This document provides an estimate of costs for the New Priok Project. It includes estimates for: 1) Procurement of storage tank cleaning, spare nozzle gun units, and consumable materials totaling 136.65 million. 2) Maintenance of fuel management systems, mechanical equipment, and vehicles totaling 93.25 million. 3) A total estimated cost of 229.9 million plus 10% VAT of 22.99 million for a grand total project cost of 252.89 million. Notes provide sources for pricing and indicate some items like spare parts are excluded from estimates.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views14 pages

JICT Project - Asset Manag.

This document provides an estimate of costs for the New Priok Project. It includes estimates for: 1) Procurement of storage tank cleaning, spare nozzle gun units, and consumable materials totaling 136.65 million. 2) Maintenance of fuel management systems, mechanical equipment, and vehicles totaling 93.25 million. 3) A total estimated cost of 229.9 million plus 10% VAT of 22.99 million for a grand total project cost of 252.89 million. Notes provide sources for pricing and indicate some items like spare parts are excluded from estimates.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 14

ESTIMASI BIAYA NEW PRIOK PROJECT

NO. ITEM

A PENGADAAN

1 Cleaning storage tank

2 Kalibrasi storage tank

3 Kalibrasi Flowmeter

4 Spare Nozzle Gun unit

B MAINTENANCE
1 Fuel Management System

RFID I Button
RFID I Button
ATG unit

2 Mechanical Equipments
OK PROJECT 450/lt

TOTAL
DESCRIPTION UNIT MEA. UNIT PRICE (Rp)
QTY

Cleaning for storage tank 16KL unit 5


Cleaning for storage tank 20KL unit 3
Kalibrasi for storage tank 16KL unit 7,200,000.00 5
Kalibrasi for storage tank 20KL unit 9,000,000.00 3
Kalibrasi flowmeter berkala setiap 6 bulan set 4,500,000.00 1
Kalibrasi dispenser set 3,500,000.00 2
Cadangan untuk Nozzle Gun unit unit 1,750,000.00 9
Comsumable material set 15,000,000.00 3
Sub Total

Maintenance untuk equipments di Head Office (HO) set 1


Maintenance untuk equipments di unit truck Distribusi set 1
Maintenance untuk equipments di unit (alat berat dll) set 1
Maintenance untuk equipments di storage tank set 1

PTO set 1
Loading arm set 1
Flowmeter set 1
Jalur tangki storage set 1
Pump set 1

Sub Total

Total
Ppn 10%
Total

Prepared, by
TOTAL
KETERANGAN
PRICE

75,900,000.00 PT Yuti Pratama Sukses (Sudah pernah dipakai di TSS-Sukabumi)

36,000,000.00
PT Yuti Pratama Sukses
27,000,000.00
4,500,000.00
7,000,000.00 estimasi
15,750,000.00
45,000,000.00
211,150,000.00

35,000,000.00
jumlah alat yang di supply masih estimasi

30,000,000.00 Belum termasuk biaya penggantian spare part (Kreassindo)

65,000,000.00

276,150,000.00
27,615,000.00
303,765,000.00
ESTIMASI BIAYA NEW PRIOK PROJECT

NO. ITEM

A STORAGE TANK
1 Cleaning storage tank
2 kalibrasi storage tank
3 Kalibrasi Flowmeter

B FUEL TRUCK 5KL


1 Unit fuel truck
2 Karoseri tangki

C FUEL MANAGEMENT SYSTEM


1 Identifikasi Asset
RFID Tag
2 Refueling Tank Truck System
Pump Control
Interface data procecing POS FT
RFID Controller
RFID Nozzle
Isolated Converter RS 232-487
Kabel komunikasi dengan metal condoit
Wireless
3 Instalasi transportasi dan Akomodasi
Instalasi
Transportasi dan Akomodasi
Pengkabelan Kelistrikan
DC to DC converter
Pengkabelan Komunikasi Data
Biaya Transportasi dan Akomodasi

D MAINTENANCE
1 Maintenance

Note.
1 Biaya hanya berupa estimasi dari penawaran vendor
2 Untuk lebih detailnya perlu dilakukan site survey oleh team vendor FMS
3 Kebutuhan FMS sesuai dengan info team sales, hanya sebagai identifikasi unit
OK PROJECT

DESCRIPTION UNIT MEA.

Cleaning for storage tank 30KL set


Kalibrasi storage tank 30KL set
Kalibrasi flowmeter berkala setiap 1 Tahun set

Truck kapasitas 5 KL Set


Fabrikasi tangki (Include PTO, Flowmeter LC digital, dll.) Set

Tag yang tertempel di unit sesuai dengan jumlah unit ea


Set

ls

Maintenance peralatan Tahun


enawaran vendor
n site survey oleh team vendor FMS
eam sales, hanya sebagai identifikasi unit
TOTAL
UNIT PRICE (Rp)
QTY PRICE

32,000,000.00 2 64,000,000.00
45,000,000.00 2 90,000,000.00
1,500,000.00 12 18,000,000.00
Sub Total 172,000,000.00

287,000,000.00 1
435,000,000.00 1
Sub Total -

750,000.00 50 37,500,000.00
185,000,000.00 1 185,000,000.00

15,000,000.00 1 15,000,000.00

Sub Total 237,500,000.00

35,000,000.00 3 105,000,000.00

Sub Total 105,000,000.00

Total 514,500,000.00
Ppn 10% 51,450,000.00
Total 565,950,000.00
Prepared, by

Rizal S

Asset Management
KETERANGAN

Sumber Cahaya Skala

Pengadaan unit truck by Seino


Sumber Seino (Pak Alfon)
Sumber Porter Rekayasa Unggul (Faisal)

Sumber PT Penta Global

Belum memperhitungkan penambahan unit kedepan


ESTIMASI BIAYA NEW PRIOK PROJECT

NO. ITEM

A PENGADAAN

1 Cleaning storage tank

2 Spare Nozzle Gun unit

B MAINTENANCE
1 Fuel Management System
RFID TAG
Refueling Tank Truck System
Storage Tank System
Head Office FMS

2 Mechanical Equipments

3 Sparepart dan adm kendaraan


OK PROJECT 450/lt

TOTAL
DESCRIPTION UNIT MEA. UNIT PRICE (Rp)
QTY

Cleaning for storage tank 16KL unit 5


Cleaning for storage tank 20KL unit 3
Cadangan untuk Nozzle Gun unit unit 1,750,000.00 9
Comsumable material set 15,000,000.00 3
Sub Total

Maintenance untuk equipments set 1


Maintenance untuk equipments set 1
Maintenance untuk equipments set 1
Maintenance untuk equipments set 1

PTO set 1
Loading arm set 1
Flowmeter set 1
Jalur tangki storage set 1
Pump set 1

Ganti oli 1
Ganti Ban 1
Sparepart lainnya 1
Perpanjangan KIR 1
Perpanjangan STNK 1
Service berkala (Ganti oli, Ban, dll) 1

Sub Total

Total
Ppn 10%
Total

Prepared, by
TOTAL
PRICE

75,900,000.00

15,750,000.00
45,000,000.00
136,650,000.00

63,250,000.00

30,000,000.00

93,250,000.00

229,900,000.00
22,990,000.00
252,890,000.00
KETERANGAN

PT Yuti Pratama Sukses (Sudah pernah dipakai di TSS-Sukabumi) cleaning per 6 bulan

Harga dari PT Penta Global Technology

Belum termasuk biaya penggantian spare part (Kreassindo)

Minta list service rutin kendaraan ke pihak JICT

Biaya maintenance per tahun