
30 Grade is a category or rank given to entities having the same functional use but different technical
25 characteristics.
0 Gold plating is the process of adding extra features to drive up costs and consume the budget.
1 2 3 4 5 6 7 8 9 10 Quality assurance is a prevention-driven process to do the project work right the first time.
Days in sprint Quality control is an inspection-driven process to keep mistakes from entering the customers’ hands.
Scope creep is the addition of small, undocumented changes that bypass the scope change control
Kanban Board system. Scope creep is sometimes called project poison.
Cost of poor quality, also known as the cost of nonconformance to quality, is the cost of not achieving
To Do Design Dev Test Deploy Done! quality: rework, loss of life or limb, loss of sales.
Prevention aims to keep errors out of the process.
Inspection aims to keep errors away from customers.
Attribute sampling shows if the results conform to requirements or not.
Variable sampling shows the degree of conformity.
Tolerances demonstrate the range of acceptable results.
Page 4 © Copyright 2018 McGraw-Hill Education. All rights reserved. Do not duplicate.
Page 5 © Copyright 2018 McGraw-Hill Education. All rights reserved. Do not duplicate.
Page 6 © Copyright 2018 McGraw-Hill Education. All rights reserved. Do not duplicate.