Name Jawad Rauf Reg No 16BNCIV-0828 Setion A Project Spt/Geo-Tech 2 Group No 4
Name Jawad Rauf Reg No 16BNCIV-0828 Setion A Project Spt/Geo-Tech 2 Group No 4
REG NO 16BNCIV-0828
SETION A
PROJECT SPT/GEO-TECH 2
GROUP NO 4
Bearing Capacity from SPT throug
Borehole Number 28
Borehole Number 152
Borehole Depth (m) 7 CN
Wether liner used (Y/N) 0.8 η1
DWT = Depth of water
table, (ft) 1 η2
Energy ratio for given
equipment (Er) 70 η3
Standerd energy ratio,
(Erb) 70 η4
Drill Rod Length from NSL,
(m) 0.9
Width of Foundation, B,
(m) 1.5
Capacity from SPT through Modified Meyerhof Equations
785.9456
746.9966
740.3862
938.8953