BPD (Report)
BPD (Report)
In construction to maintain development, For any type of construction at about plot either
by individual or by a company needs permission for the construction from competent
authorities. Without the permission of these authorities any of construction work done or
any changes made in buildings are treated as illegal these authorities have full right to
demolish such encroachment or illegal construction work building bye laws are the
standard rules and regulations which are sanctioned in the formed of plan proposal and
then commencement of construction starts.
4. Literature Review
5. Proposed Methodology
6. Resources Required
(Write about the major resources like raw material, tools, software etc. In study/survey
based projects for data collection Internet connection, Computer can be considered as
resources. USE the given table, add or remove rows as per the number of resources
required in your project. DELETE THIS LINE FROM REPORT.)
Sr. Quan
Name of Resource/Material Specifications Remarks
No. tity
1.
2.
3.
4.
5.
6.
7. Action Plan
(Write about the sequence and time required for major activities for 8 Weeks. DELETE
THIS LINE FROM REPORT.)
Sr. Planned Planned Name of
No Details of activity Start Finish Responsible Team
. date date Members
1.
2.
3.
4.
5.
6.
7.
8.