0% found this document useful (0 votes)
393 views1 page

APT Process

The document describes the APT annual performance test process for VDRs, which involves: 1. Preparing equipment like a PC, Ethernet cable, and card reader. 2. Initially checking the VDR has been operating properly for 48 hours without errors. 3. Downloading data from the VDR, checking for problems, and testing batteries and installation. 4. Sending the data, configuration file, and checklist to Headway for certification.

Uploaded by

krupa kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
393 views1 page

APT Process

The document describes the APT annual performance test process for VDRs, which involves: 1. Preparing equipment like a PC, Ethernet cable, and card reader. 2. Initially checking the VDR has been operating properly for 48 hours without errors. 3. Downloading data from the VDR, checking for problems, and testing batteries and installation. 4. Sending the data, configuration file, and checklist to Headway for certification.

Uploaded by

krupa kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

APT Annual Performance Test

Description of the APT process


1. Preparation.
2. Initial check of VDR.
3. Download of data from the VDR and Elimination of discovered problems (if any).
4. Battery test and manual check of VDR installation.
5. Send checklist, VDR data (5 minutes) and configuration file to Headway via email
([email protected]).
6. Headway issue S-VDR/VDR Certificate of Compliance. (COC must be issued by Headway).

**HMT-100A,pls just send the ‘cfg.ini’ to us.

**HMT-S100/100, pls send entire data folder to us.

Note: the ‘cfg.ini’ is in SD1. Pls switch off the VDR befor take out the card.

Preparation
 A PC with an Ethernet port and the latest version of the VDR software is required.  
An Ethernet patch cable and card reader is required.
A beacon tester is required for testing the beacon.
A hard copy of the APT checklist is required.
A programmer for the float-free capsule is required.

Initial check of VDR


VDR must in general have been operating properly for 48 hours prior to the APT test without any err and
alarm.

You might also like