Engr. Shah Alam Afridi: Experience

This document contains the contact information and resume of Engr. Shah Alam Afridi. It lists his professional experience working for organizations such as NESPAK HOUSE, LAHORE; HIGHER EDUCATION COMMISSION, ISLAMABAD; and SPD(Strategic Plans Division) in various engineering roles related to construction projects, contracts, and development work. It provides details of his responsibilities, achievements and roles on projects worth billions of Pakistani rupees.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views

Engr. Shah Alam Afridi: Experience

This document contains the contact information and resume of Engr. Shah Alam Afridi. It lists his professional experience working for organizations such as NESPAK HOUSE, LAHORE; HIGHER EDUCATION COMMISSION, ISLAMABAD; and SPD(Strategic Plans Division) in various engineering roles related to construction projects, contracts, and development work. It provides details of his responsibilities, achievements and roles on projects worth billions of Pakistani rupees.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

House#10 Lane#4 Chaklala Scheme-1 Cell: +92-333-9409853

Rawalpindi Cantt-

Email: [email protected] DOB = 25th April,1983


[email protected]

Engr. Shah Alam Afridi


_______________________________________________________________________________________

Experience

April, 2019 till Date NESPAK HOUSE, LAHORE

Senior Engineer-Civil (CONTRACTS DIVISION)

▪ Preparation and review of Pre-qualification documents


▪ Preparation and review of Pre-qualification reports
▪ Preparation and review of Bidding documents for Civil, E&M Works
Contracts and Turnkey (EPC) Contracts
▪ Preparation and review of Bid evaluation reports and assistance
▪ Preparation of conformed Contract documents
▪ Preparation and review of Variation orders
▪ Contract interpretations
▪ Preparation and review of amendments to Contract(s)
▪ Review of Engineer's decision
▪ Preparation and review of memorandum of understanding (MoU), Joint
venture/Consortium Agreements, etc.
▪ Preparation and review of Contracts for Consultancy Services
▪ Review of Contractor’s EOT(Extension of Time) & Additional Payment
Claims

Dec, 2016 to Mar,2019 HIGHER EDUCATION COMMISSION,ISLAMABAD,


Planning & Development/Monitoring & Evaluation Division

Senior Engineer-Civil (University of Central ASIA & Pakistan)


(Project Cost – PK Rs. 4 Billion)

▪ Planning and scheduling the development activities of the university including


master planning, detail designing and construction as per PC-1 targets.
▪ Preparation & review of Civil Works component of PC-1 of public sector
universities
▪ Pre-Qualification of Consultants (Region & Category wise) throughout
Pakistan for HEC funded developmental projects of Universities/HEI’s
▪ Review of hiring process of consultants & contractors for HEC funded
developmental projects of universities on behalf of HEC

Engr. Shah Alam Afridi -1-


_____________________________________________________________________________________
▪ Review of contract documents to be executed with consultants & contractors
for HEC funded developmental projects of HEI’s
▪ Preparation & review of Prequalification document & tender/bid documents for
hiring of Contractors
▪ Standardization in design & specifications for uniformity in construction cost of
buildings to be constructed under HEC funded developmental projects of HEI’s
▪ Top supervision on HEC funded developmental projects of HEI’s
▪ Preparation of Pre-qualification Documents & RFP’s for Procurement of
Consultancy Services & Construction Firms as per PEC/PPRA rules
▪ Evaluation of Consultant’s & Contractor’s Technical & Financial Proposals
▪ Award of contract to successful consultants & contractors
▪ Review/approval of preliminary designs of buildings & Master Plan proposed
by the consultant
▪ Monitoring, periodic reviews of project progress, updating and control.
▪ Coordination with the consultant & contractor on behalf of senior
management.
▪ Delivering the Project from inception to Completion.
▪ Contract’s Management and Project Control as an Engineer In- Charge.
▪ Approval/payments to consultant & contractor as per the contract agreement
▪ Ensuring the completion of project with in approved timeline and budget
▪ Civil works comprises of buildings (Multi-storey framed & load bearing wall
structures) & services (Water Supply, Sewerage/Solid Waste Management,
Roads/Walk Ways, Electricity/Standby Generators, HVAC, IT/Tel, Fire alarm
system, Video Conferencing/Public Address System, Sui Gas network etc.)

Jan2010 till Nov2016 SPD(Strategic Plans Division)


SO-III/Deputy Assistant Director (Works & Maintenance) SPS-08
(Project Cost – PK Rs. 3 Billion)

▪ Contract’s Management and Project Control as an Engineer In- Charge


▪ Projects estimation ,feasibility & Approval
▪ Delivering the Project from inception to Completion
▪ Procurement of Consultancy Services, Civil Works & Goods
▪ Dealing with all contractors and consultants as Department Head
▪ Assurance of Quality as defined in technical specifications.
▪ Detail supervision on contractor’s & supervisory staff
▪ Tendering/Bidding & award of Works
▪ Presenting the Monthly Progress Reports in Quarterly Progress review
meetings.
▪ Approval of Interim Payment Certificate
▪ Ensuring the completion of project with in approved timeline and budget
▪ Addendum Approval
▪ Variation orders Approval
▪ Rate Analysis Approval

Engr. Shah Alam Afridi -2-


_____________________________________________________________________________________
▪ Tech Check of Construction Drawings
▪ Review/Tech Check of Geo-Technical Site Investigation Report
▪ Handing-Taking proceedings/Approval of Completed Works
▪ Maintenance of Handed over works
▪ Escalation Claims Approval
▪ Led a maintenance team with 50 staff strength comprising of engineers,
sub-engineers, tradesmen & un-skilled staff.
▪ Responsible for the complete development & maintenance works of the
facility spreading over the area of 12,000 Kanals.
▪ Civil works comprises of buildings (Multi-storey framed & load bearing wall
structures/pre-fabricated steel structures) & services (Water Supply including
installation of tube wells/water filtration plants, Sewerage system/Solid Waste
Management, Roads/Walk Ways, Electricity/Standby Generators, HVAC,
IT/Tel, Fire alarm system, Video Conferencing/Public Address System,
Access Control System, Sui Gas network, Storm Water Drainage etc.)

Aug 2006 -- Dec 2009 Associated Consulting Engineers (ACE-Arts)


Project Engineer Capt- Karnal Sher Khan SH(NH) Cadet
College Swabi

(Project Cost – Pk Rs. 1 Billion)

▪ Site supervision.
▪ Quality control.
▪ Checking Surveys
▪ IPC’s checking. (Running Bills)
▪ Dealing with BOQs
▪ Quantities Computation & Verification
▪ Variation orders Preparation & Approval
▪ Addendums Approval
▪ Rate Analysis Preparation
▪ Bar-bending Schedule Approval and Checking on Site as per Structural
Design
▪ Progress Report Preparation
▪ Check of As-Built Dwgs

12th Dec 05 – July06 International Medical Corps(IMC/USA NGO)


Watsan Engineer NWFP Earthquake Affected Areas

▪ Managing Water Supply & Sanitation Schemes in Earth Quake affected


Areas Undertaken by IMC
▪ Preparation of Initial & Detail Assessment Reports for rehabilitation and
restoration of above Schemes

▪ Supervision of above Schemes by making frequent and long distant visits to

Engr. Shah Alam Afridi -3-


_____________________________________________________________________________________
sites
▪ Representation of Organization in Cluster Meetings held under umbrella of
Unicef for detail description of the current status of all Watsan sites
undertaken by IMC
▪ Requisition of materials required for Schemes as per Detail Assessment
Report
▪ Maintaining Logistic Record of all the materials Pro-cured/not Pro-cured as
per requisitions and supplied to sites in Collaboration with Logistic Officer
▪ Supply of Material to Sites As per Detail Assessment
▪ Progress Report Preparation of all the Schemes
▪ Dealing with the Communities for motivating and encouraging them to help
themselves for the Restoration of Watsan Schemes
▪ Involving the Community to work for their selves by giving them incentives
like cash for work and Hygiene Kits Supplied through our Hygiene Promotion
Team.

Aug 2005 –11 Dec 2005 Associated Consulting Engineers(ACE-Arts)


Site Engineer NWFP Assembly Building Project, Peshawar

▪ Site supervision.
▪ Check Survey.
▪ Quality control.
▪ IPC’s checking.
▪ Bar-Bending Schedule Checking and Approval
▪ Quantities Computation & Verification
▪ Preparation of As Built Drawings

2014-2016 M.Sc Geotechnical Engineering from NUST Islamabad


Qualifications (CGPA = 3.25)

2001-2005 BSc. Civil Engineering from NWFP University of Engineering


& Technology Peshawar with honors(securing 72% Agg- marks)

1998-2000 F.Sc (Pre engineering) from PAF Inter College Kohat

1996-1998 S.S.C ( Science Group) from FG Boys High School Kohat

Professional
Affiliation Member Pakistan Engineering Council as a Professional Engineer
CIVIL/26835

Engr. Shah Alam Afridi -4-


_____________________________________________________________________________________

Specific ▪ Preparation of Prequalification document & RFP for hiring of


Assignment Consultant
▪ Pre-Qualification of Consultants (Region & Category wise) throughout
Pakistan for HEC funded developmental projects of Universities/HEI’s
▪ Review of hiring process of consultants & contractors for HEC funded
developmental projects of universities on behalf of HEC
▪ Review of contract documents to be executed with consultants &
contractors for HEC funded developmental projects of HEI’s
▪ Preparation & review of Prequalification document & tender/bid
documents for hiring of Contractors
▪ Review of Civil Works component of PC-I of Universities
▪ Standardization of Designs & specifications for uniformity in
construction cost
▪ Top supervision on HEC funded developmental projects of HEI’s
▪ Contract’s Management and Construction Supervision of buildings &
infrastructure including roads/culverts, parking/walkways, storm water
drains, IT/Tel network, external electrical/water supply/sewerage & sui
gas network system, landscaping ,slope stability, solid waste
management etc.
▪ Quality Control
▪ Project Management
▪ IPC vetting & Approvals
▪ Variation orders & Addendum Preparation/Approval
▪ Preparation of Bill of Quantities.
▪ Erection of Pre-Fab Steel Structure

Engr. Shah Alam Afridi -5-


_____________________________________________________________________________________

Computer
skills/Courses ▪ Experienced user of Computer Application Software including Operating
Systems (MS DOS, MS Windows), Microsoft Office (MS Excel, MS Word,
MS Power Point)
▪ Plotting of drawings by using AutoCAD
▪ MS Project 2000
▪ AutoCAD 2000
▪ Sap 2000
▪ Phase-2 (Flow net/Seepage analysis Software)
▪ Slide-6 (Slope Stability Software)

Seismic Design of Buildings by using provisions of NEHRP (National


Final Year Project Earthquake Hazard Reduction Program) Code published by Federal
Emergency Management Agency (USA).

Read Write Speak Understand


Lingual Ability
English: Excellent Excellent Good Excellent

Urdu: Excellent Excellent Excellent Excellent

Pashto: Good Good Excellent Excellent

Engr. Shah Alam Afridi -6-