B1mtbe Remaining Work Schedule

This document is a project schedule for PT. WINTECO INDONESIA detailing activities from July 1, 2019 through September 30, 2019. It includes the activity description and planned start and finish dates for each day during that time period. The title indicates it is for the remaining works and punch list of the B1MTBE project.

Uploaded by

Irvan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views

B1mtbe Remaining Work Schedule

This document is a project schedule for PT. WINTECO INDONESIA detailing activities from July 1, 2019 through September 30, 2019. It includes the activity description and planned start and finish dates for each day during that time period. The title indicates it is for the remaining works and punch list of the B1MTBE project.

Uploaded by

Irvan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

B1MTBE PROJECT - IKPT - PBI

PT. WINTECO INDONESIA

REMAINING SCHEDULE

2019

DURATION
PLAN SCHEDULE
Jul Aug Sep
ACTIVITY DESCRIPTION

01-Aug-19
02-Aug-19
03-Aug-19
04-Aug-19
05-Aug-19
06-Aug-19
07-Aug-19
08-Aug-19
09-Aug-19
10-Aug-19
11-Aug-19
12-Aug-19
13-Aug-19
14-Aug-19
15-Aug-19
16-Aug-19
17-Aug-19
18-Aug-19
19-Aug-19
20-Aug-19
21-Aug-19
22-Aug-19
23-Aug-19
24-Aug-19
25-Aug-19
26-Aug-19
27-Aug-19
28-Aug-19
29-Aug-19
30-Aug-19
31-Aug-19
01-Sep-19
02-Sep-19
03-Sep-19
04-Sep-19
05-Sep-19
06-Sep-19
07-Sep-19
08-Sep-19
09-Sep-19
10-Sep-19
11-Sep-19
12-Sep-19
13-Sep-19
14-Sep-19
15-Sep-19
16-Sep-19
17-Sep-19
18-Sep-19
19-Sep-19
20-Sep-19
21-Sep-19
22-Sep-19
23-Sep-19
24-Sep-19
25-Sep-19
26-Sep-19
27-Sep-19
28-Sep-19
29-Sep-19
30-Sep-19
01-Jul-19
02-Jul-19
03-Jul-19
04-Jul-19
05-Jul-19
06-Jul-19
07-Jul-19
08-Jul-19
09-Jul-19
10-Jul-19
11-Jul-19
12-Jul-19
13-Jul-19
14-Jul-19
15-Jul-19
16-Jul-19
17-Jul-19
18-Jul-19
19-Jul-19
20-Jul-19
21-Jul-19
22-Jul-19
23-Jul-19
24-Jul-19
25-Jul-19
26-Jul-19
27-Jul-19
28-Jul-19
29-Jul-19
30-Jul-19
31-Jul-19
Start Finish

B1MTBE - Remaining Works - Punch List


FB-8722A
DOCUMENTATION
0 0 0 0 0 0 0 0 0 0 0 0
Revision of Drawing - for Approval [AP] 23-Jul-19 03-Aug-19 12
0 0 0 0 0 0 0 0 0 0 0 0
Revision of Procedure - for Approval [AP] 23-Jul-19 03-Aug-19 12
0 0 0 0 0 0 0 0 0 0 0 0
Inspection and Test Report 23-Jul-19 03-Aug-19 12
CONSTRUCTION
0 0 0 0 0 0
Installation of Scaffolding - Tower 07-Jul-19 12-Jul-19 6
Shell and Bottom Part
0 0 0 0 0 0 0 0 0
Welding of annular 14-Jul-19 22-Jul-19 9
1
Inspection and Test - PT 23-Jul-19 23-Jul-19 1
1
Inspection and Test - Bottom - VBT 24-Jul-19 24-Jul-19 1
Stairway
0 0 0 0
Marking of pad plate position 12-Jul-19 15-Jul-19 4
0 0 0 0 0 0 0
Fit up and welding pad plate 16-Jul-19 22-Jul-19 7
0 0 0 0 0 0 0
Fit up and welding support 18-Jul-19 24-Jul-19 7
0 0 0 0 0
Installation of handrail 25-Jul-19 29-Jul-19 5
0 0 0 0 0
Installation of ladder step 26-Jul-19 30-Jul-19 5
1
Inspection and Test 31-Jul-19 31-Jul-19 1
Roof Platform
0 0 0 0 0
Installation of platform 26-Jul-19 30-Jul-19 5
0 0 0 0 0
Installation of gratings 27-Jul-19 31-Jul-19 5
1
Inspection and Test 01-Aug-19 01-Aug-19 1
HYDROTEST
1
Equipments and Tools at site 27-Jul-19 27-Jul-19 1
1
Inspection and Test 28-Jul-19 28-Jul-19 1
Installation of Temporary Line
1 1
Laying of flexible hose to tie in point 29-Jul-19 30-Jul-19 2
0 0 0
Installation of temporary blind 30-Jul-19 01-Aug-19 3
1
Setting up water filling pump 01-Aug-19 01-Aug-19 1
1
Install and setting instrument devices 01-Aug-19 01-Aug-19 1
1
Commissioning - Trial Test 02-Aug-19 02-Aug-19 1
Water Filling
1
25% Water Filled 04-Aug-19 04-Aug-19 1
1
50% Water Filled 05-Aug-19 05-Aug-19 1
1
75% Water Filled 06-Aug-19 06-Aug-19 1
1
100% Water Filled 07-Aug-19 07-Aug-19 1
1
Holding Time 08-Aug-19 08-Aug-19 1
1
Dewatering 09-Aug-19 09-Aug-19 1
1 1
Tank Cleaning - Water Jetting 10-Aug-19 11-Aug-19 2
PAINTING
1
Equipments and Tools at site 02-Aug-19 02-Aug-19 1
1
Inspection and Test 03-Aug-19 03-Aug-19 1
Installation
1
Installation of Gondola 12-Aug-19 12-Aug-19 1
1
Installation of Cover Sheet 13-Aug-19 13-Aug-19 1
Painting Work
0 0 0 0 0 0 0
Painting application 14-Aug-19 20-Aug-19 7
Box Up
COMPLETION
PT. WINTECO INDONESIA
B1MTBE PROJECT - IKPT - PBI

Inspection and Test


Painting application

Installation of Name Plate

Final Inspection and Handover


REMAINING SCHEDULE

ACTIVITY DESCRIPTION

B1MTBE - Remaining Works - Punch List


Start

24-Aug-19
23-Aug-19
22-Aug-19
21-Aug-19
14-Aug-19
PLAN SCHEDULE

Finish

24-Aug-19
23-Aug-19
22-Aug-19
21-Aug-19
20-Aug-19

DURATION
1
1
1
1
7

01-Jul-19
02-Jul-19
03-Jul-19
04-Jul-19
05-Jul-19
06-Jul-19
07-Jul-19
08-Jul-19
09-Jul-19
10-Jul-19
11-Jul-19
12-Jul-19
13-Jul-19
14-Jul-19
15-Jul-19
16-Jul-19
Jul

17-Jul-19
18-Jul-19
19-Jul-19
20-Jul-19
21-Jul-19
22-Jul-19
23-Jul-19
24-Jul-19
25-Jul-19
26-Jul-19
27-Jul-19
28-Jul-19
29-Jul-19
30-Jul-19
31-Jul-19
01-Aug-19
02-Aug-19
03-Aug-19
04-Aug-19
05-Aug-19
06-Aug-19
07-Aug-19
08-Aug-19
09-Aug-19
10-Aug-19
11-Aug-19
12-Aug-19
13-Aug-19
14-Aug-19
15-Aug-19
16-Aug-19
2019
Aug

17-Aug-19
18-Aug-19
19-Aug-19
20-Aug-19
1

21-Aug-19
1

22-Aug-19
1

23-Aug-19
1

24-Aug-19
25-Aug-19
26-Aug-19
27-Aug-19
28-Aug-19
29-Aug-19
30-Aug-19
31-Aug-19
01-Sep-19
02-Sep-19
03-Sep-19
04-Sep-19
05-Sep-19
06-Sep-19
07-Sep-19
08-Sep-19
09-Sep-19
10-Sep-19
11-Sep-19
12-Sep-19
13-Sep-19
14-Sep-19
15-Sep-19
Sep

16-Sep-19
17-Sep-19
18-Sep-19
19-Sep-19
20-Sep-19
21-Sep-19
22-Sep-19
23-Sep-19
24-Sep-19
25-Sep-19
26-Sep-19
27-Sep-19
28-Sep-19
29-Sep-19
30-Sep-19