This document outlines the program of works and materials needed to continue construction of the covered court at Waterfall Elementary School for the 2018-2019 school year. It details the quantities of red oxide, welding rod, hollow blocks, crusher, wash sand, angle bars, sea purlins, cement, rebar, galvanized iron, screws, cladding, metal furring, blind rivets, flat bars, turn buckles, tie wire, and hardiflex needed to complete the project.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
771 views
Program of Works of Covered Court
This document outlines the program of works and materials needed to continue construction of the covered court at Waterfall Elementary School for the 2018-2019 school year. It details the quantities of red oxide, welding rod, hollow blocks, crusher, wash sand, angle bars, sea purlins, cement, rebar, galvanized iron, screws, cladding, metal furring, blind rivets, flat bars, turn buckles, tie wire, and hardiflex needed to complete the project.