TCT

The document shows the location of two trial compaction tests for a temporary access road and site facilities layout plan. The first test was located at 24.00 meters and the second, or re-test, was located at 29.80 meters. A diagram displays the locations along with other details of the plan.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
110 views

TCT

The document shows the location of two trial compaction tests for a temporary access road and site facilities layout plan. The first test was located at 24.00 meters and the second, or re-test, was located at 29.80 meters. A diagram displays the locations along with other details of the plan.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Location of

1st trial
compaction
test

Location of 2nd
trial
compaction
test (Re-test)

FGL 24.00m

FGL 29.80m

TEMPORARY ACCESS ROAD AND SITE FACILITIES LAYOUT PLAN

Sarawak Energy Berhad SIBIYU 132/33kV SUBSTATION PROJECT


Contract Ref. No.: PLS- 150129 AS SHOWN
Menara Sarawak Energy,
sarawak energy No. 1, The Isthmus,
93050 Kuching, Sarawak. A1

SIBIYU 132/33kV SUBSTATION


PESTECH SDN BHD
TM No. 26, Jalan Utarid U5 / 14, Seksyen U5,
40150 Shah Alam, Selangor D.E. Malaysia. TEMPORARY ACCESS ROAD AND
SITE FACILITIES LAYOUT PLAN

1st Floor, Lot 1233, Section 66, Merbau Road, Biawak Industrial Estate, PLS-150129-SBY-C- G-CA-0006