Escs

This document contains an exam for a course on Estimating Quantity Survey and Valuation. It has four questions. Question 1 asks to prepare a detailed estimate for earthwork for a portion of a road based on elevation data provided. Question 2 asks about gross income, salvage value, and ratable value. Question 3 asks about conditions for terminating a contract and notes on earnest money and security deposit. Question 4 asks to calculate quantities for various building items like OBD, PCC, and plastering based on a provided building figure.

Uploaded by

xyz92
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views

Escs

This document contains an exam for a course on Estimating Quantity Survey and Valuation. It has four questions. Question 1 asks to prepare a detailed estimate for earthwork for a portion of a road based on elevation data provided. Question 2 asks about gross income, salvage value, and ratable value. Question 3 asks about conditions for terminating a contract and notes on earnest money and security deposit. Question 4 asks to calculate quantities for various building items like OBD, PCC, and plastering based on a provided building figure.

Uploaded by

xyz92
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Code.

No: 36005
R05 SET-2
JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD
III B.TECH II SEM SUPPLEMENTARY EXAMINATIONS FEBRUARY - 2010
ESTIMATING QUANTITY SURVEY AND VALUATION
(CIVIL ENGINEERING)
Time: 3hours Max.Marks:80
Note: (i) Answer any TWO Questions from PART – A
(ii) PART – B is compulsory
---

PART – A (Marks : 32)

1. Prepare a detailed estimate for earthwork for a portion of a road from the following Data.
[16]

0 114.75 115
50 114.75

100 115.25 Upward. gradient 1 in 100


up to 300 m.
150 115.20

200 116.10
Gradient of 1 in 200 up to
250 116.85 500 m
300 118.00
350 118.25
400 118.07
450 118.80

2. Write about
a) Gross income
b) Salvage value and
c) Ratable value. [16]

3.a) Under what conditions a contract may be terminated. Discuss in brief about each
condition.
b) Write short notes on:
i) Earnest Money and
ii) Security deposit. [8+8]

PART – B

4. Calculate the quantities of the following items for the building shown in figure 3.
a) OBD inside the building.
b) PCC (1:5:10) below the foundation.
c) 12 mm thick plastering inside the building.

• Free Email & SMS


• Solved Question Papers • Expert Advice & Discussion Board
WWW.STUDENTGUIDE.CO.IN • Mock Exams (EAMCET, CAT, IIT, MAT, Gate, etc) • Scholarships & Loans
*******

• Free Email & SMS


• Solved Question Papers • Expert Advice & Discussion Board
WWW.STUDENTGUIDE.CO.IN • Mock Exams (EAMCET, CAT, IIT, MAT, Gate, etc) • Scholarships & Loans

You might also like