Ws Checklist July 2014
Ws Checklist July 2014
Date: __________________
General
_____ Application and fees paid in full.
_____ Contractor Name and Certification # ________________________________________________
_____ Owner is aware that they are responsible for locating underground utilities .
Alberta One Call (1-800-242-3447)
_____ Owner is aware that they are responsible for flushing all piping system connections prior to
connecting any mechanical device which may be damaged by debris from construction.
_____ Owner is aware that they are responsible for repair of trench settlement and tie-in locations within
1 year of connection.
_____ Ground cover must be a minimum of 2.75 meters and provisions made for frost protection if
ground cover depth is not deep enough.
_____ Water service pipe size minimum ¾”, Type K copper, Kitec or municipal tubing.
_____ All underground connections are brass compression fittings.
_____ Service tie-ins to be inspected before any backfilling.
_____ Trenching and backfilling completed in conformance with OH&S.
Comments