Inspection Report: 6302 Avenue U, Brklyn 14403-183

New electrical conduit pipes installed at various rooms of a building located at 6302 AVENUE U, BRKLYN were inspected. The joints of the new pipes were sealed using the approved fire stopping material Hilti FS-one max. The inspected work was found to be satisfactory with no deficiencies noted. Photos were taken to document the inspection.

Uploaded by

omar elshahat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
115 views

Inspection Report: 6302 Avenue U, Brklyn 14403-183

New electrical conduit pipes installed at various rooms of a building located at 6302 AVENUE U, BRKLYN were inspected. The joints of the new pipes were sealed using the approved fire stopping material Hilti FS-one max. The inspected work was found to be satisfactory with no deficiencies noted. Photos were taken to document the inspection.

Uploaded by

omar elshahat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

MUNICIPAL TESTING LABORATORY, INC.

___ ATTENTION:
375 Rabro Drive, Hauppauge, NY 11788  Tele: 631-761-5555  www.mtllab.net
NYC DoB Special Inspection Agency #0230

SAMPLES TAKEN
INSPECTION REPORT Page 1 of ___

Project: SCA PS236K Date 02/05/2019


Address: 6302 AVENUE U, BRKLYN Job ID / MU #: 14403-183
Client: SCA Weather: 50F,4:00pm

Inspection Type: Firestopping Contractor:


General Area: 1st,2nd Floor and gymanisum room Sub-Contractor:
Specific Location: Reported To:
Present At Site: PO Winston dean
Last Inspection: NA Building Code Section: 1704.27
Drawings: E001,E201,E202,E203,T002
Reviewed
Submittals 07270-001-001
Approved :Other:

Deficiency: Resolution:

Request For Information:


Non-Conformance Report:
RFI # : Issued RFI # : Answered NCR # : Issued NCR # : Resolved NCR # : Open

New electrical conduit pipes installed at various rooms were visually inspected to be sealed using approved
fire stopping material. Hilti FS-one max was used to seal the joints.

Attachments/Photos: See attached

Inspected Work Satisfactory (Except As Noted): No: Re-inspection Required: Work Completed:

Inspector: ________Omar Elshahat___ _ _______Signature: __Omar Elshahat__________ Certification: _ _

NOTICE: The field representative is on site solely to observe operation of the contractor identified, for the work identified and it’s conformance to
the contract documents, and report those operations to the client. The presence and activities of the field representative do not relieve the
contractor’s obligation to meet contractual requirements. The contractor retains sole responsibility for site safety and means/methods of
construction sequences. The field representative is not responsible for identifying errors and omissions in the contract documents.