0% found this document useful (0 votes)
165 views

Document Transmittal: Hard Copies Soft Copy CD Notes

This document transmittal provides information for the Burjeel Speciality Hospital project in Sharjah. It lists no attached documents and includes signatures and dates from those receiving and approving the transmittal from various project partners, including the consultant, contractor, and client. The engineers/consultant comments and approval section is blank.

Uploaded by

Adnan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
165 views

Document Transmittal: Hard Copies Soft Copy CD Notes

This document transmittal provides information for the Burjeel Speciality Hospital project in Sharjah. It lists no attached documents and includes signatures and dates from those receiving and approving the transmittal from various project partners, including the consultant, contractor, and client. The engineers/consultant comments and approval section is blank.

Uploaded by

Adnan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DOCUMENT TRANSMITTAL

Transmittal No. : TECH-16016-HO-16-00001 Revision : 00


Project : Burjeel Speciality Hospital - Sharjah Date : 25-Aug-2016
Subject : Project No. : JB/AD/16016

List of Attached Documents:


S.N. Ref. Rev. Description Hard Copies Soft Copy CD Notes

Checked & Submitted by: (ARCO - QA/QC) Consultant - Received by: (RATEC)

Date: Date:
Signature: 25-Aug-2016 Signature: 25-Aug-2016

Checked & Submitted by: (ARCO - PM) Project Management - Received by: (AMS)

Date: Date:
Signature: 25-Aug-2016 Signature: 25-Aug-2016

Engineers/ Consultant Comments & Reply (RATEC) :

Approved :  Approved as Noted :  Revise & Resubmit :  Rejected : 

RATEC ARCO - Received by:


Project Manager Date: Date:

Signature: Signature:

Distribution:-
Sub - Contractor :  Contractor:  Consultant :  Client/Project Management : 

1 DMS-DOC-001

You might also like