BILL OF QUANTITY
MARCH –2019
ANNEXURE
Road Works
Bill No 2 Earthwork
Bill No 9 Miscelleneous
Bill No 10 Horticulture
Structure Works
Package -12
BILL OF QUANTITIES
ROAD WORKS
BILL NO 1 : SITE CLEARANCE
S.No Item Description Unit Qty Rate Amount
Clearing and grubbing road land complete as per Technical
1.01 Ha
specifications Clause 201 265.63
Dismantling including disposal of unservicable material and stacking
1.02 the serviceable material complete as per Technical Specifications
Clause 202
a) Pavement Cum 54.72
Sub Total - Site Clearance
BILL NO 3 : PAVEMENT
Item Description Unit Qty Rate Amount
Providing and laying Granular Sub-base (drainage layer) complete
3.01 as per Technical Specifications Clause 401. Grading–I (Table –400- Cu.m.
2). 44,140.22
Providing and laying Wet Mix Macadam base of required thickness
3.02 on prepared surfacecomplete as per Technical Specifications Cu.m.
Clause 406. 156,277.52
Reuse of WMM from approach sections Cu.m.
Providing bituminous primer coat over granular surface with bitumen
3.03 emulsion complete as per Technical Specifications Clause 502 @ Sq.m.
6.0 to 9.0 kg/10 sq.m. 1,009,357.50
Providing tack coat with bituminous Emulsion all complete as per
3.04
Technical Specifications Clause 503
(i) On granular surface treated with primer and on hungry
Sq.m.
bituminous surface @2.5 to 3.0 kg/10 sq.m. 1,139.00
(ii) On Bituminous surface @ 2.0 to 2.5 Kg/10 sq.m. Sq.m. 2,983,432.50
Providing & laying Dense Bituminous Macadam course of required
3.05 thickness on prepared surface complete as per Technical Cu.m.
Specifications Clause 507 248,915.17
Providing & laying Bituminous Concrete course of required
3.06 thickness on prepared surface complete as per Technical Cu.m.
Specifications Clause 509 with modified bituminous binder 880.80
3.07 Construction of Cement Treated Sub-base Cum 272,422.35
3.08 Construction of Stone Mastic Asphalt Cum 49,351.88
Sub Total Pavement works
BILL NO 9 : .
S.No Item Description Unit Qty Rate Amount
Supply, installation, testing and commissioning of attenuated fully
imported FG WILSON diesel generator set incorporating PERKINS
9.01
ENGINE coupled with FG WILSON Alternator with suitable AMF
Panel 200A contactor including first filling of o
a 125 KVA Set 1.00
b 65 KVA Set 8.00
c 30 KVA Set 8.00
Toll Plaza Administrative , Operation and Maintenance Camp
Building
Construction of Administration Office Building with the following
specification: FOUNDATION: reinforced concrete footing.
9.02 STRUCTURE: Framed structure with concrete columns, plinth and Sq.m.
grade beam, beams and slabs designed for ground and one floor.
Floor he
a) Admin Building Sqm 2,400.00
b) Doctors Quarters Sqm 80.00
c) Medical Aid Post Sqm 100.00
d) Traffic Aid Post Sqm 100.00
e) DG Set Building Sqm 96.00
f) Weigh Bridge Room Sqm 96.00
g) Loading, Unloading Shed Sqm 300.00
9.13 CUSTOMER SERVICE BUILDING
Construction of bore well in all types of soil and strata to provide and
accommadate 150 mm diameter PVC casing pipe by hand augur or
9.03 machine drilling, including developing the bore well, testing and Nos
commissioning. The well should ensre sufficient dischar
8.00
Supply and installation of submersible pump-set, ISI mark of
approved make 2 HP ( two horse power). Including supply and fixing
9.04 of all fittings and GI pipes and electrical cables and connections, Nos
starter etc. complete and testing and commissioning of the
8.00
Construction of Tunnel Lm
9.05 Excavation, side protection, removal & disposal of earth Cum 2,195.06
a PCC 1:2:4 Cum 94.79
9.06 Foundation concrete /Bull Nose Cum 80.00
9.07 M-35 In Structure Cum 354.66
9.08 HYSD/TMT bars MT 28.37
9.09 Structural Steel MT 10.19
9.1 Backfill In Tunnel Cum 465.98
9.1 Parking area Sqm 576.00
9.11 Double arm lighting along the median Nr 125.00
9.12 Highmast lighting Nr 8.00
Other Buildings
9.13 Static Weigh Bridges of (100 Tonne capacity) Nr. 6.00
9.14 Weigh In Motion (WIM) one in each appraoch lane Nr. 16.00
9.15 Halogen Light For Canopy Nr. 4.00
9.16 Road Stud Nr. 1,600.00
Chain Link Fencing Around Toll Plaza Building (Providing and fixing
1.8meters high fencing with iron posts 50 mmx50mmx6mm at 3
meter c/c with 0.4m emdedded in M15 grade cement concrete,
corner, end and every 10th post to be strutted provided with welded
9.17 steel wire fabric of 75mmx50mm mesh and fixed to iron posts by flat Lm
iron 50x5mm and bolts etc. complete in all respects painting 2
coats,drilling holes, nuts and bolts, welding consumably including
cost of all materials, labour, loading and unloading, etc. complete )
400.00
9.18 Toilet Block Construction Sq.m. 480.00
9.19 Cast in Situ M-2 Kerb in Toll Plaza Lm 1,312.00
Providing & constructing service chamber for conduits.with Brick
9.2 masonry wall of 230 mm thick & cover of RCC of 100 mm thick
including steel
a) 600x600x500 Nr. 16.00
9.21 Toll plaza equipment with fitting
9.21.1 Emergency Call Box (ECB) Pairs 14.00
Mobile Communication System
9.21.2 (a) Set
1.00
Base Unit
9.21.2 (B) Nos
1.00
9.21.3 Repeater Station Nos 1.00
BILL NO 10 : Horticulture
S.No Item Description Unit Qty Rate Amount
Avenue Plantation :- Digging of holes, refilling of holes with manure
and good earth, Supply of sapling of plants of approved
varieties/species for a minimum height of 6 feet above ground level
10.01 Nos
as per IRC-SP-21& IRC-SP-103, watering and maintenance till
issuance of Completion Certificate for the Contract Package by
Engineer. 40,000.00
10.02 Compensatory Afforestation Nos 10,000.00
10.03 Planting Flowering Plants and Shrubs in Central Verge Metre 52,642.00
10.04 Planting Flowering Plants and Shrubs in Central Verge Nos 2,814.00
Drip Irrigation System in Median
10.05 Pump Nos 52.64
10.06 Pipe Rmt 52,642.00
10.07 Tube Well Nos 13.16
Sub Total horticulture
Total Amount
Sr.No Item Description Unit Total Qty Rate
(Rs.)
Sinking of Well - pier -
iv) Height upto 10 m m -
Sinking of Well - pier -
v) Height 10 to 20 m m -
Sinking of Well - pier -
vi) Height 20 to 30 m m -
Sinking of Well - pier -
vii) Height 30 to 40 m m -
Sinking of Well - pier -
viii) Height 40 to 50 m m -
-
5 PILE FOUNDATION -
-
Providing and installing cast-in-situ vertical bored piles of following
dia and of approximate depth as per drawing with M35/20 grade of
concrete including all operations such as mobilisation, installation
and shifting of piling rig etc, in all soil strata and roads/footpath
including boulders, kankars and soft rock/ weathered rock, empty
boring, as required. Cutting / chipping of pile upto cut-off level or
upto good concrete and built-up of piles upto required level are also
5.1 included in the item. Disposal of earth, muck, slush, etc. released
from piles, top cut portion of pile at dumping ground as per the
approved methods, specifications and directions of Engineer for all
leads and lifts. (Measurement shall be from cut-off level to founding
level).Reinforcement shall be paid separately .Rate shall include the
cost of required dosage of admixture in concrete for obtaining
required workablity as per specifications & approval of Engineer.
-
a) 1500mm in all types of soil Lm 13,338.00
b) 1500mm in rock Lm 702.00
c) 2000mm Lm -
d) 2500mm Lm -
-
Providing and installation of pile casing of ---mm thickness
5.2
extending from pile cutoff level to ---m below pile cut off level -
i) 1500mm MT -
ii) 1500mm MT -
iii) 2000mm MT -
iv) 2500mm MT -
-
-
Carrying out initial vertical load tests and Lateral load test as per
relevant IS Codes including all arrangements for measuring
5.3 deflections and submitting reports. This includes making of pile
head ready for testing at the desired level, supporting / reaction
arrangement (including reaction piles/soil/rock anchors, if any). -
2.5 times the theortical design vertical load capacity of ----- MT. The
test arrangement to be designed shall cater for additional 25% Each
above the test load -
-
Carrying out routine vertical load tests using relevant IS Codes
including all arrangements for measuring deflections and submitting
5.4 reports. This includes making of pile head ready for testing at the
desired level, supporting / reaction arrangement (incl. reaction
piles/soil/rock anchors, if any) . -
1.5 times the theortical design vertical load capacity of approxinatly --
Each
-- MT. -
-
Non destructive integrity testing of cast-in-situ piles of 1200mm dia
5.5 as per specifications and submitting reports in the approved format. Each
4.00
-
Conducting Dynamic load testing on selected piles of routine pile
5.6 Each
load test,all as per specifications. 13.00
-
5.7 M15 for levelling course Pilecap m3 1,027.08
Providing and laying M 35/20 reinforced cement concrete for
5.8 Cum
Pilecap 14,128.02
-
Total Amount
Sr.No Item Description Unit Total Qty Rate
(Rs.)
-
6 SUBSTRUCTURE -
A. Providing and laying Reinforced Cement Concrete in Sub-
6.1 structure as per drawing, Technical Specification Sections 1500,
1700, 2100, 2200, 2300 and 2700 -
RCC Grade M35 -
i) Abutment shaft m3 5,339.88
ii) Abutment cap m3 2,585.26
iii) Dirt wall m3 957.01
iv) Return wall m3 2,438.79
v) Pier Shaft m3 4,820.29
vi) Pier cap m3 2,519.17
v) For Pedestal / Sesmic Stopper m3 137.47
-
7 SUPERSTRUCTURE -
Providing and laying in position Reinforced Cement Concrete /
Prestressed Cement Concrete in continuous Box Girder, Segment
Construction Box Girder superstructure including providing 75 mm
7.1
dia vent holes in soffit slab and webs complete as per drawings and
Technical Specifications Sections 1500, 1700 and 2300 or as
directed by Engineer. -
i) M-50 Grade in pier table m3 4,725.68
ii) M-50 Grade in precast balanced cantilever segments m3 -
iii) M-50 Grade in precast struts m3 -
iv) M-50 Grade in insitu stitch m3 40,181.56
-
8 REINFORCEMENT STEEL & PRESTRESSING -
Providing and fixing in position TMT Fe 500 Grade Reinforcement in
foundation,substructure & superstructure complete as per drawing
8.1
and Technical Specification Section 1600.
-
Well Foundation -
i) Well Curb T 42.48
ii) Steining T 138.36
iii) Well Cap T 16.39
8.2 Piles T 2,397.15
8.3 Pilecap T 1,412.80
8.4 Substructure T 2,039.58
8.5 Superstructure T 8,893.71
8.6 Foundation T 850.02
High tensile steel wires/strands including all accessories for
8.7 stressing, stressing operations and grouting complete as per
drawing and Technical Specifications -
(a) 19 T 13 cables T 240.00
-
8.8 Post tensioning in superstructure -
a) Longitudinal post tensioning -
i) Strands MT 1,834.60
ii) Corrugated HDPE-102mm ID-cantilever piers RM 54,360.00
iii) Anchorages for 19K15 cables-cantilever piers Nos 2,088.00
b) Transverse post tensioning -
i) Strands MT -
ii) Sheathing- flat RM -
iii) Anchorages Nos -
-
-
9 BEARINGS, EXP JOINT, OTHER MISC -
-
9.1 Providing and fixing bearings 12.00
Spherical (100 Ton) Nos. 276.00
POT PTF Free(100 Ton) Nos. -
Pin Bearing(HL=40 MT) Nos. -
Elastomer Bearing (300x400) Nos. 168.00
Expansion joint complete as per drawing and Technical
9.2
specification. -
strip seal expansion joint m 2,218.50
compressible fiber board type m -
9.3 Structural steel for expansion joints T -
-
9.4 STU, Seismic arrestor, Holding down devices -
Total Amount
Sr.No Item Description Unit Total Qty Rate
(Rs.)
Providing and laying in position Reinforced Cement Concrete crash
barrier / high containment crash barrier including cost of
reinforcement & bituminous fiber board and Polysulphide joint filler
9.5 m
at expansion joints/gap locations complete as per drawings and
Technical Specifications Sections 800,1500, 1600, 1700 and 2700 .
6,552.00
Providing and laying in position 65 mm thick wearing coat consisting
of 50 mm thick bituminous concrete over a 15 mm thick layer of
9.6 mastic asphalt over deck slab after applying prime coat complete as sqm
per drawings and Technical Specifications Sections 500 and 2700
15,525.74
-
A. Providing and laying in position Reinforced Cement Concrete
grade M 30 in approach slabs excluding reinforcement but including
bituminous joint filler with joint sealing compound between approach
9.7 m3
slab and dirt wall / concrete pavements complete as per drawings
and Technical Specifications Sections 1500, 1600, 1700 and 2700
1,249.35
Providing and laying of filter media behind abutment, splayed wing
wall, median wall, retaining wall, return wall and underneath stone
9.8
pitching in slope complete as per Technical Specifications Section
2500 -
i) Abutments m3 9,330.77
ii) Return wall m3 1,456.94
ii) Providing and laying pitching on slopes laid over prepared filter
m3
media 7,919.05
Providing and laying back filling behind abutments, splayed wing
walls, return wall or any other area with selected granular materials
of approved quality complete as per drawings and Technical
9.9 m3
Specifications Clause 305 and Appendix-6, IRC:78-2000 with
following properties:(a) c =0, (b) F >= 30o, (c) g = 1.8t/m3
15,013.87
Providing and laying in position Plain Cement Concrete in levelling
course below approach slabs complete as per drawings and
10 m3
Technical Specifications Sections 1700 and 2700
1,033.91
-
11 DRAINAGE SYSTEM -
Drainage spout fabricated in MS and given hot dip Galvanised
11.1 Nos
coating 756.00
-
12 Weep holes Each 4,922.00
-
Providing and applying 2 coats of water based cement paint to
unplastered concrete surface after cleaning the surface of dirt, dust,
13 Sqm
oil, grease, efflorescence and applying paint @ 1 litre for 2 sq.m.as
per Technical Specification 800 of MoRT&H. -
-
14 Painting of structure number, span arrangement Each 6.00
-
a) 1500mm in all types of soil Lm 2,280.00
b) 1500mm in rock Lm 120.00
c) 2000mm Lm -
d) 2500mm Lm -
-
Providing and installation of pile casing of ---mm thickness
5.2
extending from pile cutoff level to ---m below pile cut off level -
i) 1500mm MT -
ii) 1500mm MT -
iii) 2000mm MT -
iv) 2500mm MT -
-
-
Carrying out initial vertical load tests and Lateral load test as per
relevant IS Codes including all arrangements for measuring
5.3 deflections and submitting reports. This includes making of pile
head ready for testing at the desired level, supporting / reaction
arrangement (including reaction piles/soil/rock anchors, if any). -
2.5 times the theortical design vertical load capacity of ----- MT. The
test arrangement to be designed shall cater for additional 25% Each
above the test load -
-
Carrying out routine vertical load tests using relevant IS Codes
including all arrangements for measuring deflections and submitting
5.5 reports. This includes making of pile head ready for testing at the
desired level, supporting / reaction arrangement (incl. reaction
piles/soil/rock anchors, if any) . -
1.5 times the theortical design vertical load capacity of approxinatly --
Each
-- MT. -
-
Non destructive integrity testing of cast-in-situ piles of 1200mm dia
5.5 as per specifications and submitting reports in the approved format. Each
2.00
-
Conducting Dynamic load testing on selected piles of routine pile
5.6 Each
load test,all as per specifications. 4.00
Total Amount
S.No Item Description Unit Total Qty Rate
(Rs.)
-
5.7 M15 for levelling course Pilecap m3 379.67
Providing and laying M 35/20 reinforced cement concrete for
5.8 Cum
Pilecap 2,597.32
-
-
6 SUBSTRUCTURE -
A. Providing and laying Reinforced Cement Concrete in Sub-
6.1 structure as per drawing, Technical Specification Sections 1500,
1700, 2100, 2200, 2300 and 2700 -
RCC Grade M35 -
i) Abutment shaft m3 181.99
ii) Abutment cap m3 1,599.24
iii) Dirt wall m3 902.63
iv) Return wall m3 -
v) Pier Shaft m3 -
vi) Pier cap m3 -
v) For Pedestal / Sesmic Stopper m3 12.29
-
7 SUPERSTRUCTURE -
Providing and laying in position Reinforced Cement Concrete /
Prestressed Cement Concrete in continuous Box Girder, Segment
Construction Box Girder superstructure including providing 75 mm
7.1
dia vent holes in soffit slab and webs complete as per drawings and
Technical Specifications Sections 1500, 1700 and 2300 or as
directed by Engineer. -
i) M-50 Grade in pier table m3 -
ii) M-50 Grade in precast balanced cantilever segments m3 -
iii) M-50 Grade in precast struts m3 -
iv) M-50 Grade in insitu stitch m3 1,112.86
-
8 REINFORCEMENT STEEL & PRESTRESSING -
Providing and fixing in position TMT Fe 500 Grade Reinforcement in
foundation,substructure & superstructure complete as per drawing
8.1
and Technical Specification Section 1600.
-
Well Foundation -
i) Well Curb T -
ii) Steining T -
iii) Well Cap T -
8.2 Piles T 207.24
8.3 Pilecap T 259.73
8.4 Substructure T 16.38
8.5 Superstructure T 1,481.22
8.6 Foundation T -
High tensile steel wires/strands including all accessories for
8.7 stressing, stressing operations and grouting complete as per
drawing and Technical Specifications -
(a) 19 T 13 cables T -
-
8.8 Post tensioning in superstructure -
a) Longitudinal post tensioning -
i) Strands MT -
ii) Corrugated HDPE-102mm ID-cantilever piers RM -
iii) Anchorages for 19K15 cables-cantilever piers Nos -
b) Transverse post tensioning -
i) Strands MT -
ii) Sheathing- flat RM -
iii) Anchorages Nos -
-
-
9 BEARINGS, EXP JOINT, OTHER MISC -
-
9.1 Providing and fixing bearings -
Spherical (100 Ton) Nos. 16.00
POT PTF Free(100 Ton) Nos. 16.00
Pin Bearing(HL=40 MT) Nos. 8.00
Longitudinal Metallic Guide bearing(HL=80 MT) Nos. 8.00
Expansion joint complete as per drawing and Technical
9.2
specification. -
Total Amount
Sr.No Item Description Unit Total Qty Rate
(Rs.)
strip seal expansion joint m 328.80
compressible fiber board type m -
9.3 Structural steel for expansion joints T -
-
9.4 STU, Seismic arrestor, Holding down devices -
-
Providing and laying in position Reinforced Cement Concrete crash
barrier / high containment crash barrier including cost of
reinforcement & bituminous fiber board and Polysulphide joint filler
9.50 m
at expansion joints/gap locations complete as per drawings and
Technical Specifications Sections 800,1500, 1600, 1700 and 2700 .
1,122.81
Providing and laying in position 65 mm thick wearing coat consisting
of 50 mm thick bituminous concrete over a 15 mm thick layer of
9.60 mastic asphalt over deck slab after applying prime coat complete as sqm
per drawings and Technical Specifications Sections 500 and 2700
10,203.54
-
A. Providing and laying in position Reinforced Cement Concrete
grade M 30 in approach slabs excluding reinforcement but including
bituminous joint filler with joint sealing compound between approach
9.70 m3
slab and dirt wall / concrete pavements complete as per drawings
and Technical Specifications Sections 1500, 1600, 1700 and 2700
508.90
Providing and laying of filter media behind abutment, splayed wing
wall, median wall, retaining wall, return wall and underneath stone
9.80
pitching in slope complete as per Technical Specifications Section
2500 -
i) Abutments m3 858.09
ii) Return wall m3 -
ii) Providing and laying pitching on slopes laid over prepared filter
m3
media -
Providing and laying back filling behind abutments, splayed wing
walls, return wall or any other area with selected granular materials
of approved quality complete as per drawings and Technical
9.90 m3
Specifications Clause 305 and Appendix-6, IRC:78-2000 with
following properties:(a) c =0, (b) F >= 30o, (c) g = 1.8t/m3
-
Providing and laying in position Plain Cement Concrete in levelling
course below approach slabs complete as per drawings and
10.00 m3
Technical Specifications Sections 1700 and 2700
115.49
-
11.00 DRAINAGE SYSTEM -
Drainage spout fabricated in MS and given hot dip Galvanised
11.10 Nos
coating 56.00
-
12.00 Weep holes Each -
-
Providing and applying 2 coats of water based cement paint to
unplastered concrete surface after cleaning the surface of dirt, dust,
13.00 Sqm
oil, grease, efflorescence and applying paint @ 1 litre for 2 sq.m.as
per Technical Specification 800 of MoRT&H. 2,264.50
-
14.00 Painting of structure number, span arrangement Each 4.00
-
2.2 a) 1000mm in all types of soil Lm 823.54
2.3 b) 1500mm in rock Lm 43.34
2.4 c) 2000mm Lm -
2.5 d) 2500mm Lm -
2.6 -
Providing and installation of pile casing of ---mm thickness
2.7
extending from pile cutoff level to ---m below pile cut off level -
2.8 i) 1500mm MT -
3 ii) 1500mm MT -
3.1 iii) 2000mm MT -
iv) 2500mm MT -
-
Non destructive integrity testing of cast-in-situ piles of 1200mm dia
as per specifications and submitting reports in the approved format. Each
2.00
-
Conducting Dynamic load testing on selected piles of routine pile
Each
load test,all as per specifications. 2.00
3.2 -
M15 for levelling course Pilecap m3 163.46
-
Open Foundation -
Excavation for Foundation m3 -
Concrete for Foundation M35 m3 -
3.3 Concrete for Foundation M30 m3 -
Concrete for Foundation M25 m3 -
TMT Bars S 415 MT -
Shuttering m2 -
M15 for levelling course m3 -
SUBSTRUCTURE -
4 Abutments & Piers -
i) M35 Concrete m3 677.90
ii) M30 Concrete m3 -
iii) M25 Concrete m3 -
iv) HYSD reinforcement Fe 415 MT 64.52
v) Shuttering m2 -
Abutment caps & Pier caps -
i) M35 Concrete m3 395.63
ii) M30 Concrete m3 -
iii) M25 Concrete m3 -
5 iv) HYSD reinforcement Fe 415 MT 53.81
v) Shuttering m2 -
Bearing Pedestal -
i) M40 Concrete m3 12.29
ii) M30 Concrete m3 -
6 iii) M25 Concrete m3 -
iv) HYSD reinforcement Fe 415 MT 0.86
v) Shuttering m2 -
SUPERSTRUCTURE -
i) M35 Concrete m3 -
Total Amount
Sr.No Item Description Unit Total Qty Rate
(Rs.)
ii) M30Concrete m3 -
iii) M25Concrete m3 -
iv) M40Concrete m3 2,149.07
v) HYSD reinforcement Fe 415 MT 291.42
vi) Shuttering m2 -
vii) Void Former for 900mm dia m -
7 viii) Void slab M40 m3 -
ix) HT strands Mt 85.96
CRASH BARRIER -
i) M40 Concrete m3 460.40
ii) HYSD reinforcement Fe 415 MT 20.95
8 iii) Shuttering m2 -
iv) Pipe Railing length along with proper fixation of rail posts at the
Rm
intervals of 1.5m length approx -
9 CRASH BARRIER with FRICTION SLAB -
i) M25 Concrete -
ii) M40 Concrete -
10 iii) HYSD reinforcement Fe 415 -
iv) Shuttering -
11 v) M15 Levelling course -
vi) Pipe Railing length along with proper fixation of rail posts at the
intervals of 1.5m length approx -
12 vii) M25 Concrete -
viii) HYSD reinforcement Fe 415 -
ix) M25 Concrete -
x) HYSD reinforcement Fe 415 -
APPROACH SLAB -
i) M30 Concrete m3 169.89
ii) HYSD reinforcement Fe 415 MT 15.29
iii) M15 PCC m3 56.63
iv) Shuttering m2 -
13 WEARING COURSE -
65 thk (40mm BC + 25mm Bitumen Mastic) m2 5,819.74
DRAINAGE SYSTEM -
Drainage spout fabricated in MS and given hot dip Galvanised
Nos
coating 48.00
150 dia PVC downtake pipe Rm -
BEARINGS -
POT PTFE bearing Nos -
EXPANSION JOINT -
Strip Seal type (Total Movement : 40mm) Rm 212.25
RE WALL -
2.0 -7.0 m high wall m2 -
Earth work in excavation m3 -
Backfilling around completed foundation m3 -
PCC levelling pad for RE wall (M15) m3 -
RCC M20 for RE wall coping beam m3 -
Shuttering m2 -
HYSD reinforcement Fe 415 MT -
150 dia perforated PVC Pipes Rm -
RETAINING WALL BEYOND RE WALL -
M25 Concrete m3 -
HYSD Reinforcement Fe 415 MT -
Shuttering m2 -
Surveying LS -
Additional items -
Expansion joint -
Corrugated copper plate in expansion joint Rm -
Compressible fibre board in expansion joint Rm -
Premoulded joint filler in expansion joint Rm -
Sealing compound Rm -
PCC M20 Wearing Course cum -
Tack Coat over Concrete Surface Sqm -
Tack Coat over Bituminous Surface Sqm -
Laying 40mm thick modified bitumen cum 232.79
Wearing Coat 25 mm Thick Sqm -
Filter Media 600mm thk. cum -
Footpath Sqm -
PCC M20 Kerb cum -
PCC M15 for Kerb cum -
Total Amount
Sr.No Item Description Unit Total Qty Rate
(Rs.)
Painting on Kerb Sqm -
Weep Holes Each -
Painting of Bridge No. and span arrangement Per cm ht per Lt 4.00
Subgrade cum -
GSB cum -
WMM cum -
DBM cum -
BC cum -
Seismic Arrester cum -
HYSD MT 97.14
1 Box
i) M30 Concrete m3 5,288.58
ii) M30 apporach slab m3 446.25
iii) HYSD reinforcement (Box) MT 8,230.58
iv) HYSD reinforcement (approach slab) MT 31.24
v) Shuttering m3 9,846.61
vi) Compacted earth below Box m3 73.69
vii) Filter media behind box m3 2,979.20
viii) Filter media underneath stone pitching m4 2,533.19
ix) Excavation m3 3,945.64
x) . Weep holes(box) Nos. 2,210.00
xi) Weep holes(wing wall) Nos. 1,433.35
xii) 20mm thick expansion joint RM 425.00
x) Drainage spouts Nos. 11.56
2 Retaining Wall
i) M20 Concrete m3
ii) M30 Concrete m3 2,535.50
iii) HYSD reinforcement MT 1,217.27
iv) Shuttering m2 713.52
v) Excavation m3 853.20
vi) Weep holes Nos. 235.48
8 Pavement details
i) Tack Coat Over Concrete Surface m2
ii) Tack Coat Over B.T Surface m2
iii) BC 65 mm Thick m3 115.20
iv) Mastic Asphalt 25 mm Thick m2
v) Back Filling with Granular Material m3
vi) Painting of Culvert No nos 10.00
1 Box
1.1 M35 Concrete m3 20,228.65
1.2 HYSD reinforcement MT 2,946.39
1.3 Shuttering m2 26,073.35
1.4 Compacted earth below Box m3 -
1.5 PCC M15 below box m3 1,719.57
1.6 Excavation m3 1,926.84
1.7 100 dia. Weep holes Nos. 59,640.00
2 Return Wall/wing wall -
2.1 M20 Concrete m3 -
2.1a M25 Concrete m3 4,397.61
2.1b PCC M15 m3 973.86
2.2 HYSD reinforcement MT 109.69
2.3 Shuttering m2 -
2.4 Excavation m3 14,607.93
2.5a 75 dia. Weep holes Nos. -
3 PCC Curtain Wall M15 4,753.19
3.1 M15 Concrete m3 -
3.2 Shuttering m2 -
3.3 Excavation m3 8,639.24
3a RCC Curtain Wall -
3a.1 M20 Concrete m3 -
3a.2 Shuttering m2 -
3a.3 HYSD reinforcement MT -
3a.4 Excavation m3 -
3a.5 M15 Concrete m3 -
4 M15 PCC for Box, Base of Return Wall m3 -
5 Pitching / Revetment for Embankment -
5.1 250 thk Stone pitching in C.M 1:4 at Nallah Bed level m2 -
5.2 300 thk Stone pitching for Revetment m3 2,459.07
5.3 750 thk. Stone pitching for Flexible Apron m3 9,636.93
5.4 150 thk. Flat Stone Apron embedded in 300 thk concrete (M15) m2 577.15
5.5 M15 PCC for Floor Apron m3 1,311.23
5.6 Granular Filter material in Revetment m3 1,425.50
5.7 Excavation m3 10,883.20
6 Concrete (Crash Barrier)/Parapet wall -
6.1 M40 Concrete RM 717.60
6.2 Shuttering m2 -
6.3 HYSD reinforcement MT -
6.0a PCC M20 Toe Wall -
6.1a M20 Concrete m3 -
6.2a Shuttering m2 -
6.3a Excavation m3 -
PCC M15 for Toe wall m3 -
PCC M15 for approach slab m3 1,673.96
RCC M30 for approach slab m3 6,891.74
Haunch portion for resing of approach slab m3 1,528.68
Drainage spout Nos. 130.00
-
7 Pavement details -
7.1 Tack Coat Over Concrete Surface m2 -
7.2 Tack Coat Over B.T Surface m2 -
7.3 BC 40 mm Thick m3 1,857.33
7.4 Mastic Asphalt 25 mm Thick m2 1,472.68
8 Back Filling with Granular Material m3 -
9 Painting of Culvert No Per cm Ht Per Lt 65.00