JICT Project - Asset Manag.
JICT Project - Asset Manag.
NO. ITEM
A PENGADAAN
3 Kalibrasi Flowmeter
B MAINTENANCE
1 Fuel Management System
RFID I Button
RFID I Button
ATG unit
2 Mechanical Equipments
OK PROJECT 450/lt
TOTAL
DESCRIPTION UNIT MEA. UNIT PRICE (Rp)
QTY
PTO set 1
Loading arm set 1
Flowmeter set 1
Jalur tangki storage set 1
Pump set 1
Sub Total
Total
Ppn 10%
Total
Prepared, by
TOTAL
KETERANGAN
PRICE
36,000,000.00
PT Yuti Pratama Sukses
27,000,000.00
4,500,000.00
7,000,000.00 estimasi
15,750,000.00
45,000,000.00
211,150,000.00
35,000,000.00
jumlah alat yang di supply masih estimasi
65,000,000.00
276,150,000.00
27,615,000.00
303,765,000.00
ESTIMASI BIAYA NEW PRIOK PROJECT
NO. ITEM
A STORAGE TANK
1 Cleaning storage tank
2 kalibrasi storage tank
3 Kalibrasi Flowmeter
D MAINTENANCE
1 Maintenance
Note.
1 Biaya hanya berupa estimasi dari penawaran vendor
2 Untuk lebih detailnya perlu dilakukan site survey oleh team vendor FMS
3 Kebutuhan FMS sesuai dengan info team sales, hanya sebagai identifikasi unit
OK PROJECT
ls
32,000,000.00 2 64,000,000.00
45,000,000.00 2 90,000,000.00
1,500,000.00 12 18,000,000.00
Sub Total 172,000,000.00
287,000,000.00 1
435,000,000.00 1
Sub Total -
750,000.00 50 37,500,000.00
185,000,000.00 1 185,000,000.00
15,000,000.00 1 15,000,000.00
35,000,000.00 3 105,000,000.00
Total 514,500,000.00
Ppn 10% 51,450,000.00
Total 565,950,000.00
Prepared, by
Rizal S
Asset Management
KETERANGAN
NO. ITEM
A PENGADAAN
B MAINTENANCE
1 Fuel Management System
RFID TAG
Refueling Tank Truck System
Storage Tank System
Head Office FMS
2 Mechanical Equipments
TOTAL
DESCRIPTION UNIT MEA. UNIT PRICE (Rp)
QTY
PTO set 1
Loading arm set 1
Flowmeter set 1
Jalur tangki storage set 1
Pump set 1
Ganti oli 1
Ganti Ban 1
Sparepart lainnya 1
Perpanjangan KIR 1
Perpanjangan STNK 1
Service berkala (Ganti oli, Ban, dll) 1
Sub Total
Total
Ppn 10%
Total
Prepared, by
TOTAL
PRICE
75,900,000.00
15,750,000.00
45,000,000.00
136,650,000.00
63,250,000.00
30,000,000.00
93,250,000.00
229,900,000.00
22,990,000.00
252,890,000.00
KETERANGAN
PT Yuti Pratama Sukses (Sudah pernah dipakai di TSS-Sukabumi) cleaning per 6 bulan