100% found this document useful (1 vote)
229 views

Method Statement For Tiling Work

Method Statement for Tiling Work

Uploaded by

Srdjan Kitanovic
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
100% found this document useful (1 vote)
229 views

Method Statement For Tiling Work

Method Statement for Tiling Work

Uploaded by

Srdjan Kitanovic
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 5
ane2o1s Home Download Method Statements ~ De MS kee ety Vintage Watch auction catawiki Method Statement For Tiling Work ‘AdpiyGooo > Vial Tie» Show Tip Tino» futher Tle Wal finishes Proparatory Works + Ceramic ties type Boor. mertar mix, gue, grout, shop erawings ‘and metnod of Applicaton shal be approved by the CONSULTANT. + Ensure thal delivered materials from approved manufactures and in ctgial labeled packing + Mock up shall be arranged for wall and floor tes at location ‘designated by the CONSULTANT forthe final approval TTR shallbe raised for the CONSULTANT's inspection and approval ofthe Mack up. + Approved mock up and sample shal be avaiable at site and the materials delvered to site shall be checked with respect to the approved sample. + Ensure the MEP clearance obtained, al laying shall be (CONSULTANT prir to start of ting works + Working area tobe restricted for unauthorized entry. + The surface to whieh tes are to be fixed shall be thorough¥ ary before fixing commences and fee from all detects. under installations approved by the + The areas to be tied shall be brushed clean and all aces of grease, oll nose particle etc. must be removed. + Ensure that the laying of ties shall be as per the direction and patter agreed wi tne CONSULTANT. + Before laying tes obtain approval of seltng out by CONSULTANT, Provide symmetty about center ines of the space or areas and adjust o minimize te cating. + Lay out tle work so tates less than 1/2 full size do not occur and with minimum of cuting. Carefuly grind edges of ext te, Ensure cut tes are in comers and are equal an each wall face. + Tile layout on floors / walls shall follow the layout on floors / walls a8 er approved shop drawings WORKMANSHIP + For concrete block walle and concrete walls to be fished with Le, apply a levetng coat of plaster minimum 12 mm thick, suficent 0 cover the unevenness of the substrate and to make walls {rue vetia + Plaster shall be fished rough inorder to have a strong key fr ting works, + Plaster curing period shall be competed before start o ling work + To ensure rows of thes are ty horizontal, a level tne shall be established to poston the slartng course. + Tiles of spectied and approved sizes shall be fied to wal surfaces iptv methodstatemertha.com/methee-statement-or-tling-work Him Senet Sd Method Statement Fer Tiling Work oi mee Coe rs %§ G@@ START A CONVERSATION SUBSCRIBE Enter your ema odes: Subsenbe Dative by Feectiumer “We recommend these Project Management Templates fr dlivern ‘your projets success." beer POPULAR METHODSTATEMENTS: Download Method Statement for Installation Of Structured Cabling System ‘ust Mh, 2015 ‘Downoad Method Statement fr Irsaiation OF Stretred Cabling System Doweload package contains [..] Download Method Statement for Installation Of Fi Resistance Cable for Fire Alarm & Emergency Lighting Systems ‘uapst TM, 2015 Download Meth Statement fr Irsalation OF Fe Resistance Cable fo Alm & Emergency |. Download Method Statement for Testing & ‘Commissioning Of UPS System ‘August 7h 2005 ‘Download Method Ststement fr Testing & Commies DDoweload package contain [.] UPS Syste Download Method Statement for Testing & ‘Commissioning Of Diesel Genorator Sot ugnst Mh, 2005 Download Methd Statement fr Testing & Commissioning OF Diesel (Generator Set Oomioad package | List Of Mandatory Tests For Transformers 15 ane2o1s Method Statement For Tiling Work by approved adhesive, + Maing of adhesive shall be strilly felowed in accordance wit ‘manufacturer's recommendations, “The followig routine tests speed in IEC726 shall be cared out a the manufsturere wore on [.) + Morlar shall be used wihin 2 hours of mixing at normal | List Of Common Tests For Diesel Generator Testin| temperatures or within the pot Ife of the mix whichever is achieved | august sth, 2015 carl ‘The folowieg st tests shal be cari cut in eer to determine whether + Materia shat not be used afer inal st has taken place oCiaraetueee + Thin Bed Adhesive-Walls: Apply fates coat of adhesive to dy background in areas of approximate + M? and comb the surface | Method Statement For Testing And Commission vin the recommended sold bed trowel. Apply thn even coat of | Of Laboratory Air Flow Control System & Fumes athesive to backs of dy tes. Press Hes onio bedding wih | Hood Monitoring wisting/taing acon to give finshed bea thekness of not more than | uy 27h 2015 3mm, ‘Below the method statement deseripion fr performing the testing and + ¢, Thick Bed Adhesive-Walls: Apply floated coat of adhesive to sty | commissioning of tbortey background and comb the surface with the recommended solid bed trowel Fill any keys and apply thin even coat of adhesive over the entre back ofeach tie, Press tes onto bedding with twstngsliding facton to lve finished bed thickness win the range recommended by the manufacturer “+ Tamp the tle with rubber mallet to oblain requied adhesion and level + Tiles shall be laid with required spacing and spacers shall be used to align horizontal and vertical joints, “Lay ile fo pattern in accordance with Shop Drawings. Verty pattern Is uninterrupted through openings + Establish nes of borders where applicable + Excessive mixadhesive shall be removed with a damp elth before the material has st. + The verteal ins shall be maintained plumb forthe entire tru level ane plane by uniformly applied pressure. + Joints in glazed wall tes and fitings, ater edges of ties have been thoroughly wet (fier 48 hours late) t shall be grouted wih nest ile or colored approved grout + Grout shall be applied to the spaces between the tikes using 3 sponge or a small piece ofthe sof cloth. + Ensure that joints are 6 mm deep (or the depth ofthe tle if less fang are ree from dust and debris + Force grout and fil joints complete’ to entre depth, tool to an approved prot, clean off surface and leave tree from blemishes. + Rub wall ting wih a dry cloth when joints ave hard + Keep expansionicontraction and control joints fee of mortar of grout + Control Joints: Provide Contral Joints Gm minimum with in large tle ateas at a maximum of 4.5m in each diecton and at the perimeter walls. Do not saw-ct joints aftr installing tes. + Movement joints shall be located as required and be carried through backing tothe structural wal, partially fll wih strp and frish tush vith sealant tothe manufacturers recommendations. + Ting shall be protected from heat and inclement weather untl {ainting has completely et Floorfinishes PREPARATORY WORKS. + Ceram ties type Boor, mertar mix, glue, grout, shop erawings iptv methodstatemertha comimethad-statement-for-tling-workHiml ane2o1s Method Statement For Tiling Work {anc metnod of Appleaton shall be approved by the CONSULTANT. + Ensure thal delivered materials from approved manufactures and in ctginal labeled packing + Mock up shall be arranged for wall and flor ties at location esignated by the CONSULTANT forthe final approval. + Approved mock up and sample shall be available. materials delvered to site shall be checked with respect to the approved sample, sie and the + Tis of approves s2es shal be used for fying + Enaure the MEP clearance obtained + Restrict the working area to prevent unauthorized entry + The areas of substrate to be ties shall be brushed clean and the {rished oor level shallbe established by means of dts + Allvaces of grease ol and loose particles ete. must be removed. + tn wet areas check that approved Water proofing is completed as er Manufacturer's instruction and teted fr leakage, + Ensure that the laying of tiles shall be as per the direction and pattern agreed wih tne CONSULTANT. + Seting out shall be done by the surveyor and approved by the ‘CONSULTANT. + Before laying ties obtain approval of setting out by CONSULTANT. Provide symmelty about center ines of the space or areas and Adjust to minimize te euting + Ting shouldbe started from the stat point as fixed on the approved shop dravings. + Lay out tle work so that Hes less than 1/2 fullsize do nol occur and with minimum of cuting. Carefuly grind edges of cut te, Ensure cut tes are in comers and are equal on each wall face. Workmanship + Proparation of Floors: Castinplece concrete substrates shall be suffcienly smooth and level such that when thin-set mortar to accop ties i applied, no voids under the tks occur. Grind of high spots and flln low spots as necessary o ensure no voi occur + Floor Wator Proofing Application + Altos & panties to receive water proofing + App the quid waterproofing at a rate of minimum 1.5 kglm2on horizontal surface and extend at least 100mm high on vertical surfaces or as per the approved shop drawings and method statement detail + Before instalation of porcelain te, place @ 1900 gauge polythene sheet protected by 10mm mortar layer and coordinate flor water proofing works wit the porcelain tes installer. + Testing shall be before and ate the installation of tes. + Anply tile adhesive tothe wallin the required thickness, + Tiles shall be placed according to level shown in drawing and shall be placed firmly wit the help of rubber mallet, + Remove and reset for sold bearing tles that give hollow sound ven tapped wth steel od, ater instalation, + Ties shall be laid level or enough falls in wet areas as may be required + Particular care shall be taken in wet areas to prevent low spot and pooling of water. + The tes shall be neatty cut grnd rough on exposed edges around pipes & other obstructions. + Make provision of floor eras as per approved shop drawings + Silicon rubber sealant shal be inserted between tiles and sanitary ‘ngs. + When the instalation has hardened suffienty (after 48 hours) a thick grout of coment mixed with a minimum amount of waterfapproved grout shall be prepared and brushed over the floor ntl alte joints are thoroughiy filed. + Surplus material shall be removed witha dry cath iptv methodstatemertha.com/methee-statement-or-tling-work Him

You might also like