0% found this document useful (0 votes)
42 views

Sdfds

The document provides a rate analysis for excavation work to a depth of 2-5 meters. It estimates the cost of excavating 30 cubic meters to be 37,791 rupees, which breaks down the costs for labor, machinery, and miscellaneous expenses. The unit cost per cubic meter of excavation including overhead and profit is estimated to be 1,260 rupees.

Uploaded by

risriz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views

Sdfds

The document provides a rate analysis for excavation work to a depth of 2-5 meters. It estimates the cost of excavating 30 cubic meters to be 37,791 rupees, which breaks down the costs for labor, machinery, and miscellaneous expenses. The unit cost per cubic meter of excavation including overhead and profit is estimated to be 1,260 rupees.

Uploaded by

risriz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Rate Analysis

Item Description : Excavation to foundations, maximum depth 2m to 5m. Rate to include for setting
out, leveling, excavating, dewatering, trimming, preparation of excavated surface
and earthwork supports where necessary.

Rate No : R.A. 03

Unit Rate Amount


Description Unit Qty
/(Rs.) /(Rs.)
3
Consider 30 m of excavation

Labour

Skilled Labor Day 2.00 1,500.00 3,000.00

Unskilled Labor Day 4.00 1,200.00 4,800.00

Machinery
Survey equipments Item 1.00 2,000.00 2,000.00

Backhoe excavator Hrs. 1.00 4,500.00 4,500.00

Crawler tractor disposing Hrs. 2.00 2,500.00 5,000.00


excavated material

Miscellaneous

Allow for dewatering Item 1.00 10,000.00 10,000.00

Allow for earth support Item 1.00 6,000.00 6,000.00

Total Cost of Excavation to foundations, maximum depth 2m to 5m for 30 cum 32,300.00

Add 17% on the total cost for overhead and profit 5,491.00
3 37,791.00
The total cost for 30.0 m with overhead and profit
3 1,259.70
The total cost for 1.0 m with overhead and profit

Say, Unit Rate 1,260.00