14 Months 14 Months
14 Months 14 Months
JOB TITLE : Cadangan Membina Satu Blok Bangunan Sekolah 4 Tingkat Yang Mengandungi: CLIENT:
1) Auditorium
2) Bilik Darjah
3) Makmal Sains
4) Bengkel Kemahiran Hidup
Brief Cost
4,990,056.00 L
4,204,498.00 L
3,569,890.00 L
3,107,850.00 L
139,890.98
110,633.93
3,797,408.52
LDING
n
emahiran Hidup"
m2 Design / Shapes
Percentage of Gross Floor Area
2486 (a) Below Ground Floor %
3855
(b) Single- Storey %
Construction
m (d) 3- Storey %
Construction
m
(e) 20- Storey %
m Construction
of remainder
Contract Sum
INSTITUTION OF SURVEYORS MALAYSIA
BUILDING COST INFORMATION CENTRE
2 Superstructure
2A Frame 533,672.13 138.44 5,110 m² 104.44 1.33
2B Upper Floor 333,727.82 86.57 4,245 m² 78.62 1.10
2C Roof and Roof Plumbing 185,377.61 48.09 1,558 m² 118.98 0.40
2D Staircase 47,105.47 12.22 - - -
2E External Wall 43,973.79 11.41 2,486 m² 17.69 0.64
2F Windows and External Doors 198,345.90 51.45 904 m² 219.41 0.23
2G Internal Walls & Partitions 45,488.91 11.80 2,356 m² 19.31 0.61
2H Internal Doors 16,657.76 4.32 73 m² 228.19 0.02
3. Finishes
3A Wall Finishes 207,179.82 53.74 1,836 m² 112.84 0.48
3B Floor Finishes 155,846.32 40.43 1,090 m² 142.98 0.28
3C Ceiling Finishes 89,381.24 23.19 1,308 m² 68.33 0.34
3D External Finishes 72,939.76 - - - -
5. Services
5A Sanitary Fittings 53,779.70 13.95 262 Nos 205.27 0.07
5B Plumbing Installation 173,713.29 45.06 - - -
5C Refuse Disposal - - - - -
5D Air-conditioning &
142,341.36 36.92 4,342 m² 32.78 1.13
Ventilation System
5E Electrical Installation 206,869.78 53.66 - - -
5F Fire Protection Installation 103,333.11 26.80 - - -
5G Lift & Conveyor Installation - - - - -
5H Communication Installation - - - - -
5J Special Installation - - - - -
5K Builder's Profit &
- - - - -
Attendance on Services
5L Builder's Work in
- - - - -
Connection With Services
6. External Works
6A Site Work 91,949.98 23.85
6B Drainage 112,554.00 29.20
6C External Services 9,648.00 2.50
6D Ancillary Buildings 125,612.00 32.58
6E Recreational Facilities
- - -
363.06 18,200.06 1,239.50
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
Work Below Lowest Floor Excavation,Reinforced concrete for pad footings, ground beams, column stu
1B Finish concrete for apron slab.
2 Superstructure
2A Frame Reinforced concrete column stump, beam, column, roof beam, suspended floor
reinforcement.
2B Upper Floors Reinforced concrete suspended floor slab,air cond ledge including formwork and
Mass concrete for water tank slab
2C Roof Pitch roof structure system on prefabricated steel roof trusses with monier miner
appoved colour laid to zincalume roofing sheet, including unplasticised polyvinyl
with all rainwater goods.
2D Staircase Reinforced concrete stair construction finished with cement and sand plaste
smooth with steel float
2E External Walls Generally 150mm thick clay brickwall including horizontal damp proof course, an
screen.
2F Windows & External Doors Composite aluminium frame casement window with fixed panels.
Frameless fixed glass window
Solid timber decorative door, aluminium frame glass door including painting and
2G Internal Walls & Partition Generally 150mm thick reinforced with and including a layer of "Exmet" at every
2H Internal Doors "Nyatoh" solid timber decorative door, HDF high density fibreboard flush door
Powder coated alumnium frame glass door including painting and ironmongeries
Tempered glass shower screen
3 Finishes
3A Internal Wall finishes NML porcelain tiles and NML ceramic tiles.
3C Internal Ceiling Finishes Boral Unispan concealed lightweight resilient gypsum plasterboard ceiling.
Nippon paint comprising one coat of Nippon Vinilex 5100 wall sealer and two coa
Weatherbond paint.
3D External Finishes -
4 Fittings and Furnishings -
5 Services
5A Sanitary Appliances Generally, "Johnson Suisse" water closet and basin and steel paper holder,
stainless steel double robe hook.
Generally, "Cristina Jako" acrylic corner whirlpool
Generally, "Mirage" for shower mixer, spray bidet and hole bath.
5D Air-Conditioning & Air cooled split unit system, air cooled packaged, electrical wiring and mechanica
Ventilation System
5E Electrical Installation Complete electrical services, telephone, sound reinforcement system, stage c
and stage lighting system.
5J Special Installation -
5L Builders's Work in -
Connection With Services
6 External Works
6A Site Works Site preparation and earthworks and all slope protection works including turfing.
Roadworks and car parks, fencing and gates, stainless steel sliding gate and bri
6B Drainage Stormwater drainage systems, manhole, foul drainage system and water re
fittings and accessories.
6C External Services -
ntal damp proof course, and also powder coated aluminium louvre
xed panels.
plasterboard ceiling.
100 wall sealer and two coats of Nippon
-
-
n and steel paper holder, soap holder, stainless steel towel ring,
hole bath.
ctrical wiring and mechanical ventilation system.
age system and water reticulation system which include all the
e.
Ground Floor
2 ANCILLARY AREA
3 CIRCULATION AREA
ST1 1 4.65 2.94 13.67
ST2 1 4.65 2.94 13.67
ST3 1 3.60 4.10 14.76
4 INTERNAL DIVISION
Toilet
4 7.20 0.12 3.31
2 2.43 0.12 0.56
5 4.15 0.12 2.39
Staircase -
ST1 1 4.65 0.12 0.53
ST2 1 4.65 0.12 0.53
ST3 1 4.16 0.12 0.48
1 3.60 0.12 0.41
TOTAL :
Ground Floor
Total
67.50
42.10
8.22
117.82
GFA
Upper Floor
2 ANCILLARY AREA
Toilet (Male) 1 4.39 7.50 32.89
3 CIRULATION AREA
Koridor
A 2 46.80 1.80 168.48
B 1 2.25 6.00 13.50
C 1 1.80 24.60 44.28
Staircase
ST1, 2 2 7.50 3.00 45.00
ST3 1 5.10 6.00 30.60
4 INTERNAL DIVISION
Brickwall
Makmal komputer 1 70.95 0.12 8.16
GFA
Upper Floor
TOTAL :
GFA
Upper Floor
Total
840.29
65.78
301.86
GFA
Upper Floor
43.72
1,251.64
GFA
Upper Floor
2 ANCILLARY AREA
Toilet (Male) 1 4.39 7.50 32.89
3 CIRULATION AREA
Koridor
A 2 46.80 1.80 168.48
B 1 2.25 6.00 13.50
C 1 1.80 24.60 44.28
Staircase
ST1, 2 2 7.50 3.00 45.00
ST3 1 5.10 6.00 30.60
4 INTERNAL DIVISION
Brickwall
Makmal Sains 1 70.95 0.12 8.16
-
toilet 3 7.50 0.12 2.59
6 4.15 0.12 2.86
GFA
Upper Floor
TOTAL :
GFA
Upper Floor
Total
840.43
65.78
301.86
GFA
Upper Floor
39.86
1,247.93
Upper Floor GFA
Auditorium
pentas 1 4.52 15.94 72.02
1 4.60 20.89 96.07
1 9.24 18.60 171.91
Ruang persalinan perempuan 1 4.39 2.39 10.46
Ruang persalinan lelaki 1 4.39 2.39 10.46
setor 2 3.20 1.05 6.72
2 ANCILLARY AREA
Toilet (Male) 1 4.39 7.50 32.89
3 CIRULATION AREA
Koridor
A 2 35.94 1.69 121.13
B 1 1.69 24.49 41.26
C 2 12.74 1.69 42.93
Staircase -
ST1,2 2 5.65 2.94 33.22
ST3 1 5.04 6.12 30.83
4 INTERNAL DIVISION
Brickwall
Upper Floor GFA
TOTAL :
Upper Floor GFA
Total
859.51
65.78
269.37
Upper Floor GFA
42.31
1,236.97
GFA
Not Enclosed
1 Ground Floor
Area 1 1 42.45 9.30 394.79
Area 2 1 4.65 6.15 28.60
Area 3 1 20.10 6.00 120.60
Area 4 1 4.65 6.15 28.60
Area 5 1 51.45 9.30 478.49
TOTAL :
GFA
Not Enclosed
Total
1,051.07
122.58
1,173.65
GFA
Roof
Less
1 ROOF
Overall 1 9.75 17.85 174.04
1 28.80 26.10 751.68
1 10.50 9.00 94.50
1 18.30 22.40 409.92
31.80 4.50 1 (143.10)
TOTAL :
Total
1,287.04
1,287.04
REF :
Eaves = 2'
Overhang = 4'