The document provides a cost estimate for security watch tower civil works including excavation, backfilling, stone soling, plain cement concrete, reinforced cement concrete, plastering, roofing, and other construction items. The estimate includes measurements and quantities of materials needed for the tower foundation, columns, beams, floors, stairs, and roof. The total cost of all civil works is calculated to be approximately $4.62 for excavation, stone soling and PCC works, plus $1.98 for PCC and RCC components.

Uploaded by

hafiz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
271 views

Measurement Sheet

The document provides a cost estimate for security watch tower civil works including excavation, backfilling, stone soling, plain cement concrete, reinforced cement concrete, plastering, roofing, and other construction items. The estimate includes measurements and quantities of materials needed for the tower foundation, columns, beams, floors, stairs, and roof. The total cost of all civil works is calculated to be approximately $4.62 for excavation, stone soling and PCC works, plus $1.98 for PCC and RCC components.

Uploaded by

hafiz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

ABSTRACT OF COST

SECURITY WATCH TOWER

CIVIL WORKS
e Measurements (ft.)
m Description No. Quantities
N L B H
1.0 EXCAVATION
Excavation For Foundations in all 44.098668
kinds of soil,dry or wet, hard or
soft,including backfillingof ecavated
earth in plinth i/c breaking
clods,dressing watering
&consolidatingby ramming in layers
not exceeding150mmdepth to
obtain95% modified AASHTO
density including lifting,shifting or 1 4.26 4.26 2.4 2.439024
1 BACKFILLING
as per instruction&specification of 1 4.26 4.26 2.1 38.654388 M3
###the consultant
STONE SOLING&approval of
client(project engineer) . Contractor
providing
will carryout&laying
compaction300
testmm
as per
thick stone .soling of approved
specification
quality under
foundations,floor&plinth
including hand packing
vertically&filling voids with
spawels, consolidating&
compacting with mechanical
means as per
drawings,specification&instru
ction of consultant&approvel
client(project engineer) .

3.734756
2 Watch Tower area upto PCC 1 3.73 3.73 ### 1.829268
1 Watch Tower area upto Floor 1 1.83 1.83 ###
2 Stair case area 1 2.28 1.83 ###
3 PLAIN CEMENT CONCRETE (1:4:8)
1 Watch tower Base 1 ### ### ### 1.39 Cft
2 Watch Tower Floor 1 1.83 1.83 ### 0.52 3.31E+09
3 Stair case area 1 2.28 2.28 ### #REF! 3.5E+09
3.2 PLAIN CEMENT CONCRETE (1:3:6) 0.00 Cft
3.2.1SITU (1:3:6) 4 1.83 ### ### 0.19
3.3 RCC For Column(1:2:4)
3.3.1Upto Plinth 4
6 Situ (1:3:6) ### ### ### 48.06 Cft
4
7 RCC For Plinth Beam ### ### ### 28.13 Cft
2 ### ### ### 22.50 Cft
2
8 Bitumin Coats ### ### 36.00 Sft
Inside Bed 1 ### ### 120.00 Sft
Inside Wall 4 ### ### 150.00 Sft
Outside Wall 4 ### ### 199.75 Sft
Outside Bed 4 ### ### ### 980.00 Cft
Back Filling 1 ### ### 70.50
Bed Side 4
8 Stone Soling On compacted Soil ### ### ### 18.00 Cft
Watch Tower Area 1 ### ### ### 18.00 Cft
Stair Case Area 1 0.00
9 PCC (1:4: 8 ) ### ### ### 11.88 Cft
Watch Tower Area 1 ### ### ### 11.88 Cft
STAir Case Area 1
10 Floor Finshing ### ### ### 11.88
Watch Tower Area 1 ### ### ### 11.88 Cft
Stair Case Area 1
11 RCC For Column ### ### ### 18.00 Cft
4
Bracing Beam ### ### ### 8.44 Cft
2 ### ### ### 6.75
2
12 RCC For Column ### ### ### 5.06 Cft
4 0.00
13 Drop Bam ### ### ### 17.78
2 ### ### ### 14.22 Cft
2
14 RCC Slab ### ### ### 28.13 Cft
1
15 First Floor Columns ### ### ### 16.88 Cft
4
16 RCC Lintel ### ### ### 18.00
4

17 First Floor Drop Beam ### ### ### 17.78 Cft


2 ### ### ### 14.22 Cft
2 Cft
18 First Floor RCC Slab ### ### ### 57.78 Cft
1
19 Roof Screeding ### ### ### 18.49 Cft
1 0.00
20 PCC Around Stair Case ### ### ### 6.68 Cft
4 0.00
Plaster Around Stair Case B/W ### ### 13.50 Sq.Ft
3
20 Block Masonary
First Floor ### ### ### 117.00 Cft
4
Around Stair Case ### ### ### 31.46 Cft
Front Step 3 ### ### ### 5.63 Cft
1 `
Deduction For Door ### ### ### -12.19 Cft
21 Deduction For Opning (w) 1 ### ### ### -27.00 Cft
Total Deduction 3 -39.19

22 Plaster Work Ground Floor Ceiling ### ### 36.00 Sq. Ft


1
23 Drop Beam insideGF ### ### 37.92 Sq. Ft
4
24 First Floor Ceiling Plaster ### ### 36.00 Sq. Ft
1
First Floor Inside Plaster ### ### 216.00 Sq. Ft
26 4 ### ### 270.00 Sq. Ft
First Floor Outside Plaster 4 0.00
27 Deduction ### ### -36.00 Sq. Ft
window 3 ### ### -16.25 Sq. Ft
Door 1 -52.25
Total Deduction 0.00
28 Bitumin 3 Coats On Roof ### ### 115.56 Sq.Ft
1
2 Layers Roofing Felt Sheet ### ### 231.13 Sq.Ft
2 0.00
2 Layer Pea Gravelling On Bitumin ### ### 231.13 Sq.Ft
2 0.00
0.00
0.00
0.00

Total 0.00 Cft


25.32148

2.134146
3.734756
0.304878 1.829268
0.152439

2.286585
3.734756
2.1 Watch Tower area upto PCC 1 3.73 3.73 0.30 4.2295216
2.2 Watch Tower area upto Floor 1 0.83 0.83 0.15 0.104460632
2.3 Stair case area 1 2.28 0.83 0.15 0.28729824
4.621280472
3 PLAIN CEMENT CONCRETE (1:4:8) 0
3.1 Watch tower Base 1 3.73 3.73 0.10 1.39129
3.2 Watch Tower Floor 1 0.83 0.83 0.10 0.0687241
3.3 Stair case area 1 2.28 2.28 0.10 0.51984
1.9798541