SA MP LE: Company Name

This 3 sentence summary provides the key details from the surface preparation and painting inspection report: The report documents an inspection of surface preparation and painting for various items including pipes, pipe spools, structures, and tank plates. It records information such as the surface preparation method, coating specifications, dry film thickness measurements, and acceptance of the painted items based on visual and measurement criteria. The inspector signed off to accept the painting work that was performed by the sub-contractor.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
198 views

SA MP LE: Company Name

This 3 sentence summary provides the key details from the surface preparation and painting inspection report: The report documents an inspection of surface preparation and painting for various items including pipes, pipe spools, structures, and tank plates. It records information such as the surface preparation method, coating specifications, dry film thickness measurements, and acceptance of the painted items based on visual and measurement criteria. The inspector signed off to accept the painting work that was performed by the sub-contractor.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Company Name

LOGO
HPCL-VRMP -VISAKHAPATNAM
SURFACE PREPARATION AND PAINTING INSPECTION REPORT
Unit : Report No: Date:

AREA/LOCATION:

ITEM: PIPE,PIPE SPOOLS,STRUCTURE,TANK PLATE/TANK

Surface Preparation Method Surface profile required : microns


Shot Blasting/ Wire Brush cleaning/ Temperature : 0
C Hygrometer SI No. : Calib Due Date:

Grit Blasting Power brush cleaning Humidity : % DFTgauge SI No.: Calib Due Date:

Coating Method : Brush Coating Roller Airless Spray Conventional Spray (Air Spray)

Paint Specification Batch No. Mfg.date & Shelf life DFT required IMIR No.

Primer paint

Primer paint
Intermediate
coat
Finish coat

Primer coat Intermediate coat Final Coat


Surface profile
Drg. No./ Line No./Spool No. /Eqp. No./ Str. Shop Field 1 coat
st
2 nd
coat 1 coat
st
2nd coat
Sl.No. Quantity
Mark No.
µ Checked DFT ( µ ) Checked DFT ( µ ) Checked DFT ( µ ) Checked DFT ( µ ) Checked DFT ( µ ) Checked DFT ( µ )

E
M PL
SA
REMARKS:
SA
Adhersion test (if applicable) : Acceptable, Not acceptable
Based on visual check, DFT readings, proper color coding & ID mark; painting of above items is accepted.
DESCRIPTION Sub-Contractor EIL/TPIA
Inspector’s name

Signature

Date
Format No:
IMIR No.

t Remarks

2 nd
coat

Checked
TPIA