0% found this document useful (0 votes)
96 views

Pipe Support 2 PDF

1) The document provides details on the main gate pipe supports for the NDP KMR Terminal B, including dimensions, quantities of materials, and total weights. 2) It lists 5 items with information on the diameter and spacing of reinforcement bars, number and lengths of bars, and total weight of steel required for each item. 3) The total weight of reinforcement steel required for all 5 items is 237.55 kg.

Uploaded by

hafiz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
96 views

Pipe Support 2 PDF

1) The document provides details on the main gate pipe supports for the NDP KMR Terminal B, including dimensions, quantities of materials, and total weights. 2) It lists 5 items with information on the diameter and spacing of reinforcement bars, number and lengths of bars, and total weight of steel required for each item. 3) The total weight of reinforcement steel required for all 5 items is 237.55 kg.

Uploaded by

hafiz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NTS

NDP KMR Terminal B


Main Gate Pipe Supports

Misc Civil Works at NDP

Main Gate Pipe Supports

Dimensions (meter) Quantity


No's of
S.No Discription Dia of bar C/C Nos Total Unit Total Shapes
bars Length Lengt Weigh kg
Weight
h t
1 Pipe Sport main Gate
Footing main bar T/B & Both way
1/2" 150mm 20 4 1.35 108 0.96 103.68 kg 200 200

1350

Vertical Bar for Column 5/8" 8 4 1.675 53.6 1.576 84.474 kg


1375

300

Rings for column 3/8" 125mm 9 4 1.48 53.28 0.56 29.837 kg


. 370 75

370

Rings for column 3/8" 125mm 9 4 0.97 34.92 0.56 19.555 kg 205
. 205
75

237.55
Total weight kg

Prepared By:Hafiz