DPR Review
DPR Review
REVIEW OF
DETAILED PROJECT REPORT
OF
KESCO
CONTENTS
Sr. No. Title Page
No.
Foreword v
Acknowledgement vi
Scope vii
SECTION – 1 Review of DPR
1.1 Introduction 1
1.2 Strategy for Improvement in Sub-Transmission & 2
Distribution System:
1.3 Existing System 4
1.3.1 Declared Loss 4
1.3.2 Commercial Performance 4
1.3.3 Number of Complaint Centers 5
1.3.4 Single Line diagram 6
1.3.5 EHV Sub-Station 6
1.3.6 HV Substation 7
1.3.7 Connection from EHV to HV sub-station 9
1.3.8 11kVfeeders emanating from HV sub-station 10
1.4 Status on metering on feeders 11
1.5 Status on metering at consumers 13
1.6 Requirement of customer indexing/ metering 15
1.7 Requirement of Capacitors 17
1.8 Requirement of Relays 18
1.9 Statement of Distribution Transformer failure 19
1.9.1 Outage data of feeders on account of DTs 20
1.10 Distribution Transformer R&M (Improvement in LT 21
Sub-station)
1.11 Overloading of the Transformers 22
1.12 Requirement of Power Transformers 23
ii
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
iii
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
iv
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
FOREWORD
In the initial stage of power development in the country, power supply facilities
and Transmission & Distribution (T&D) systems were built mainly catering to
urban areas/ towns to feed mostly domestic and commercial loads. After
independence, with the importance given to power development in the five-year
plan programmes, the extent and reach of electricity has undergone dramatic
changes. With thrust on programme for rural electrification and large-scale
energization of pump sets from 3rd five year plan onwards, the sub-transmission
and distribution networks were expanded rapidly. However, this expansion was
very often without adequate studies to evolve optimal network and this resulted in
characterizing distribution systems with poor voltage regulation and increased
losses. With the implementation of APDRP programme the much needed
improvement in the distribution sector has started taking place. Utilities have
drawn out plans for the augmentation of their distribution and sub transmission
system. Many times the investment required is large. The project report submitted
by the utilities has to be evaluated by the funding agency in terms of the benefits to
the consumers and returns to the power suppliers. The evaluation should be done in
a comprehensive manner to cover all the technical and commercial aspects keeping
in view the global standards and the targeted benchmarks
This report gives comments on the DPR submitted by KESCO to UPERC. This
report is made into two sections. The Section-1 gives a detailed review of the DPR
and Section-2 gives the guidelines for evaluation of proposals under APDRP.
v
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
Scope
A) The scope of the study was to examine the schemes submitted by
UPPCL/DISCOMS for the following:
3. Techno economics
4. Procedural clearances
5. System studies
6. Cost benefits
vi
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
SECTION 1
vii
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
REVIEW OF DPR
viii
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
1.1 Introduction
The detailed project report submitted by KESCO to UPERC for APDRP project
has been referred to ERDA for examination. ERDA has carried out in depth
study of the DPR and examined all the proposals made in the DPR based on the
data submitted by KESCO and the prevalent guidelines. ERDA has also taken
into account its experience as an Advisor Cum Consultant (ACC) for the
APDRP project in the Sabarmati circle of Gujarat Electricity Board and its
experience acquired during the field work for energy auditing services for Agra
(UPPCL) and Kanpur (KESCO) to UPERC while assessing the DPR. The
project report has been examined for its completeness, optimum utilization of
resources, techno-economics and cost benefits
1
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
The long term plan will cover all the measures for improvement of quality
and reliability of power supply and reduction of T & D losses in the circle by
upgradation, strengthening and improvement of the sub transmission &
distribution system in a circle to meet the load demand for next 5 years. The
proposal will be prepared through the proper analysis of the system based
on detailed system studies.
2
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
In the report submitted by KESCO final benefits are given and no basis of
arriving at these figures of benefits are given. Normally, it is expected from
the consultant to give detailed working of each sample where the basis for
computation of benefits is also given. These details are very important
because in absence of these details, problems may occur at the time of
implementation of the project and its assessments when the work is
completed.
3
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
The declared Technical loss is 8 % and it is within the permissible limits and
effort has to be made to reduce the level of commercial loss in the
system. The main factors responsible for high-energy losses are:
4
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
Efforts have been made to increase all the above three efficiencies as
quickly as possible. The significance of the metering efficiency is that all
meters installed at the consumer end should be in running condition so that
true energy is metered.
Fazalganj
Only three complaint centers for four lac consumers is not adequate. Exact
assessment cannot be done but average number of complaints per day is 556
nos. (of all categories), i.e. approximately on an average 185 nos. of
complaints per complaint centre and this appears to be reasonable but time
taken for attending to the complaints is on an average twelve hours. which is
too high. To reduce the time of attending the complaints, number of
complaint centers should be increased and methodology of attending to the
faults also should be improved. Implementation of GIS will also help in
reducing this time.
5
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
The technical data of the circle should include electrical single line diagram
of the system, physical diagram showing geographic location of sub station
and line, single line diagram for each EHV & HV substation, Geographical
diagram showing location of HV sub station, routing of 11 kV feeders and
location of distribution transformer for the feeders which have been
proposed for inclusion.
4 Dada Nagar 20 18
The Azad Nagar, Krishna Nagar and Dada Nagar substation transformers are
marginally overloaded. Hence, effort has to be made to augment the
6
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
1 Kalyanpur 3 3x5 15 17
2 B S Park 2 10+5 15 18
3 Gumti 2 8+5 13 14
7 Naubasta 3 2x10+1x5 25 26
8 Hanspuram 1 1x8 8 10
7
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
Six new substations are proposed to take care of the overloading of the
existing substation which are over loaded.
1) Jawahar Nagar,
2) China Park,
3) Pashupati Nagar,
4) Mandi Parishad,
5) Indira Nagar,
6) Medical college,
The detail as listed below should be given for all the new six sub-stations to
have clear idea at the time of implementation
6) Loss status,
8) Estimates,
8
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
The augmentation of power transformer capacity will take place for above
substations. Also from data submitted by KESCO it is found that
approximately 50 % of transformers are loaded beyond 80 % and above as
per 2.3 of DPR, hence augmentation can also be proposed for the same.
In most of the feeders, the conductor used is Dog and cable of the size 240
mm2 hence the loading is within the limits. According to ERDA study, there
are about seven cases only where the voltage regulation is poor. For
improvement of voltage regulation, nine feeders are proposed in the DPR.
The details of all should be given as listed below:
7) Estimate,
9
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
The power factor (pf) worked out from the readings of MW and MVA will
not be exact but will give indicative idea of the system. The calculated pf. is
in the range of 0.8 to 0.85, which is poor and can be improved by providing
reactive power compensation, which will reduce the losses and also will
improve the voltage regulation
10
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
33 kV 48 20 0 68 0 Nil
feeders
11 kV 265 18 0 226 0 57
feeders
11
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
DT meters considered is only 500 in the DPR. If this is raised to 750, it will
give faster results of energy Accounting and pin pointing the loopholes. The
improvement of metering of the DTs will not directly help in reduction of
losses but will be helpful through Energy Accounting.
12
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
It can be seen that out of 50%(i.e. about 2 lack) customer, only 60200 nos. of
meters replacement is planned which is only 11%. More funds for this
should have been provided for replacing for ex. one lack meters which will
give benefit of 23 units/ installation against capital investment of Rs.1100
lacks i.e. the pay back period will be 20 months.
It is not clear whether the proposed meter replacement plan is for the first
phase or final phase. From the report it is observed that 353760 customers
are having good meters and only 60200 consumers require replacement. But
according to the ERDA report (P-49 of ERDA report), 50 % of the billing
done in KESCO is based on NA / NR / DF / ADF / RDF / CDF where,
NA Consumer Not Available
NR Not Readable,
IDF Instrument Defective,
RDF Reading Defective,
ADF Appeared Defective,
CDF Ceiling Defective
13
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
14
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
KESCO has planned to change 40000 old meters in the domestic category of
consumers and is expecting an annual increase in the metered energy of 110
LU which is a substantial benefit. This will give the pay back period of
4years on investment for buying quality/ static meter.
In the DPR, benefits are shown against the replacement of quality/ static
meter for feeder and DTs but this is not correct. This is only useful for
energy auditing and identifying high loss consumer area as stated on Pg 2 of
15
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
APDRP report for KESCO, while in the same report a benefit of Rs 101.1
lack is shown.
Under the benefit column the basis of the benefit in LU and Rs. Lac is to be
explained for each category. According to the clarification now received
form the KESCO this is their rough assessment. It is felt that this does not fit
in properly. Some scientific reasoning is required.
From the data given in the table that the pay back period is less than two
years, hence it is recommended to divert more funds for this activity for
quick return.
16
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
It is also seen that the power factor or the MVA readings are not the meter
readings but assessed readings by assuming one of the factor i.e. MVA or pf.
17
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
18
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
2 25kVA 29 38 131
3 63 kVA 75 24 32
Major failure rate is for Transformers of capacity of more than 100 kVA.
This is because they are over loaded as shown in10 P-38 of DPR, and action
also is to be taken as per 11.2 P-39 of DPR. This should be given utmost
priority.
19
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
20
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
21
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
It is seen that out of the nine sub-stations only in three substations there is
overloading of the transformer during peak hours as listed below. It is not
clear how the number of hours of overloading is computed.
i) Hanspuram
ii) D. Sujanpur
22
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
The revised cost of the 10.0 MVA Transformers shown as 17.0 lac is also on
the lower side. This may be checked.
23
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
(b) The cost of 11 kV new line is taken as Rs. 22 Lac./ kM, which is too
high.
(d) If this includes the use of higher size conductor and adding supports, if
required, the cost shown appears to be less.
(e) New LT lines using (ABC conductors) are configured for three wire
systems but the conductor size is not specified.
24
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
25
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
1.15 Conclusion
The DPR review has brought out the following observations:
1. Acceptable bench mark norms for losses are not specified and the
projected loss reduction due to implementation of suggested schemes
may not be realistic.
3. The cost figures used for new feeders, strengthening of feeders new
transformers and substations appear to be on the high side.
26
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
27
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
SECTION 2
28
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
29
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
2.1 Introduction
In the initial stage of power development in the country, power supply
facilities and Transmission and Distribution (T&D) systems were built
mainly for catering to urban areas/ towns to feed mostly domestic and
commercial loads. After independence, with the thrust given to power
development in the five-year plan programmes, the extent and reach of
electricity has undergone dramatic changes. With the thrust on programme
for rural electrification and large-scale energization of pump sets from the
3rd five-year plan onwards, the sub-transmission and distribution networks
were expanded rapidly. However, this expansion was very often without
adequate studies to evolve optimal network, size and location of sub-
stations, adequacy of back-up sub-transmission etc. Further the rise in
industrial and agricultural pumping load increased the reactive power
requirements. Adequate attention has not been given to compensate this
reactive demand, which resulted in poor voltage regulation and increased
losses. Hence, distribution systems are characterized by high T&D losses,
poor voltage conditions, frequent interruptions/ outages etc.
The sub transmission and distribution system was completely neglected and
haphazard expansion was done without any planning which resulted in
extremely poor quality of system with high losses in the system . Ministry of
Power (MOP) decided to give top priority for the improvement of
distribution sector and came out with a scheme known as Accelerated Power
Development Programme (APDP), which is now termed as Accelerated
Power Development and Reforms Programme (APDRP). MOP initially
identified 63 distribution circles belonging to different states for improving/
30
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
31
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
The technical losses are due to energy dissipation in the conductors and
equipments used in the system for transmission and distribution of power.
The magnitude of energy dissipation depends largely on the design of lines,
pattern of loading of transmission and distribution lines, types of loads,
equipments (transformers), etc. It is not possible to eliminate such inherent
losses in a system altogether. This could, however be reduced to some extent
by better design of lines, re-location of distribution sub station, installation
of capacitors, use of higher efficiency transformers and regular system
upgradation. The typical level of losses in the various segment of the system
could be considered as under :
32
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
These losses depend on the pattern and nature of demand, load density and
the capability and configuration of system; equipment used and vary for
various system elements. However, systems where total percentage loss lies
beyond these range of values should become a matter of serious concern and
further study and analysis should be carried out. Targets for reduction of
technical losses should accordingly be fixed, measures identified and action
taken to accomplish the same within the given time period
(1) Set up vigilance squads comprising engineers and police officers for
conducting surprise check at the consumer premises to detect
pilferage of energy and intensify surprise inspections/ raids, to detect
cases of malpractices and pilferage of energy.
(3) The special vigilance groups for tracing the unauthorized consumers
and direct tapping from lines may inspect the feeders periodically.
33
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
(4) Severe penalties may be imposed for tampering with the meter seal
etc.
34
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
For proper energy billing, revenue collection and analysis of large volume of
energy related data, it is necessary to install “Computerized system” at each
billing center.
The system should have an on-line browsing consumers’ ledger, apart from
other facilities.
35
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
The responsible officer of the Circle may ensure that HT bills are issued
directly to the respective consumers and the revenue is realized by due date.
As soon as bills are prepared and distributed, list of consumers who are in
arrears may be printed through computer billing system for taking action of
disconnection.
36
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
25,000/-) and period wise (arrears for period less than 3 months, 3 to 6
months and more than 6 months).
In order to identify the revenue loss in a circle, revenue balance sheet may
be prepared. This may be computed by taking into account the total energy
received in a circle and its average cost at the receiving points as well as
revenue realized from consumers for the same period.
The revenue realized may be worked out from the figures of energy
consumed by various consumers and tariff applicable in their case.
37
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
The benefits due to replacement of meters depend upon many factors but it
is observed that on an average 22.5 units extra energy is recorded per month
per installation. This can be taken as a norm for assessing the cost-benefits
involved.
The utility has to identify pockets where the losses are more and
immediately replace all the meters in that area.
38
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
It has been proved by field studies that faulty status of the meters, age of the
meters, improper connections of CT units, inadequate metering etc. add
directly to the losses in the system. In a particular feeder under survey, when
quality meters replace the old meters, the energy billing can be increased.
2.4.2 Billing
39
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
4 From 10 kW up to 50 kW 1.0
5 Below 10 kW 1.0
40
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
The analysis of data is useful to expedite billing and reading activity, which
will be carried out without human intervention. Detection of theft and mal-
practices is easier. TOD metering features would also help in introduction of
suitable tariffs, which would enable demand side management to reduce
peak demand on system.
41
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
The meters of domestic light & fan are likely to be tampered as the present
installations provide easy access to incoming power cables, which leads to
tampering. In addition to meter seals, a metallic enclosure with a viewing
window and locking facility for the meter installation is recommended. The
meters could be located so that it becomes easily accessible without having
to go into the living area of premises.
This would facilitate regular reading of the meter regardless of whether the
premises are occupied at the time of the meter reader’s visit, by avoiding the
need for the meter reader to enter into the premises.
It is necessary to ensure that the prime means of billing for the utility,
namely, the energy meters are checked regularly for accuracy. The meter
testing facilities need to be modernized and augmented as per anticipated
42
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
testing load. Portable site meter testing kits are available which should be
used to carry out surprise and spot checks.
The computer software to be used for meter records should have the
following minimum objectives.
Record for each meter may have the following information about the meter:
1. Make
2. Model/ type
3. Serial Number
7. Connection number
9. Dates of Repair
43
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
(ii) Providing cut outs/ MCBs after the meter as per sanctioned load and
use of multi-core P.V.C. cables.
44
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
• HT meters:
The testing schedule for HT consumers should cover the entire metering
system including CTs, PTs and pilot wire. Detailed ratio testing of CTs and
PTs is to be done. Testing through mobile cubicles through secondary
injections kits and phantom loading may also be carried out.
45
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
Till such time, 100% meters are provided to the un-metered class of
consumers, meters may be provided on LV side of selected distribution
transformers feeding say, predominantly agriculture consumers or
consumers without meters and theft prone areas. These meters should also
be 0.5-class accuracy with load survey capability, data logging features and
downloading facilities. This would enable correct estimation of utilization
pattern (average consumption/ consumer or per kW) of consumers on that
distribution transformer. However, care should be taken to select the
transformers for metering in such a way that it capture and address the
consumer metering deficiencies.
46
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
The practice presently followed is to compile the energy sent out and
energy-billed figures based on the feeder panel installed meters. However, it
is suggested to follow this practice to downstream also to have the proper
energy accounting, location wise.
47
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
1) Consumers who are existing but not present in the ledgers of the utility
4) By actual site survey (i.e. consumer indexing) the utility can find the
following types of consumers. 1) Metered consumer, 2) Unmetered
consumption of rural domestic consumers and 3) Unmetered
consumption of agriculture consumers. By site survey the connected load
of unmetered consumers can be found for each and every consumer.
Hence norms of consumption per kW connected load can be found out
and hence assessment of unmetered consumers can be done more
accurately.
48
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
One of the main objectives under APDRP scheme is to ensure quality power
to the consumers by targeting reduction in outages and losses in distribution
system. A review on distribution transformers is found essential because
loading on transformer is to be studied against growing demand of
connected consumers. In the case of overloading of DTC, it is necessary to
propose new distribution transformers or the same may be shifted near to the
load center, so that quality of power supply can be improved.
49
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
In addition some new transformers would be required and some would have
to be augmented. Attempts should be made to locate the distribution
transformer as near to the load center as possible. It may not be possible to
determine the actual location where these are to be installed. However, for
the purpose of the scheme, expected load growth indications would have to
be considered for determining number and location of the distribution
transformers.
50
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
In case the load on a sub station is found to exceed the rated capacity of the
transformer, it becomes necessary to upgrade the power transformer or add a
new transformer. In many cases, it is not technically possible to bifurcate the
feeder from the same sub station. It becomes necessary to install new power
transformers at the existing substation. The projected load growth of a
substation should be available for future planning.
51
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
2.9 Capacitors
2.9.1 Requirement of capacitors
It is seen that the power factor or the MVA readings are not the meter
readings but assessed readings by assuming one of the factor i.e. MVA or pf.
The capacitor bank shall be complete with neutral CT/ RVT and series
reactor as required. Circuit breaker, offload isolators, instrument
transformer, control and relay panels, connecting material and any other
material required for capacitor bank may be included in the scope of supply
of capacitor bank supplier or procured separately by the purchaser.
2.9.3 LT capacitor
Shunt capacitor are the simplest and cheapest way of managing the reactive
power. Agricultural pump sets and LT motor loads operate at very low
power factors (0.6 to 0.7) causing reactive power mis-management and
voltage profile problems in the system and thereby increasing system losses.
It has been realized that the installation of LT capacitors close to the
consumer load would (1) reduce load current in the LT feeders. (2) reduce
the overloading of distribution transformers, 11kV lines and back up system.
52
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
requisite knowledge and skill to decide the level of compensation and check
the healthiness of the capacitors. This problem can be taken care of by
providing LT capacitors on distribution transformers. However, the
changing load demand characteristic poses problems in deciding on the level
of compensation. The experience of the power utilities with switched
capacitors has been satisfactory. To overcome this problem, it would be
worthwhile to provide minimum level of fixed compensation at the LT level
to meet the average demand conditions and prescribing for higher nominal
voltage (+10%) to ensure safe operation under possible adverse conditions.
The balance requirement could be met by placing capacitors on 11kV
feeders wherever the site conditions permit. It is, therefore, recommended to
have 440V, 3 phase delta connected 50 cycles, outdoor type LT fixed
capacitor unit intended for power factor improvement to be installed on the
LT side of distribution transformers
LT fixed capacitor
Capacitor units shall comply with ISS: 2834/1986 (with latest version/
amendments) and ISS 13340/1993. The material shall be ISI marked.
Standards
The shunt capacitor banks and associated equipments shall conform to the
latest edition of the following standards (as amended up to date).
53
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
54
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
With the substantial increase in load demand expected in the plan period, the
system would need strengthening and augmentation to ensure delivery of
power to the consumers at proper voltage and for reduction of losses to a
reasonable level. For the development of the system, the future load
demands are worked out and imposed on the existing system to assess the
inadequacy of the system for meeting the demand in the horizon year. This
system augmentation/ strengthening is then worked out to cover the
inadequacy of the existing system to meet the proposed demand.
Sub – Transmission
55
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
Planning for site of substation and feeders in rural area should be based on
the load survey, and load centers in the village. The geographical maps of
village/ taluka showing the location of well, village streets, clusters, existing
diesel based industry/ cold storage etc. would have to be plotted ultimately
for use in optimal planning of network for the rural area.
The various options for the sub – transmission system are evaluated on
techno-economic considerations to decide on the final alternative. The load
flow studies would give the losses for the various alternatives and total cost
of each alternative would then be worked out based on capital cost of each
alternative and the cost of losses.
56
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
To evolve the least cost alternative, subject to their meeting the technical
requirements, the total owning cost of various alternatives should be
estimated.
After identifying the scope of work and estimation of losses under various
alternatives for sub-transmission system, the least cost optimal solution may
be worked out considering the capital cost of proposed works and net
present worth of peak and energy losses over the expected life of the
equipment. The cost benefit ratio can then be worked out for each of the
proposed work.
Distribution system
The voltage regulation and the power losses along each feeder section upto
distribution transformer would have to be worked out. Based on the results
of studies (using the software), the feeder section requiring reconductoring/
addition of new feeder and its conductor size may be decided. It may be
ensured that the voltage is within the limit at the each node/ distribution
transformer.
57
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
In addition, some new transformer would be required and some would have
to be augmented. Attempts should be made to locate the distribution
transformer as near to the load center as possible. It may not be possible to
determine the actual location where these are to be installed. However, for
the purpose of the scheme expected load growth indications would have to
be considered for determining number and location of the distribution
transformers.
d) Availability of load
58
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
h) Estimates
i) 11/6.6kV feeder map with existing position
j) 11/6.6kV feeder map with proposed diagram
Sub-station layout
Single bus bar, single bus bar with bus sectionalizer, double bus bar
arrangement are being adopted depending upon the situations. A layout,
which is most economical and satisfies technical requirements as per actual
site conditions may be adopted. Generally, 33/11kV sub-station with single
bus bar and a sectionalizer in between on the 33kV as well as 11kV sides is
being adopted.
The overall planned system subject to meeting the technical requirement for
supplying quality and reliable power supply to the consumers should be of
59
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
least cost (considering the capital cost of proposed works and capitalizing
the cost of losses over the life of the equipment out of various alternatives
considered).
THE FOLLOWING FORMULAS CAN BE USED FOR CALCULATION OF
LOAD FACTORS, LOSS LOAD FACTORS e.t.c
2
Losses = 0.105 x Load x Dist x R x LLF
2
2 x LDF x DF
2
LLF = 0.8 ( LF ) + 0.2 ( LF )
WHERE :
60
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
• Project Management
• Performance Evaluation
• Metering system
• Energy Audit
61
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
• Planning Criteria
62
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
63
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
programs are used. Future transmission system will be far more complex
than those of today. This means that the power system planner’s task will be
more complex. If the systems being planned are to be optimal with respect to
construction cost, performance, and operating efficiency, better planning
tools are required. In general, the major power system planning tools are:
Load Flow analysis, short circuit analysis, Stability analysis and system
protection and relay co-ordination.
After determining the best configuration from load flow study, the power
system can be tested for system behavior under fault conditions. The main
objective of short circuit study can be expressed as to determine the current
interrupting capacity of the circuit breaker so that the faulted equipment can
be disconnected successfully. To establish the relay requirement and settings
to detect the fault and cause the circuit breaker to operate when the current
flowing through it exceeds the maximum allowable current, to calculate
voltage during faulted conditions that affect insulation co-ordination and
lighting arrester applications, and to design the grounding systems.
64
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
Stability studies are performed in order to be sure that the system will
remain stable following the clearance of a severe fault or disturbance on
transmission line. Stability analysis is defined as the transient behavior of
the power system following a disturbance. The transient stability is defined
as the ability of the system to maintain synchronous operation following a
disturbance, usually a fault condition. These studies are necessary in order to
ensure that the wide variety of protective relays function correctly with
proper discrimination to provide required reliable, sensitive isolation of
faulty power system equipment.
65
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
Thus, the augmentation of power transformer / sub station / feeder can take
place depending on the future load growth. By augmentation of power
transformer & new power transformers possibility of overloading can be
reduced.
66
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
67
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
The power utility shall formulate the scheme for each circles either
utilizing in house expertise or through consultant.
68
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
The short-term plan shall cover the measures required for immediate
improvement and reduction of losses and shall be placed upon the
information / data readily available with the utilities. The work identified as
short term should be completed within 1 to 2 years.
The long term plan will cover all the measures for improvement of quality
and reliability of power supply and reduction of T & D losses in the circle by
upgradation, strengthening and improvement of the sub transmission &
distribution system in a circle to meet the load demand for next 5 years. The
plan will be prepared by scientific planning of the system on the basis of
detailed system studies.
69
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
70
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
b) Acquisition of Land
c) Approval of financing
71
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
o) Licensee must standardize the formats and have the budgetary cost
data bank, update periodically.
72
Study by ERDA on review of DPR of KESCO DATED 23rd FEB 2005
2.17 Conclusion
Methodology for over all assessment of the status of the ST&D is discussed.
Various components of the system that contribute to the losses are identified
and the need to augment/ change those equipment and the process of doing
those are explained. Short term and long term planning objectives are
outlined and the guide lines for making proposals for system improvement
are given. Importance of analyzing these schemes to achieve optimal
performance at least cost is stressed. It is expected that the Commission
would use the material presented here for evaluation of schemes submitted
under the APDRP for the improvement of distribution systems in UP.
73