0% found this document useful (0 votes)
115 views

Scope of Supply/Work For Protection Relay and Control Panels

This document outlines the scope of supply and work for protection relay and control panels for a power plant project in Saudi Arabia. It details the division of responsibilities between the supplier and purchaser. The supplier is responsible for designing, manufacturing, testing and supplying the panels, as well as installation and commissioning support. They will also provide training, manuals and rust prevention. The purchaser is responsible for field installation labor, insulation/lagging work, and inland transportation to the port.

Uploaded by

bill
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
115 views

Scope of Supply/Work For Protection Relay and Control Panels

This document outlines the scope of supply and work for protection relay and control panels for a power plant project in Saudi Arabia. It details the division of responsibilities between the supplier and purchaser. The supplier is responsible for designing, manufacturing, testing and supplying the panels, as well as installation and commissioning support. They will also provide training, manuals and rust prevention. The purchaser is responsible for field installation labor, insulation/lagging work, and inland transportation to the port.

Uploaded by

bill
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Scope of Supply/Work for Protection Relay and Control Panels

PROJECT: JAZAN - INTEGRATED GASIFICATION COMBINED CYCLE (IGCC) DS NO:

CUSTOMER: SAUDI ARABIAN OIL COMPANY DESC:

PLANT LOC: SAUDI ARABIA REV:

EQ TAGs:

DIVISION OF RESPONSIBILITY(Included but not be limited to)


ITEM DESCRIPTION BY Supplier
A Scope of supply
Protection Relay and Control Panels as mentioned in the Specification, X
1 Datasheet and Drawings
Nameplate shall be abrasion resistant, stainless steel and attached with X
2
stainless steel hardware
3 Coordination with Owner for cable connection interface X
c
Nameplate, lifting lugs and earth lug for individual Equipment & Package X
5

All supporting steel work, platform, walkway,stair case and hardware,


which from part of the complete installation of the equipment including
steel foundation frame, anchor bolts, holding down bolts, buses,
6 insulators, flexible connectors, etc., required for all mechanical and X
electrical items.

7 Anchor bolt, nuts and washers (To be galvanized) X


Special tools for erection and maintenance (Optional) X
8

Critical spare parts (Optional) X


9

Installation and commissioning spare parts (Optional) X


10

Maintenance and operational spare parts for two years (Optional) X


11
Operation and Maintenance Manual X
12

13 Operation materials if required X


14 Interface points as per MR layout including all wall penetrating GIB X
brackets, support structures and fixtures.

B Scope of work
SERVICES
Drawings and Documents of Supplier-supplied equipment with sufficient
1.1 X
details for installation and maintenance.
1.2 Design, engineering and documentation X
1.3 Manufacturing X
1.4 Factory Shop Tests X
1.5 Factory Performance test X
1.6 Additional Factory Tests X
1.7 On-site Testing X
1.8 Site acceptance test X
1.9 Installation work

Page 1 OF 4
Scope of Supply/Work for Protection Relay and Control Panels
PROJECT: JAZAN - INTEGRATED GASIFICATION COMBINED CYCLE (IGCC) DS NO:

CUSTOMER: SAUDI ARABIAN OIL COMPANY DESC:

PLANT LOC: SAUDI ARABIA REV:

EQ TAGs:

DIVISION OF RESPONSIBILITY(Included but not be limited to)


ITEM DESCRIPTION BY Supplier
1.10 Training of operating and maintenance personnel X
1.11 Painting (primer, finish) work at factory X
1.12 Rust preventing treatment X
1.13 Monthly Progress Report X
1.14 Operating and maintenace manuals X
1.15 Startup and testing assisstance X
1.16 Field erection labor and equipment
1.17 Project Review Meetings X
1.18 Constructability Review X
Supervisory sevice for installation and test operation (perdiem X
1.19
basis)
1.20 Insulation and lagging work X
Seaworthy export packing and inland transportation to the X
1.21 port (FOB)

Page 2 OF 4
k for Protection Relay and Control Panels
SEP-PGB-EL-SOW-0036

Protection Relay and Control Panels

00 DATE: 14-Mar-16

ONSIBILITY(Included but not be limited to)


BY Purchaser COMMENTS

To be quoted separately

To be quoted separately

To be quoted separately

To be quoted separately

SERVICES

Page 3 OF 4
k for Protection Relay and Control Panels
SEP-PGB-EL-SOW-0036

Protection Relay and Control Panels

00 DATE: 14-Mar-16

ONSIBILITY(Included but not be limited to)


BY Purchaser COMMENTS

X
X
X

Page 4 OF 4