0% found this document useful (0 votes)
88 views2 pages

Railway Bridge Engineering Micro Project

This document outlines a micro project to study defects in rails, bridges, and tunnels. A group of students will visit a railway site, gather information on common defects, their causes, and remedies. They will then prepare a report on their findings and present their work. The project aims to increase their knowledge of railway engineering topics and provide hands-on experience. An action plan is provided with timelines showing the selection of topic, data collection and analysis, report making, presentation, and project specification phases.

Uploaded by

Abhijeet Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
88 views2 pages

Railway Bridge Engineering Micro Project

This document outlines a micro project to study defects in rails, bridges, and tunnels. A group of students will visit a railway site, gather information on common defects, their causes, and remedies. They will then prepare a report on their findings and present their work. The project aims to increase their knowledge of railway engineering topics and provide hands-on experience. An action plan is provided with timelines showing the selection of topic, data collection and analysis, report making, presentation, and project specification phases.

Uploaded by

Abhijeet Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

RAILWAY BRIDGE ENGINEERING

MICRO PROJECT
TITLE OF MICRO-PROJECT: - Defects that occur in rails, along with their causes and remedies.

GUIDED BY: - Mr S.S Lallani

AIM OF MICRO PROJECT: - Visit a nearby site and prepare a report on the types of defects that
may occur in Railways/Bridges/Tunnels along with their causes and
remedies.

BENEFITS OF THE PROJECT:-

I. Increase in knowledge related to topic


II. Increases in skills
III. Experience of on-field work

PROPOSED METHODOLOGY:-First a particular site was chosen and authority was requested to
carry out inspection

Information was gathered from the site and workers.

The collected information was edit and presented in a report format

ACTION PLAN (SEQUENCE & TIME REQUIRED FOR MAJOR ACTIVITES):-

SR NO. DETAILS OF PLANNED START PLANNED NAME OF


ACTIVITY DATE FINISHED DATE RESPONSIBLE
TEAM MEMBERS
1. SELECTION OF GaniMukarram
TOPIC AND 1/12/2018 13/12/2018 SaifQureshi
DISCUSSION KshitijMahajan
WITH TEACHER Taukir Sheikh
2. COLLECTION AND GaniMukarram
ANALYSIS OF 14/01/2019 16/01/2019 SaifQureshi
DATA KshitijMahajan
Taukir Sheikh
3. REPROT MAKING 27/01/2019 30/01/2019 GaniMukarram
SaifQureshi
KshitijMahajan
Taukir Sheikh
4. SUBMISSION, niMukarram
PRESENTATION 14/02/2019 15/02/2019 SaifQureshi
AND VIVA KshitijMahajan
Taukir Sheikh
5. SPECIFICATION 01/03/2019 03/03/2019 GaniMukarram
SaifQureshi
KshitijMahajan
Taukir Sheikh

RESOURCES REQUIRED (MAJOR RESOURCES SUCH AS RAW MATERIAL SOME MACHINING FACILTY,
SOFTWARE ETC.)

SR NO. NAME OF SPECIFICATION QUANTITY REMARKS


RESOURCES

1.

2.

NAME OF GROUP MEMBERS & THEIR RESPECTIVE ROLL NO.

ROLL NO. NAME


96 GaniMukarram
97 Tausif Sheikh
98 SaifQureshi
99 QureshiSuhana Aziz
100
101 KshitijMahajan

(SIGNATURE OF TEACHER IN-CHARGE)